Title: D e s I g n a n d P l a n n I n g of the Glen Cove Ferry Terminal and Boat Basin
1D e s I g n a n d P l a n n I n g of the Glen
Cove Ferry Terminal and Boat Basin
City of Glen Cove
Urbitran Group In Association with FXFowle Halc
row HPA Associates Dvirka Bartilucci Michel
Associates
- Presentation to
- Long Island Sound Ferry Coalition
- June 5, 2007
2 Waterfront Context
DOWNTOWN GLEN COVE
Glen Cove Ave
Garvies Point Road
Glen Cove Creek
Hempstead Harbor
SEA CLIFF
3 Waterfront Context
4 Waterfront Context
5 History of the Creek
- City of Glen Cove founded on the banks of the
creek - Saw Mill supplied NYC with lumber in the late
17th century - Excavation and sale of clay became prominent in
the early 19th century - First steamboat operation in 1829 Glen Cove to
NYC - City becomes resort community
- Industry became prominent in latter half of 19th
century and declined through latter half of 20th
century
6 Components for Project Success
- Citys Vision Gold Coast Destination
- Glen Cove Creek Revitalization Plan, 1996
- Generic Environmental Impact Statement, 1999
- Glen Cove Creek Esplanade Phases I and 2
- US Army Corps of Engineers Roadway Feasibility
Study - Glen Cove Road Extension DR/EA, 2001
- Temporary Ferry Operation, Spring 2000 to
November 2001 - Environmental Remediation EPA, 2003 to ongoing
- PublicPrivate Partnership to Develop the
Waterfront
7Project Process
8 Needs
- Transportation Needs
- Environmental Needs
- Activate Revitalize the Waterfront
9 Overall Project Criteria
- Provide for an appropriately sized Ferry Terminal
Building - Iconic public building outdoor gathering place
- Programmable for public events
- Environmentally Sustainable
- Maintain existing location of Esplanade
- Bike and Pedestrian access to be provided through
project unimpeded
- Maintain existing location of Esplanade
- Unimpeded Bike and Pedestrian access to be
provided
- Design berthing area with flexibility to
accommodate many vessels - Side and front loading
- Provide fueling facilities and pump out
- Clean fueling options considered and designed
Clean Diesel and CNG
- Provide parking for 200 vehicles
10 Previous Service Issues
- Wrong vessel's for location and demand
- Overstaffed
- Impact of 911
- One vessel model
- Temporary feel Weak marketing support and client
building efforts - Exposed to wake and wind
11 Ridership Demand Forecast
- Review of Previous Glen Cove Ferry Data
- Long Island Sound Waterbourne Transport Study
- Review of Similar Studies
- Review of Existing Transit and Ferry Services in
the New York/Glen Cove Region - Review of Demographic and Journey-to-Work Data
(including mode split) - Estimate of Market Potential
12 Potential Commuter Market
- Previous Ferry Service Ridership of 250
Round-trips per day - Site, Terminal, and Service Improvements would
Increase Demand - Adjacent Residential Development anticipated to
Contribute potential of 100 Riders per day - Other factors could slightly or significantly
Increase Demand - Increased congestion for other modes
- Reduction or elimination of LIRR Oyster Bay
branch service
13 Potential Locations
Eastern Site
Central Site
Western Site
14 Site Screening
15 Site Conditions
- Environmental Remediation Essentially Complete
- Little or No Activity On-site or to the West
- Industrial and Water-related Uses to the East
- Existing Bulkhead
- Minimum Utilities
- Drainage/Stormwater
- Existing Views
- Existing Esplanade to the West
- Planned Development
- Channel
16 Existing Bulkhead
- Steel sheet pile wall
- Circa 1980
- 7.5 tidal range
- Top of bulkhead approximately 16.5 above MLW
- Fair condition with moderate corrosion
- Relatively close to edge of 100 wide Federal
Navigation Channel
17 Design Criteria Marine Engineering
- Vessel Combinations
- Two 80 to 100-foot ferries, side or end-loaded
- One 80 to 100-foot ferry and one 150-foot private
charter boat - Water Depth 10 feet 2 feet (over-dredge)
below MLW - Distance from proposed bulkhead to edge of
Federal Navigation Channel 50 feet (requires
excavation to widen channel) - Vertical live load uniform pedestrian loading
of 150 psf - Wind wind pressure of 20 psf on vessels
- Seismic Zone 2A in accordance with Uniform
Building Code (UBC) - Service life 50 years
- Ice load 8-inch thick with an effective ice
strength of 100 psi - Gangways Two x 4 feet wide with maximum 112
slope (ADA slope requirement)
18 Terminal Building Objectives
- Iconic building with nautical elements
- Functional user flow patterns
- Direct links to parking
- Open plan on single space (two levels)
- Visual Pedestrian link to waters edge
- Café as recreational activator
- Programmable catering/ special event areas
- Security
- Waiting area with Overlook
- Ticketing areas on both levels
- Vertical Beacon element
- Locate building within Masterplan context
19 Building Program
- SIZE (GROSS SQUARE FEET)
- Waiting Room for 100 Passengers 2,500
- Seating Area 600
- Ticketing / Information Counter 120
- Manager Office 120
- Café / Seating Area 300
- Toilet Rooms (men and women) 250
- Maintenance and Utility Closet 150
- Harbor Master Office 400
- Outdoor Observation Area 600
- Building Mechanical 650
- Transition Space 800
- Vending / ATM 300
- Storage 300
- Security 250
- Elevator 100
- Elevator Machine Room 250
- Egress Stairs 300
- TOTAL GROSS SQUARE FEET 7,900
20 Alternatives Explored
- Scheme 3A, Design on Platform to be built by
Private Developer - Scheme 3B Alternate, Design on Platform to be
built by Private Developer with Alternate
Perpendicular Docking - Scheme 3C, Design Independent of Private
Developer - Scheme 3C Selected as Preferred Alternative due
to ease of implementation
21 Scheme 3A Site Plan
22 Scheme 3A - Axonometric View
23 Scheme 3A - Perspective
24 Scheme 3A Alternate Site Plan
25 Scheme 3A Alternate - Axonometric
26 Scheme 3A Alternate Perspective
27 3C Preferred Alternative
28 Scheme 3B Section Elevation
29 Scheme 3B Section Elevation
30 Scheme B Perspective Rendering
31 Scheme B Perspective Rendering
32 Scheme B Perspective Rendering
33 Scheme B Perspective Rendering
34 Scheme B Perspective Rendering
35 Scheme 3B Site Impacts
36 Scheme 3B Staging
- Phasing Contingent on Funding Availability
- Phase 2
- Additional
- Temp Parking
- Fueling Facility
- Esplanade and waterside improv.
- Approx Cost
- 3-4 Million
- Phase 1
- Temp surface
parking - Temp Sprung Structure
- Boat Basin
- Approx. Cost
- 3-4 Million
- Phase 4
- Ferry Buiding
- Final Site Work
- Approx. Cost
- 3-4 Million
- Phase 3
- Temp surface
parking - New Parking Deck
- Site Work
- Approx. Cost
- 3-4 Million
Estimated Budget 13-16 Million
37 Next Steps
- Draft Design Report/Environmental Assessment
- June 2007
- Advisory Agency Review
- July 2007
- Public Hearing
- July-August 2007
- Outreach to Operators
- September October 2007
- Final DR/EA
- Final Design
- Construction