Title: Presentation III: Milestones


1
Presentation III Milestones
Harold Barton, Andrew Kovalcik, Hiren
Patel, James Whiley, and Fred Spiker
2
Abstract
  • The multi-billion dollar theme park industry is
    not raising customer satisfaction to a maximum.
    Some of the problem are
  • Long lines for a ride
  • Missing shows they really wanted to see
  • Difficulty in locating group members
  • Lack of desired information.

3
TekPark Objectives
  • Improve the theme park experience by
  • Higher ride utilization
  • Shorter waits
  • Less lost group members
  • Reserving ride/shows

4
Hardware Milestones
  • Hardware
  • Tracking System Interface (TSI)
  • Remote System Interface (RSI)
  • Networks (NET)
  • Hardware Integration Testing (HIT)
  • Done in parallel except for integration testing

5
Milestones for Software
  • Software
  • Human Machine Interface (HMI)
  • Location Calculation Module (LMC)
  • Map Module (MM)
  • Service Module (SM)
  • Data Base Module (DBM)
  • Software Integration Testing (SIT)

6
Large Scale Testing Milestones
  • Testing
  • In-House System Testing (IH)
  • Field Testing (FT)

7
Other Milestones
  • Quality (QUAL)
  • Communication (COMM)
  • Marketing (MRKT)
  • Finance (FIN)

8
Completion
  • Project Completion is about 2 years

9
Budget
  • Total Development Cost 173,900

10
Budget Details
  • Tracking System Interface
  • Hardware 5,800
  • Software 200
  • Staff 21,940
  • Remote System Interface
  • Hardware 11,000
  • Software 500
  • Staff 32,280

11
Budget Details
  • Network and Communication
  • Hardware 31,360
  • Software 400
  • Staff 21,920
  • Database Functionality
  • Hardware 12,000
  • Software 1,050/300
  • Staff 35,450

12
Resource Listing Details
  • Tracking System Interface
  • Developer PCs
  • Location Tracking Server
  • 3 WhereNet Location Antennas
  • 1 WhereNet Location Processor
  • Remote System Interface
  • Developer PCs
  • Custom Built Sensor Hardware

13
Resource Listing Details
  • Networking and Communication
  • Developer PCs
  • 50 Wireless Access Points To Ethernet Network
  • 20 Palm Devices (For Testing Purposes)
  • Wireless and Fast Ethernet Network Card
  • 4 16-Port Ethernet Switches and 1 8-Port Fast
    Ethernet Switch
  • Database Resources
  • Developer PCs
  • Database Server
  • Server Software (Oracle or PostgreSQL)

14
Staff Listing Details
  • Tracking System Interface
  • 4 Software Engineers
  • 2 Programmers
  • 1 Technician
  • 2 System Engineers
  • Remote System Interface
  • 2 Software Engineers
  • 1 Programmer
  • 1 System Engineer

15
Staff Listing Details
  • Networking and Communication
  • 3 System Engineers
  • 1 System Analyst
  • Database Functionality
  • 1 Database Architect/Administrator
  • 4 Database Application Engineers

16
High Level TekPark Organization
Harold Barton Project Manager
Database Development
Fred Spiker Web Master
System Engineer Specifications
Interfaces
Networks Communications James Whiley
Graphic Artist Maps and Icons
Marketing
17
CS 250/300U Contract List
  • CS 250
  • a. Wait Time Calculation Module
  • b. Attraction Scheduling/Reservation Module
  • CS 300U
  • a. Ease Of Use Requirements For The Human Machine
    Interface (HMI)

18
Other Contracts
  • None

19
Quality Assurance
  • Have a part of TekPark that will assure Quality
    Control
  • Validate/Verify Steps
  • Standard Procedures

20
TekPark Limitations
  • TekPark cant
  • Decrease the size of the park
  • Eliminate waits
  • Make people want to go to parks

21
Major Risks
  • Cost
  • Over Budget
  • Loss/Mutilation of PDAs
  • A Competitor could arise

22
Conclusion
  • TekPark
  • Reasonable time
  • Reasonable cost
  • Reasonable resources

23