Group Presentation AB ngpannefreningen - PowerPoint PPT Presentation

1 / 30
About This Presentation
Title:

Group Presentation AB ngpannefreningen

Description:

ngpannef reningen's Foundation for Research and Development was ... 'We enquired with three companies, of which F was one, regarding the system's display. ... – PowerPoint PPT presentation

Number of Views:27
Avg rating:3.0/5.0
Slides: 31
Provided by: jakobiv
Category:

less

Transcript and Presenter's Notes

Title: Group Presentation AB ngpannefreningen


1
Group Presentation AB Ångpanneföreningen
2
ÅF in the world
Own offices Assignments after 2000
3
  • We make our clients moreenvironmentally adapted

4
  • We make our clients safer

5
  • We make our clientsmore profitable

6
New conditions
7
place greater demands on your supplier
  • We offer cooperation with our sights set on the
    future, supported by
  • Competence in breadth
  • Competence in depth
  • Innovative solutions
  • Experience
  • Good references

8
Strong owners
  • Ångpanneföreningens Foundation for Research and
    Development was formed in 1985 and owns 25 of
    the capital and 48 of the votes in ÅF.
    The Foundation strives to promote technical
    development, safety, quality, good external and
    internal environment, and the economical use of
    energy in industrial installations and other
    plants. The Foundations major asset consists
    of shares in AB Ångpanneföreningen. The Board
    includes Board Members appointed by such
    institutions as the Royal Swedish Academy of
    Engineering Sciences (IVA), the Swedish Forest
    Industries Federation and Swedenergy.

9
Organisation January 2005
10
ÅF Divisions and regions
11
ÅF
2 billion SEK
Sales
Industry, energy andinstallations
Focus
2,750 consultants in ten countries
Breadth
12
World class competence
Infrastructure
Process
Systems
Inspection Testing
13
ReferenceProcess
  • AstraZeneca ABAssignment Licensing issues for
    installations in Södertälje and Mölndal
  • AstraZeneca has cooperated with ÅF on several
    occasions on work conforming to the Environmental
    Code.
  • This cooperation has always been characterised by
    professionalism and integrity, which has
    contributed to our solving environmental
    questions in a very successful way.Peter
    Hellsberg, Environmental Manager  

14
ReferenceProcess
  • KarlshamnsAssignment Wide range of
    environmental issues for 20 years
  • ÅF proposes elegant solutions to small problems
    and has the capacity to manage large projects in
    the same way. Their excellent quality system
    means that I can always be certain that what I
    get is of the finest quality. Jim Broberg,
    Environmental Manager

15
ReferenceProcess
  • Bellows ABAssignment Advanced automation
    solution
  • ÅF surprised us by presenting a creative
    solution, despite the limitations imposed on
    them. In addition, we knew the personnel in the
    project group - although this was a less
    important reason as to why we chose ÅF. ÅF
    chose a completely different route to the
    solution, and the project had good overall
    economy.
  • Wolfgang Dieckhoff, CEO

16
ReferenceInfrastructure
  • Uppsala Railway Depot
  • Constructing a railway depot without
    inconveniencing traffic or passengers during the
    entire construction period is just about the most
    difficult thing one can do within railway
    construction. We had to move the traffic in
    stages within the constricted station area, and
    work with provisional platforms. The most
    important thing for us is that the consultants
    deliver on time throughout the various stages of
    the project, and prepare complete documentation
    in accordance with our requirements. Our
    buyers have made the assessment that ÅF has the
    ability to do this.
  • Berndt Rundgren

17
ReferenceInfrastructure
  • White ArkitekterAssignment Function solution
    for optimal energy balance in unique building
  • Everybody who participates in the construction
    process should cooperate more closely right from
    the planning stage. ÅF has managed to unite
    competence and the strength of innovation with a
    method of working which concentrates on
    relationships. Focusing on creating the best
    full-service solution.
  • Bengt Svensson

18
ReferenceInspection Testing
  • Kvaerner Power ABAssignment All monitoring in
    accordance with European pressure vessel
    regulations
  • We implemented the new European Pressure Vessel
    Directive for the first time in Spain. The
    project has been very successful. Both
    cooperation and communication concerning our
    joint measures have functioned extremely well.
    We can certainly envisage future business with
    ÅF.
  • Jan Bryfors

19
ReferenceProcess
  • Stora Enso, Hylte
  • We regularly have ongoing projects. The latest
    one is that ÅF has project-planned and installed
    a mill for MC milling. We are pleased with the
    result, and cooperation has worked well.Arne
    Sundqvist

20
ReferenceSystems
  • AndrewAssignment Developing base station for 3G
    in an indoor environment
  • ÅF was the only consultancy company in the
    sector which came up with a full-service
    solution. ÅF has experience of managing, running
    and resourcing projects. Right from the
    beginning ÅF had an understanding of the
    commercial criteria and technical area, both as
    regards the mechanics and the electronics.
    Competence is not everything, ÅF has also been
    able to assemble a group of people who function
    splendidly. Our verdict is Very good as
    regards both relations and competence!
  • Örjan Fall, CEO, AT Sweden AB

21
ReferenceSystems
R4-AIS Shipborne Transponder System
  • Saab TransponderTechAssignment Anti-collision
    system for ships
  • We enquired with three companies, of which ÅF
    was one, regarding the systems display. The ÅF
    tender was clearly superior. ÅF is like a very
    large consultancy store. They have all the
    resources and competence that we required
    software and hardware, mechanics and
    electronics. They produced their prototype
    incredibly quickly. The delivery period was 32
    weeks, but ÅF made their delivery in 16
    weeks.Peter Bergljung, Development Manager

22
ReferenceSystems
  • Tyréns ABAssignment Customised software for
    consultancy companyAlmost all our consultants
    are responsible for their own projects.
    PX-Control has given the assignment managers full
    economic information, faster handling and better
    ongoing control and profitability.Orvar
    Lindbäck, Controller

23
ÅF contributes tothe development of the
business community and society
24
Our first hundred years
  • 18951902 Ångpanneföreningen is founded
  • 1902 Our first environmental consultant
  • 1976 Inspection operations are taken over by
    the government
  • 1981 From association to joint-stock
    company
  • 1986 ÅF is listed on the Stockholm Stock
    Exchange
  • 2002 ÅF Swedens largest technical
    consultancy
  • 2003 New organisation, step 1
  • 2005 New organisation, step 2

25
A strong brandamong technical consultants
  • Market imageThe survey is based on replies from
    610 randomly selected decision-makers in
    companies with over 50 employees.

26
A strong brandamong IT-consultants
Market imageThe survey is based on replies from
610 randomly selected decision-makers in
companies with over 50 employees.
27
An unbeatableworking environment
  • ÅF ranked 13th among Swedish companies all
    categories,in VAs survey of Swedens best
    workplaces
  • A developing environment for both women and men

28
The workplacetop twenty
  • Engineers dream workplace,in percent

29
Swedens largest experience bank
ISO 14001
ISO 9000
VOLVO, SIEMENS, SKANSKA, KAROLINSKA HOSPITAL,
ABB, ERICSSON, STORA ENSO and others
30
2,750 consultants with fresh ideas and
experiencein ten countriesÅF is ready for
another century
Write a Comment
User Comments (0)
About PowerShow.com