assalamualaikum..
2
DAA3511gt GEOTECHNICS lt
3
MATERIAL REQUIREMENTS
By IR. MOHD AYUB BIN ABDUL GHANI 850616-11-5297
AB03014
4
MATERIAL REQUIREMENTS
  • Backfill Material
  • Facing Element
  • Concrete Anchor Blocks
  • Reinforcing Elements
  • Fabrication And Galvanisation
  • Connections
  • Joint Materials
  • Cushion Pad

5
FACING ELEMENT
  • PRECAST CONCRETE FACING PANEL
  • ALTERNATIVE FACING ELEMENT

6
PRECAST CONCRETE FACING PANEL
  • FACING FINISH AND TOLERANCE
  • ANCHORAGE LUGS
  • LIFTING HOOKS
  • REINFORCEMENT BARS
  • MARKING
  • HANDLING, STORAGE AND TRANSPORTATION

7
Facing Finish And Tolerance
  • The finish of the exposed face of the panel shall
    be as shown in the drawings and shall be free of
    honeycombs, stains, irregularities or deep
    cracks.
  • Tolerance in dimensions are as follow
  • The height of full panels shall be within /-5 mm
    while the height of half panels shall be within
    /-3 mm.
  • The width of all panels shall be within /-5 mm.
  • The difference between the lengths of the
    diagonals shall not exceed 10 mm.
  • Twist or warp shall not exceed 5 mm.

8
Anchorage Lugs
  • Shall be pre-bent, holed and cast into the facing
    panels in accordance to the dimensions shown in
    the drawings.
  • They shall be hot dipped galvanised to a minimum
    thickness of 85 µm in accordance to BS 729.
  • Care must be taken to ensure that the lugs do not
    come into contact with any surface of the
    internal reinforcements of the panels or blocks.

9
Injection of mortar into the tendon mounted
anchorages.
  • Preparing the anchorage (bond-type).

10
Lifting Hooks
  • The lifting hooks shall be pre-bent and cast into
    the facing panels in positions in accordance to
    the dimensions showns on the drawings.

11
Reinforcement Bars
  • To required the reinforcement bars shall be
    placed in accordance with the drawings.
  • They shall be high yield deformed bars in
    conformity with MS 1461973, BS 44491969 and
    1978.

12
Marking
  • The date of manufacture and type of each panel
    shall be clearly scribed on the unexposed surface
    of the panel.

13
Handling, Storage And Transportation
  • Such a manner as to eliminate the possibilities
    of chipping, discoloration, cracks, fractures,
    stains and excessive bending stress.
  • The concrete strength of the panels shall reach a
    minimum compressive strength of 23 MPa before
    they are allowec to be transported.

14
Alternative Facing Element
  • Shall be subjected to the approval of S.O
    provided the structural strength of the
    alternative facing element is equivalent to the
    precast concrete facing panels.

15
Concrete Anchor Blocks
  • The system requires shall be cast with the same
    concrete strength and quality.
  • The dimensions of the blocks shal not be less
    than those shown in the drawings.

16
View of anchorage block showing position of 6
AFRP tendons.
  • End view of anchor blocks with external cables
    and anchorages.

17
Reinforcing Elements
  • Galvanised carbon steel bars
  • The reinforcing bars shall generally be in
    accordance with composition and property
    requirements of MS 146 or BS 44491988.
  • Galvanised carbon steel strips
  • The carbon steel strips shall comply with BS
    1449Part 1 (1972) either quality KHR 34/20P or
    KHR 54/35P.

18
Fabrication And Galvanisation
  • Shall be cut to length and threaded or holed in
    specified locations.we be inspected to ensure
    that they are free from defects that may impair
    their strength and durability.

19
Connections
  • Bolting and welding, in order to connect members
    together.
  • The connections could be rigid, semi-rigid or
    nominal pinned.

20
Type Of Nuts
21
Type of Washers
22
Type Of Screws

SCREWS
23
Type Of Bolts
24
Joint Materials
  • The fillers for the vertical and horizontal
    joints where pads are used shall be flexible open
    cell polyurethane foam strips of 40 mm square
    cross section or approved equivalent materials.

25
Cushion Pad
  • The cushion pads placed at the horizontal joint
    shall be made of rubber with shore hardness 85 or
    approved equivalent materials.