CeNCOOS Goals and Initial DMAC Recommendations - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

CeNCOOS Goals and Initial DMAC Recommendations

Description:

National backbone: satellites, reference and sentinel stations on core variables ... PISCO (diver surveys; nearshore biological/physical measurements) ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 12
Provided by: donb
Category:

less

Transcript and Presenter's Notes

Title: CeNCOOS Goals and Initial DMAC Recommendations


1
CeNCOOS Goals and Initial DMAC Recommendations
  • Stephanie Watson

2
U.S. Integrated Ocean Observing System (IOOS)
  • Two components
  • global/basin scale (feeds the Global OOS)
  • coastal
  • Coastal component includes
  • National backbone satellites, reference and
    sentinel stations on core variables (many are
    physical), long-range HF radar (proposed),
    standards for data management and communications
  • Regional Associations focused on land-based
    inputs, state and regional priorities, greater
    spatial and temporal resolution, more variables
    (especially more focus on biological and
    chemical)

3
Regional Associations in the IOOS
4
CeNCOOS Mission Statement
  • to coordinate and support the development and
    implementation of a regional ocean observing
    system, as part of the U.S. Integrated Ocean
    Observing System, which provides data and data
    products to a diversity of end users on spatial
    and temporal scales appropriate for their needs.

5
Some observing activities in CeNCOOS Region
MBARI MUSE 2000
  • CICORE (hyperspectral imagery, multibeam
    bathymetry, shore-based stations)
  • CIMT (HF radar, ship-based measurements, mooring,
    marine mammal tracking, satellite imagery)
  • PISCO (diver surveys nearshore
    biological/physical measurements)
  • CalCOFI/PACOOS (ship-based biological/physical
    measurements and many other platforms)
  • MBARI (moorings, AUVs, gliders, satellite
    imagery)
  • NEOCO (shore-based stations variety of
    parameters)
  • COCMP-NC (HF radar, models, use of CDIP and
    satellite imagery)
  • Bodega Coastal Ocean Observatory (HF radar,
    moorings, in situ data variety of parameters)

6
IOOS provides an end-to-end system
  • 3 Subsystems
  • Observational
  • Data Management and Communications
  • Analysis, Modeling and Applications

MBARI MUSE 2000
DMAC plan
7
DMAC Subsystem Principles
  • Interoperability
  • Open, easy access and discovery
  • Reliable, sustained, efficient operations
  • User feedback
  • Open design and standards process
  • Preservation of data and data products
  • total near-term annual data flow for the U.S.
    Integrated Ocean Observing System estimated at
    2,977,100 MB (DMAC plan, p. 28)

8
DMAC Plan
  • A single data management approach is not
    specified
  • Concentration on other elements
  • Data descriptions (metadata)
  • Data discovery (also metadata)
  • Transport (e.g., OPeNDAP, http, ftp)
  • On-line browse
  • Archive
  • Distributed IOOS centers with dedicated servers
    for data, data assembly, modeling, archive,
    product generation
  • User access to data and metadata via a portal

9
Initial DMAC Recommendations
  • Metadata and Data Discovery
  • FGDC compliant metadata
  • Submit metadata to GCMD and NCDDC
  • Data Transport
  • OPeNDAP
  • And/or participating in enterprise GIS systems
  • On-line Browse
  • Live Access Server
  • Archive
  • Long term plans for designated archive centers
  • In Concrete Guidance to Data Providers
    http//dmac.ocean.us/dacsc/docs/december/dmac_plan
    _part_I_aug29_ConcreteGuidance.doc

10
Recommendations for DMAC from 1st Annual IOOS
Development Workshop
  • FY 05 and 06
  • 1. DMAC Steering Team
  • 2. DMAC Expert Teams
  • 3. Interagency Coordination (IOOS DMAC
    Implementation Oversight Working Group)
  • Costs
  • FY 05 Oversight and Coordination (1. And 3.)
    36K Standards Development (2.) 685K
  • FY 06 Oversight and Coordination 72K
    Standards Development 946K

11
Recommendations for DMAC from 1st Annual IOOS
Development Workshop (2)
  • FY 07
  • Interoperability framework
  • Continuation of DMAC efforts that begin in 05 and
    06
  • Interoperability infrastructure
  • Investments to help meet federal and RA DMAC
    needs
  • Design and demonstration Pilot projects to
  • Evaluate, test and involve end users in
    capability demos
  • Implement new technologies
  • Conduct end to end integration of observations
    across sectors, disciplines, geographic areas,
    organizations
  • Costs
  • Framework 7,052K Infrastructure 6,860K
  • Design and Demonstration 3,800K
Write a Comment
User Comments (0)
About PowerShow.com