Benchmarking in Regulation Current practise and. future developments. Thor Erik Grammeltvedt ... The main elements of the Norwegian Revenue Cap Regulation. ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 8
Provided by: THG9
Category:

less

Transcript and Presenter's Notes

Title: Benchmarking in Regulation Current practise and future developments


1
Benchmarking in Regulation Current practise and
future developments
  • Thor Erik Grammeltvedt
  • Senior Adviser
  • Section for economic regulation
  • Norwegian Water Recourses and Energy Directorate

2
Content
  • The main elements of the Norwegian Revenue Cap
    Regulation.
  • Difference and similarities compeered to other
    regulatory regimes.
  • Future devolvement of the regulatory models and
    the benchmarking tools.

3
The development of the Norwegian regulation
  • Before 1990 cost of service regulation.
  • 1990 to 1996 ex post rate of return regulation.
  • Since 1997 ex ante revenue cap (RC)
  • 1997 RC based on cost from 1994 and 1995 with a
    general X of 2 pct.
  • 1998-2001 RC with X between 1,5 -4,5 pct.
  • 2002-06 RC based on cost from 1996-99 with X
    between 1,5 and 6,7 pct.
  • 2007 RC - yardstick based on cost with a 2 year
    lag 40 pct. cost recovery and 60 pct. norm.

4
The development of the X
  • 1997 Based on studies of historical
    productivity using Data Envelopment Analysis
    (DEA).
  • 1998-2001 DEA-model
  • Input Labour, services, capital (both historical
    and replacement value) and losses.
  • Output Energy delivered, number of customers and
    km of HV, LV and Sea cables.
  • 2002-2006 DEA-model
  • Input Labour, services, capital (both historical
    and replacement value), losses and an
    environmental variable (Estimated amount of
    energy not delivered).
  • Output Energy delivered, number of customers and
    km of HV, LV
  • 2007 DEA-model
  • Input Total cost.
  • Output Energy, Holiday homes, Reaming Customers,
    Km HV, stations, degree of transformation and 3
    environmental variables.

5
The information game - Basic tradeoffs in
regulatory design
  • Three main problems in contract design
  • Motivation
  • Coordination
  • Transaction cost
  • Incentives by decupling costs and revenue
  • Time lag
  • Benchmarks or Norms

6
Similarities and differences
Degree of norm/benchmark
DEA models
Engineering models
Ex ante
Ex post
Degree of cost recovery
7
Future development an research tasks
  • More yardstick - reducing the time lag in the ex
    ante models
  • Reduce investment uncertainty.
  • Introduce more norm.
  • Main challenge in the current DEA models is the
    application of endogenous output variables.
  • Calling for the development engineering models
    either
  • to create exogenous output variables or
  • to be applied directly inn the regulation