www'taeco'com - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

www'taeco'com

Description:

www'taeco'com – PowerPoint PPT presentation

Number of Views:118
Avg rating:3.0/5.0
Slides: 32
Provided by: them59
Category:
Tags: com | ebor | taeco | www

less

Transcript and Presenter's Notes

Title: www'taeco'com


1
Taikoo (Xiamen) Aircraft Engineering Company
Welcome to TAECO
  • www.taeco.com

2
Contents
www.taeco.com
3
1. TAECO Brief Introduction
www.taeco.com
Swire Activities Worldwide
4
1. TAECO Brief Introduction
www.taeco.com
John Swire Sons (HK) Limited
John Swire Sons Hong Kong Ltd
Swire Pacific Ltd
Beverage Division
Trading Industries Division
Marine Services Division
Aviation Division
Property Division
Air Hong Kong Ltd
Hong Kong Dragon Airlines Ltd
Taikoo Aircraft Engineering Co Ltd
Cathay Pacific Airways Ltd
Hong Kong Aircraft Engineering Co Ltd
Hong Kong Airport Services Ltd
Cathay Pacific Catering Services Division
Hong Kong Air Cargo Terminals Ltd
5
1. TAECO Brief Introduction
www.taeco.com
Hong Kong Aircraft Engineering Co. Ltd. (HAECO)
  • Located in CLK International Airport of Hong Kong
  • 2 hangars which can accommodate 6 wide body
    aircraft
  • Comprehensive maintenance capability on Airbus
    A320, A330, A340, B747, B757, B767 and B777

6
1. TAECO Brief Introduction
www.taeco.com
HAECO(Cont.)
  • An off-site Avionic Component workshop of HAECO
    / TAECO
  • Located in TKO of Hong Kong
  • Handles over 40,000 components annually
  • Average TRT for Avionic component is 9 days
  • Average TRT for Fuel, Pneumatic, Hydraulic,
    Mechanical and Safety Equipment is 16 days

7
1. TAECO Brief Introduction
www.taeco.com
Hong Kong Aero Engine Services Limited( HAESL )
  • A joint venture between
  • HAECO (45)
  • Rolls-Royce (45)
  • Singapore Airlines Engineering (10)
  • Located in TKO of Hong Kong
  • Provides full overhaul of Engines, and repair of
    Component, Accessories Piece Parts
  • HAESLs capabilities include RB211-524/535 and
    Trent 700/800 engines

8
1. TAECO Brief Introduction
www.taeco.com
Taikoo (Shandong) Aircraft Engineering Co. Ltd.
(STAECO)
  • March 1999 Operation of the 1st hangar
  • March 2003 Operation of the 2nd hangar
  • Staff 561 (up to July 2006)
  • Base and line maintenance on narrow body aircraft
  • B737-300/-400 P to F conversion (with Pemco)
  • Approval
  • - JCAB SAAB340, CRJ-200, B737-400,500
  • - CAAC B737, SAAB340, CRJ-200/700
  • - FAA B737
  • - HKCAD CRJ-200
  • - CAA SAAB340

9
1. TAECO Brief Introduction
www.taeco.com

Location of TAECO
  • Located in Xiamen of China
  • Aviation hub in Southeast China, with
    international flights to Hong Kong, Japan, Macau,
    Singapore, Korea, Malaysia, Philippine and
    Thailand
  • Direct highway links to to Hong Kong
  • One of the first four Special Economic Zones

10
1. TAECO Brief Introduction
www.taeco.com
TAECO Development
1993 duck farm
1996 1st hangar B737/747
1999 2nd hangar B757/B767/A330/A340
2003 3rd hangar MD11/B777
2005 4th hangar 747-400BCF
2007 5th hangar
2009 6th hangar
11
1. TAECO Brief Introduction
www.taeco.com
TAECO layout and future development
12
1. TAECO Brief Introduction
www.taeco.com
TAECOs Maintenance Base in Xiamen
  • Total investment USD 250 million
  • . Hangar Square 76,000 sqm (excluding Hangar
    6)
  • Apron Square 126,000 sqm (excluding Hangar
    6)
  • Total 5 Hangars (10 wide body bays and 4 narrow
    body bays) in operation
  • The 6th Hangar scheduled to start operation in
    early 2009
  • Each bay equipped with full standing docks
  • Additional Mobile Tail Enclosure

