Who we are
  • Dorset
  • Energy Advice
  • Centre

Presentation by Peter Bywater 01202 469907
Peter_at_deac.co.uk
2
Where we are
3
What we do in brief
Impartial Advice
Telephone Help Line
Business advice
Energy Strategies
Grants
Renewables Advice
Training Presentations
Project Management
Energy Days
4
The Bournemouth and Poole Private Rented
Insulation Project
Presentation by Peter Bywater 01202 469907
5
The Bournemouth and Poole Project Feasibility
Study partners
Presentation by Peter Bywater 01202 469907
6
Why Boscombe initially?
  • Tenure
  • High number of private tenants
  • High level of asset rich / cash poor owner
    occupiers
  • Type of Accommodation
  • Rate of occupants in HMO is double that for the
  • rest of Bournemouth
  • Household Characteristics
  • High level of households with vulnerable
    occupants
  • Overcrowded households three times the national
    average
  • Occupation / Economic Status
  • Local economy provides a high degree of low paid
    work
  • NM area has a high level of residents
  • claiming unemployment benefit

Presentation by Peter Bywater 01202 469907
7
Project Overview
This is what the project initially set out to
achieve
  • What was the full impact of fuel poverty within
    the NM area?
  • What was the degree of fuel poverty within the
    NM area?
  • How was this problem being dealt with locally?
  • Were there any solutions available?
  • Which solutions should be pursued?
  • Project planning for future phases

Feasibility Study
Analysis
Planning
Presentation by Peter Bywater 01202 469907
8
Feasibility Study Analysis
  • No fuel debt but fuel poverty found
  • Tenants were unable to access grants
  • Inadequate insulation and heating
  • High number of benefit recipients
  • High migration rate of population
  • These findings were as a result of visiting and
    interviewing over 1,000 residents in the project
    area

Presentation by Phil Neale and Peter Bywater
01202 469907
9
The Solution
  • Source funding from all avenues, (L/A and
    Utilities)
  • that could be used regardless of financial
    status and
  • tenure for installation of energy saving
    measures
  • Develop commercial relationships with installers,
  • funders and Landlords
  • Quickest win scenario, most effective ways to
    save energy
  • Had to be CWI and Loft insulation measures

Presentation by Peter Bywater 01202 469907
10
Implementation
  • Funding sourced
  • Installers tendered and engaged
  • Landlords approval and feedback
  • Tenants associations buy in
  • Project manager sourced
  • Processes and procedures in place for effective
    running of project

Presentation by Peter Bywater 01202 469907
11
Initial targets Large portfolio landlords
  • Phase 2
  • Cavity Wall Insulation installed into over 700
    dwellings in
  • Boscombe, loft Insulation installed into over 100
    dwellings
  • 2800 Low energy Light bulbs issued to
    Landlords/Tenants
  • 50 Hot Water Tank Jackets issued
  • 20 Carbon Monoxide detector cards issued
  • Advice given to tenants on accessing other
    grants/services
  • Good relationships built with Landlords, Council
    and Tenants
  • 6.5 metric tonnes of Carbon saved over lifetime
    of
  • measures

Presentation by Peter Bywater 01202 469907
12
Added Value
  • Pointing to external brickwork
  • Guttering repairs
  • Replacement of damaged or spalled bricks
  • Clearance of vegetation
  • Removal of unroadworthy vehicles
  • Painting of external render after wall insulation
  • Clearance of rubbish to side access and alley
    ways
  • Clearance of rubbish in loft spaces
  • Redecoration of internal walls following cure of
    damp problems

Presentation by Peter Bywater 01202 469907
13
Phase 3
  • Installed Cavity Wall Insulation into a further
    2500 dwellings
  • Installed Loft Insulation into at least 620
    dwellings
  • Issue a further 6,000 Low energy light bulbs ( 2
    per dwelling)
  • Issued 2800 energy advice sheet to Tenants
  • Issued 160 Hot water tank jackets where required
  • Gave advice on other grants and services
    available
  • Expanded the project area Across the rest of
    Bournemouth but still focusing promotion within
    Boscombe and Springbourne.
  • 800,000 funding secured from Utilities, Council
    and Installer
  • Completed end of March 2007
  • 800 properties already identified and on list for
    next
  • phase and round of funding

Presentation by Peter Bywater 01202 469907
14
Phases 4, 5, and Poole - to date
  • Installed 1850 CWI
  • Installed 850 Lofts
  • Supplied 100 Hot Water Tank Jackets
  • Supplied 4,000 low energy light bulbs
  • Supplied 2,000 PC powerdown plugs
  • Distributed another 2,000 energy advice sheets
  • To date the project has dealt with over 550
    Private Landlords, 25
  • letting and management agents
  • We have now had interest from other authorities
    around the country

Presentation by Peter Bywater 01202 469907
15
Project Profile
  • The Project was visited by

Ian Pearson MP
Richard Price Director NLA
Mr Benepal Private Landlord
Warmerhomes Installer
16
Project Profile
  • We have had exposure within the following
  • Bournemouth Journal/BH Life
  • Poole Landlords Newsletter
  • NLA website/UK Landlord Magazine
  • HECA News
  • GNN/Green Building/2CR/NM/LA websites
  • Profile expected to increase as project expands

17
Savings made on project to date
  • Annual carbon savings of around 1,700 tonnes
  • Annual CO2 savings of around 6250 tonnes
  • Annual household savings in the region of
    800,000
  • Over the lifetime of the measures the total CO2
    saved will be in the region of 110,000 Tonnes
  • The scheme has attracted total funding in excess
    of 1.58 M
  • Continuation of the scheme in Bournemouth this
    financial year should see a further 1500
    dwellings receive the works

Presentation by Peter Bywater 01202 469907
18
Contacting us
  • Telephone 01202 469907
  • FAX 01202 252606
  • Email peter_at_deac.co.uk
  • Website - www.deac.co.uk

Presentation by Peter Bywater 01202 469907
19
Any Questions
?
?
?
?
?
?
?
?
?
Presentation by Peter Bywater 01202 469907
Write a Comment
User Comments (0)
About PowerShow.com