Roger Raman - PowerPoint PPT Presentation

About This Presentation
Title:

Roger Raman

Description:

Progress with Experiments in Base Run Plan. 3 ... Considering devoting one day to do multiple XPs that require about 2-3 hours each. ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 7
Provided by: roger54
Category:
Tags: devoting | raman | roger

less

Transcript and Presenter's Notes

Title: Roger Raman


1
  • Roger Raman
  • for the NSTX Research Team
  • University of Washington, Seattle
  • NSTX Run Usage update and
  • Plans for the remainder of the Run

College WM Colorado Sch Mines Columbia
U Comp-X General Atomics INEL Johns Hopkins
U LANL LLNL Lodestar MIT Nova Photonics New York
U Old Dominion U ORNL PPPL PSI Princeton
U SNL Think Tank, Inc. UC Davis UC
Irvine UCLA UCSD U Colorado U Maryland U
Rochester U Washington U Wisconsin
Culham Sci Ctr U St. Andrews York U Chubu U Fukui
U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu
Tokai U NIFS Niigata U U Tokyo JAERI Hebrew
U Ioffe Inst RRC Kurchatov Inst TRINITI KBSI KAIST
ENEA, Frascati CEA, Cadarache IPP, Jülich IPP,
Garching ASCR, Czech Rep
NSTX Team Meeting PPPL, Princeton, NJ, 31 May,
2006
2
Progress with Experiments in Base Run Plan
3
Priorities for XPs for the remainder of the NSTX
Run
Transport and Turbulence
613 Delgado (Thesis) 1 Z-scaling of imp. transport
532 Kaye 1/2 BT and Beta scaling of confinement
Smith (Thesis) Hyeon 1 1 High-k measurements in Rev Shear High-k measurements in H-mode
612 Levinton 0.5 Reversed shear discharges
610 Stutman 0.5 Perturbed electron transport
Wave Particles
608 Fredrickson 1 TAE/EPM impact of fast ions
607 Heidbrink 2 hours Fishbone impact on fast ions
625 Diem (Thesis) 0.5/1 EBW emission and coupling
617 Hosea 0.5 HHFW power balance
Bernabei Missing RF power
4
Priorities for XPs for the remainder of the NSTX
Run
MHD
615 Sabbagh 1 RWM
614 Menard 1/2 EFC
619 Sontag 1 RWM stabilization models
623 Gates 1 High-beta end of run
Menard 0 Low density locked mode (defer to 07)
ISD
526 Kaye 0.5 ELM and Confinement scaling with elongation
602 Menard 0.5 Long pulse SN
603 Gates 0.5/1 Long pulse DN After Li tests ?
627 Kessel HHFW/NBI current drive ?
628 Leuer NSTX/DIII-D control system collaboration
5
Priorities for XPs for the remainder of the NSTX
Run
Boundary
601 Kugel 1.5/2.5 Li Evaporator
621 Hubbard 6 hours CMOD/MAST/NSTX collaboration on ELMs
529 Maingi 2 hours Pedestal dependence on Aspect Ratio
XMP46 Bush 2 hours Divertor Langmuir probe commissioning
622 Maqueda/Boedo Edge Turbulence and Transport
624 Tritz Type 1 ELM heat pulse propagation
Evans ELM suppression with resonant magnetic pert
609 Maingi ELM type on magnetic balance
Williams Role of turbulence in density limits (0.5 days)
605 Soukhanovskii Detachment in high triangularity (piggy back?)
Sol-free plasma startup
606 Raman 1/2 Transient CHI
533 Mueller Need to do PCS development
6
12 days remain in FY06 NSTX Run
  • 3.5 days of unallocated time remain
  • Very Good progress with MHD and Solenoid-free
    startup milestones.
  • Good progress with almost all experiments
  • Desirable to make additional progress with High-K
    and Li milestones
  • Considering devoting one day to do multiple XPs
    that require about 2-3 hours each.
  • Do we need to spend additional time in MHD?
Write a Comment
User Comments (0)
About PowerShow.com