13
1. TAECO Brief Introduction
www.taeco.com
TAECO Shareholders
Japan Airlines International 9.09
Cathay Pacific Airways 9.09
Boeing Group 9.09
Hong Kong Aircraft Engineering Co. Ltd. 56.55
Hong Kong Kinkuen Development Co. Ltd. 2.00
Beijing Kailan Aviation Technology Development
and Service Co. Ltd. (CAAC) 2.00
Xiamen Aviation Industry Co. Ltd. (Xiamen
City) 12.18
14
1. TAECO Brief Introduction
www.taeco.com
TAECO Senior Management
15
1. TAECO Brief Introduction
www.taeco.com
Total Staff ( from 1993-2007 )
Total 5039 (up to August 30, 2007)
16
1. TAECO Brief Introduction
www.taeco.com
Work Force
17
Aircraft Inputs by Type
1. TAECO Brief Introduction
www.taeco.com
Aircraft Type Inputs B747 400 239 B747
Classic 110 B747 Freighter/Combi
140 B747 Cargo Conversion 26 B757
7 B737 111 B767
32 B777
2 A330 21 A340
24 MD11
9 Others 9
Total 730 (Up to
September 10. 2007)
18
Major Heavy Maintenance Capability
2. TAECO Capability
www.taeco.com
  • B737, B747, B757, B767 and B777
  • A330, A340
  • MD11
  • Structural Modifications
  • Cabin Refurbishment
  • Avionics Upgrade
  • Strip and repaint

19
Cargo Conversion Capability
2. TAECO Capability
www.taeco.com
  • Capability established
  • B747 200 P to F C to F
  • B747 300 C to F
  • B747 400 P to F C to F
  • 50 B744 contracted by Boeing till 2010
  • 15xB744 delivered
  • 5xB744 in work
  • B737 -300 / -400 (with Pemco)

20
2. TAECO Capability
www.taeco.com
Line Maintenance Services
  • Technical support and release services
  • Transit overnight servicing
  • Full technical log certification aircraft
    release
  • Defect rectification
  • Stations in P. R. China
  • Beijing
  • Shanghai
  • Xiamen

21
2. TAECO Capability
www.taeco.com
Parts Manufacturing
  • Quality System
  • AS9100-2000 (BVQI)
  • Boeing BQMS Approval
  • NDT Heat Treatment, Nadcap approved
  • Chemical Processing, Nadcap approved

22
2. TAECO Capability
www.taeco.com
Current Parts Manufacturing Capabilities
  • Structure parts (including Machine parts Sheet
    metal parts) fabrication
  • Multi-beam assembly for B747 freighter
    conversion
  • Electrical wire and wire bundle fabrication
  • Modification Kitting
  • NDT
  • Tooling Calibration Chemical, Mechanical Test
    Lab

23
Workshop Capability
2. TAECO Capability
www.taeco.com
Sheet Metal Workshop
Machine Workshop
Interior Repair Workshop
Heat Treatment Workshop
24
2. TAECO Capability
www.taeco.com
Workshop Capability
Standard Lab
NDT
Surface Treatment Shop
Multi-beam Assembly Workshop
25
www.taeco.com
2. TAECO Capability
Training
  • Approved Maintenance Training Organization under
    HKAR-147, CCAR-147 and EASA Part-147
  • In-house technical training including
  • Skills training
  • License and aircraft type training
  • Language training
  • Human Factor training
  • Non-Technical and management training
  • New training center under construction and
    expected to start operation at the end of 2008

26
3. TAECO Major Airworthiness Approval
www.taeco.com
JCAB (Japan)
FAA(USA)
EASA (Europe)
CAAC (China)
CAAS (Singapore)
CAD (Hong Kong)
27
www.taeco.com
4. Joint Ventures with TAECO

28
5.TAECO Village
www.taeco.com
  • 1800 apartments
  • 6,000 inhabitants
  • Swimming pool, basketball courts

29
www.taeco.com
6. Our Mission
30
www.taeco.com
Your Winning Formula in China
UK
Hong Kong Strategic Base
Fujian Operation Base
31
Thank You !
www.taeco.com
Write a Comment
User Comments (0)
About PowerShow.com