Title: Software Project Management SPM


1
Software Project Management (SPM)
  • Lecture 5
  • Project Scope Management
  • Dr. Daniel Keret

2
Reading Assignment
  • A Guide to the Project Management Body of
    Knowledge, PMI Publications, 3rd Edition, 2004
  • Chapter 5

3
Scope Management
  • Project Scope definition
  • Product Scope The Features and Functions that
    Characterize the Product
  • Project Scope The WORK that Needs to be
    Accomplished to Deliver the Product
  • Work Breakdown Structure (WBS)
  • Scope Control
  • Scope Verification

4
Scope Definition
  • Preparation of a Detailed Project Scope
    Definition Based On
  • Major Deliverables
  • Assumptions
  • Constrains
  • Stakeholders Needs, Wants and Expectations are
    Converted into Requirements
  • Approved Change Requests CAN Change the Scope
    Definition.
  • Tools and Techniques
  • Product Analysis Translating Objectives and
    Requirements into Tangible Deliverables
  • Alternatives Identifications- Different
    Alternatives to Execute the Work
  • Expert Judgment
  • Stakeholders Analysis- Select, Prioritize and
    Quantified the Needs, Wants and Expectations.

5
Scope Definition - Content
  • Project Scope Statement
  • Detailed Project Deliverables Work Needs to
    Accomplish the Deliverables and What Work is
    Excluded
  • Enables the Project Team to Perform More Detailed
    Planning, Guide the Project Team How to Execute
    the Work and Provide the Baseline for the Project
    Evaluation
  • Requested Changes
  • Project Scope Management Plan (Updates)
  • Changes Due to Approved Change Requests

6
Scope Definition Appendixes
  • Project Objectives Measurable Success Criteria.
    (Business, Cost, Schedule, Quality, Technical
    Etc.)
  • Product Scope Description Characteristic of the
    Product/Service, Specifications
  • Project Requirements Conditions to Satisfy
    Contract, Standards, Specifications, Legal Etc.
  • Project Boundaries What includes within the
    boundaries of the project, What is excluded.
  • Project Deliverables Outputs that Compromise
    the Product/Service of the Project. Other Project
    Outputs such as Management Reports,
    Documentation.
  • Project Constraints Predefined Budget, Imposed
    Dates/Milestones,Performance Criteria,
    Contractual Constrains Etc.

7
Scope Definition Appendixes (cont)
  • Project Assumptions The Assumptions and the
    Consequences if they Appears to be False.
  • Initial Project Organization
  • Initial Defined Risks
  • Scheduled Milestones
  • Fund Limitation
  • Cost Estimate
  • Project Configuration Control Requirements
    Configuration Management and Change Control to be
    Implemented
  • Project Specifications Identify the Specs
    Document that the Project Should Comply
  • Approval Requirement Applies to Objectives,
    Deliverables, Documents, Work

8
Work Breakdown Structure (WBS)
  • Deliverable Hierarchical Decomposition of the
    Work to be Executed By the Project Team
  • The Lower Level WBS components (Tasks) Can Be
    Scheduled, Cost Estimated, Monitored and
    Controlled.
  • Few Approaches Are Possible. Examples
  • Software Process Steps Products Components
  • Software Products Components Process Steps
  • Products Software Components, User Manuals,
    Integration, Acceptance Testing, Conversion.
  • Component Detail Design, Code, Unit Test.
  • Process Steps Programming Dossiers, Coding,
    Programmer Tests, Unit Tests

9
WBS ExampleSoftware Process Steps Products
- Components
10
WBS Objectives Content
  • Objectives
  • Cost Estimating All Activities will be
    Estimated. Roll Up Costs of individual WBS to
    Overall Cost.
  • Cost Accounting Determine Cost of Each Element.
    Assign Each Cost to the Appropriate Cost Center.
  • Schedule Planning
  • Resource Planning
  • Content
  • Identify the work expected
  • Staffing Requirements
  • Name of Responsible Individuals
  • Schedule ( Duration)
  • Budget Assigned
  • Acceptance Criteria
  • Etc.

11
Scope Control
  • Influencing the Factors that Create Scope Changes
  • Controlling the Impact of the Scope Changes
  • Manage the Actual Changes Its Integrations with
    All the Project Processes
  • Change Control System is Used to Track the Scope
    Change
  • Documentation
  • Tracking
  • Approval
  • Monitor Contractual Obligations Due to the Scope
    Change
  • Scope Change Requires
  • Variance Analysis (assess the magnitude of the
    change)
  • Preplanning (Modifications to WBS, Scope
    Statement, Management Plan)
  • Configuration Management System (Reports
    Implementation Status and Deliverables)

12
Scope Verification
  • Stakeholders Formal Acceptance of the Project
    Scope and Deliverables
  • Product Review (Audit, Walkthrough) Measuring,
    Examining and Verifying Compliance with
    Requirements and Product acceptance Criteria
  • Outcome of the Scope Verification Can Be
    Requested Changes and Recommended Corrective
    Actions

13
Main Steps to Build a Win-Win Set of
Requirements
  • Identify Success-Critical Stakeholders,
  • Identify Stakeholders Win Conditions.
  • Identify Win Condition Conflict Issues,
  • Negotiate Top-Level Win-Win Agreement,
  • Invent Options for Mutual Gains,
  • Explore Option Trade-Offs,
  • Manage Expectations,
  • Incorporate Win-Win Agreements into
    Specifications and Plans,
  • Confront and Resolve New Win-Loss, Loss-Loss Risk
    Items.