Title: ENAV and the SESAR JU


1
The Point of the ANSPs
  • ENAV and the SESAR JU

Kyiv, 26th June 2009
2
The scenario
  • With the existing scenario we are moving towards
    a capacity crunch
  • The increase of traffic at local and
    international level is becoming the catalyst for
    more globalization and for evolving pattern of
    ATM European industries
  • The main objective is to achieve system capacity
    in line with the traffic growth
  • The objective of increasing capacity becomes not
    only a local matter but a global international
    business due to the dimension and complexity of
    air traffic

TIME TO ACT
  • important ANSPs collective actions to be
    undertaken
  • in the incoming years

3
Europe facing development challenges
  • Research has failed to deliver the necessary
    modernisation efforts
  • Technology is not the only challenge decision
    making is also a key issue
  • In Europe, the issue is even more complex due to
    fragmentation

4
An in-depth ATM reform launched
Rationalise ATM institutional set up
Single European Sky
Launch technological development
5
SESAR JU WBS
6
WPs for ENAV contribution and Leadership
  • Management
  • WPB High level target concept and architecture
  • WPC Master Plan
  • System Engineering
  • WP03 Validation infrastructure
  • Operational threads
  • WP04 En-Route operations
  • WP05 TMA operations
  • WP06 Airport operations
  • WP07 Network operation
  • Technical Threads
  • WP10 En route and TMA ATC systems
  • WP12 Airport Systems
  • WP13 NIMS
  • WP15 Ground CNS Systems
  • Transversal activities
  • WP16 RD Transversal Areas
  • SWIM threads
  • WP08 Information management
  • WP14 SWIM

7
ANSPs Effort Distribution across WBS
8
SJU WP3 VV Infrastructure
  • The WP3 Validation Infrastructure should be able
    to support validation from single ATM
    applications up to the whole SESAR ATM Target
    Concept, supporting the relevant phases of the
    ATM System development lifecycle (focusing mainly
    on V3)

Iterative
Stepwise
In line with E-OCVM
Evolutionary
Cooperative
9
SJU WP3 Logical Process
10
ENAV and SES implementation BLUE MED FAB
  • BLUE MED is a project aiming at Functional
    Airspace Block establishment, carried out by 4EU
    Member States (Cyprus, Greece, Italy and Malta),
    answering to SES2 regulatory provisions
  • Definition Phase started in March 2009, closing
    date August 2011
  • A TEN-T funded project
  • 9 Working areas, about 150 experts involved and
    6M as an overall project cost
  • The Definition Phase aims at providing all
    details of the 2012 implemented FAB (2012 as a
    mandatory deadline)
  • At the end of the Definition Phase, FAB
    implementation subject to binding go/no-go Member
    States decision
  • Planned interactions
  • Inter-FAB cooperation as a requirement from the
    Feasibility Study
  • Users, S-JU, EASA, Staff/Prof. Associations as
    privileged stakeholders

11
ENAV and SES implementation BLUE MED FAB
  • BLUE MED is a project aiming at Functional
    Airspace Block establishment, carried out by 4EU
    Member States (Cyprus, Greece, Italy and Malta),
    answering to SES2 regulatory provisions
  • Definition Phase started in March 2009, closing
    date August 2011
  • A TEN-T funded project
  • 9 Working areas, about 150 experts involved and
    6M as an overall project cost
  • The Definition Phase aims at providing all
    details of the 2012 implemented FAB (2012 as a
    mandatory deadline)
  • At the end of the Definition Phase, FAB
    implementation subject to binding go/no-go Member
    States decision

12
BLUE MED Operational/Environmental benefits
Sept 2007 Aviation fuel 500 per tonne CO2 sold
at 22 per tonne
BLUE MED Vs shortest today (30 day extrapolation)
If traded
13
Conclusion
  • Italy supports SES through participating SESAR
    and establishing BLUEMED FAB
  • ENAV fully commited to SESAR phylosophy and
    approach
  • ENAV belives in ATM Performance Partnership
    through the partecipation of all ATM Stakeholders
  • ENAV support ANSPs primary role in RD and
    deployment actvities for the new ATM System, as
    they bear the costs and risks for its operation
  • ENAV addressed its participation in oder to
  • Exploit its know-how in ATM Operations
  • Offer to the SESAR JU its past and current main
    investments for ATM Validation tools and
    infrastructure