Sampled Luminosity for FY06 Longitudinal Polarization Data Set PowerPoint PPT Presentation

presentation player overlay
About This Presentation
Transcript and Presenter's Notes

Title: Sampled Luminosity for FY06 Longitudinal Polarization Data Set


1
Sampled Luminosity for FY06 Longitudinal
Polarization Data Set
As of 9 am on Tuesday 5/9/06.
Transverse Polarization
Sampled Luminosity Longitudinal
Polarization 2.1 pb-1 Goal 10
pb-1 Transverse Polarization 3.31 pb-1 Goal
3 pb-1 (Di-Jets)
2
Sampled Luminosity for Forward Physics Program
(aka FPD)
Transverse FPD Goal is to sample 10 pb-1 _at_ 50
Polarization. FOM P2L 2.5 pb-1
Sampled FPD Luminosity (6 am 5/8) 5.88
pb-1 Sampled FOM (Goal 2.5 pb-1) 2.06
pb-1 Missing a few hundred nb-1 from Saturday
3
STAR Comments regarding Schedule for Remainder of
Run
  • In general, it is always a good idea to put
    Physics running ahead of commissioning in any
    plan.
  • Humidity control is not good in the STAR IR
  • As one gets later into the Summer, the
    probability of encountering condensation
    problems, and hence not being able to run the
    Detector systems, increases.
  • The magnet can run at higher Dew point
    temperatures than the Detector (70 F as opposed
    to 63 F).
  • Given the above, from the Experiment standpoint,
    it makes more sense to run the 62 GeV period
    prior to the 500 GeV commissioning.
Write a Comment
User Comments (0)
About PowerShow.com