TCA 2'0 Overview - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

TCA 2'0 Overview

Description:

Commited Individual. Commitment with no name. Committed Team Lead. Team ... Commited Individual. Commitment with no name. Team Lead with Committed Individual ... – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 25
Provided by: OUS673
Category:
Tags: tca | commited | overview

less

Transcript and Presenter's Notes

Title: TCA 2'0 Overview


1
TCA 2.0 Overview
UNCLASSIFIED//FOR OFFICIAL USE ONLY
  • CDR Allan J. Assel
  • NSSO COMM FIO

UNCLASSIFIED//FOR OFFICIAL USE ONLY
2
Purpose
  • Introduce National Security Space
    Office/Communications Functional Integration
    Office (NSSO/COMM/FIO)
  • Describe Transformational Communications
    Architecture

3
NSSO COMM FIO Mission
  • Lead NSS Community Cooperative Effort In
  • Developing and Maintaining the Transformational
    Communications Architecture
  • Providing impartial Analysis and Recommendations
    to the NSS Leadership

4
Transformational Communications Architecture
An Opportunity for Change
Other Comm
MILSATCOM
  • Path Without TCA
  • Enhanced capabilities within stovepipes
  • Very limited Interoperability with segregated
    svcs
  • Sensor to Shooter Latency
  • Non-synchronized Terminal Developments
  • Limited ability to support emerging Information
    Dissemination Management (IDM) vision

Civil Comm
Fixed Sites
Fixed Sites
Large Communication Investment
Protected comm for thousands of small terminals
High data rates to few large terminals
Medium data rates to few large terminals
  • Path With TCA
  • Enables Network Centric Operations
  • Standards Based Interoperability and Integrated
    Services
  • Increased communications connectivity and
    capacity
  • Robust, adaptable, dynamic and flexible network
    services
  • Integrated Operations Centers
  • Accommodates Multi Security Levels
  • Enables new information exploitation models,
    i.e. fusion

5
TCA Goals
  • An Architectural Framework Discipline
  • to Guide the development of interoperable
    MILSATCOM, IC, NASA, and Commercial SATCOM
    through 2020
  • Extend the Global Information Grid (GIG)
  • through space, reduces bandwidth constraints,
    moves toward ubiquitous connectivity
  • Synchronization of space communications
  • terminals, terrestrial networks, ground
    infrastructure, and network management
  • Supports goals for Narrowband, Wideband,
  • and Protected communications
  • next generation persistent space and airborne
    surveillance, civil space vision, and the mobile
    battlefield.
  • Leverages Internet Protocol (IP) convergence
  • supports net-centric interoperation of voice,
  • video, data streams and command and control
  • Leverages and shares advanced technology
  • Such as laser communications, modern RF
    waveforms, spacecraft IP routers, nulling
    antennas, mobile terrestrial Comm on the Move
    antennas, encryption technology, and software
    driven terminals
  • Supports Communication Transport
  • of Horizontal Information Sharing across the
    U.S. government and with coalition partners

6
TCA Supports Service Visions
Navy SeaPower 21 / FORCEnet
Army Future Force/ LandWarNet
AF Air Expeditionary Force/ Constellation Net
7
TCA Supports National Civil Space Visions
Civil Missions
Other Missions
as of 04 Jan 2006
8
TCA V2.0 Operational Benefits
  • Increased Speed of Command
  • Self-Synchronization
  • Shared Situational Awareness
  • Informed Decision Making
  • Multiple Secure Levels
  • Communities of Interest
  • Improved Interoperability
  • Enabled Net-Centric Environment
  • Use of Shared Services
  • Common Infrastructure
  • Data Accessibility Across Boundaries
  • Network Built to Common Standards
  • Enhanced Information Superiority
  • Increased Availability Relevant Information at
    the Right Time
  • Bandwidth Sharing
  • IP Routing
  • Increased Global Connectivity
  • Capacity Provides Persistent and Perceptive ISR
  • Increased Agility
  • Greater Ability to Combine, Fuse and Apply
    Information
  • Highly Automated Network Management
  • User Transparency
  • Improved Ability to Conduct Mission Planning
  • Common Collaborative Tools
  • Greater Data Accessibility Across Domains
  • Improved Security Posture
  • E2E Information Assurance
  • Black Core Source Encrypted
  • Real-Time Security Measures Ensuring Identity
  • Data Authenticity
  • Secure Communications

9
UNCLASSIFIED//FOR OFFICIAL USE ONLY
TCA V2 Status V3 Strategy
LNO Comment Integration
Security Review
TC Community Staffing Comment Adjudication
Comment Integration Final Security Review
Published
  • JROCM
  • OSD CIO Memo?
  • DNI CIO Memo?
  • NASA CIO Memo?

JCB
NC FCB
NC FCB WG
NC FCB WG
TCA CONOPS
Published
Sig Coord
IPR
AO Staffing
Final Draft
IPR
V2 Lessons Learned
V3 Priorities LNO/AO Coord
SLT 24
SLT 26
SLT 25
Approve V3 Priorities Resources
Approve V3 Strategy
Approve V3 TOR Provide Closeout Guidance
Synthesis
Team Activity
Community Staffing Comment Adjudication
Security Review
Comment Integration Final Security Review
LNO, AO Coord
Published
TCA V3 Notification Message
PB08
Approval Boards Closeout Actions Per SLT 26
SLT 27
SLT 28
SLT 30
SLT 29
Approve V3 Findings/Recos
V3 Vector Check
Status V3 FR Implementation
Approve V3 FR Adjudication Plans
Completed
UNCLASSIFIED//FOR OFFICIAL USE ONLY
Planned
Requires SLT Approval
10
TCA 2.0 Findings/Recommendations
Finding 1
Finding 4
Long Range TCA Capabilities
AISR Interoperability
Architectural
Finding 5
Finding 3
Finding 2
Architecture Performance
TCA Sizing for SR COMMs
Satellite-to-Terminal Synchronization
Management
Finding 7
Finding 6
Lite Governance, Net Centricity Interoperability
TCA Network Management
11
Finding 1- ArchitecturalAISR Interoperability
  • Incompatible Communication Standards
  • Over-subscribed Bandwidth

Finding
Team Lead
Action
Recommendation
12
Finding 2 - Architectural Satellite-to-Terminal
Synchronization
  • JTRS Synchronization
  • Software Configurable Architecture (SCA)
    Compliance

Finding
Team Lead
Program
Action
Recommendation
13
Finding 3 - Architectural TCA Sizing for SR
Comms
  • Organizational Responsibility
  • Access Capacity
  • User Impacts

Finding
Action
Team Lead
Recommendation
14
Finding 4 - Architectural CA Capabilities Beyond
Effectivity 3 (FY2016)
  • Capacity Short of Demand
  • Spectrum Over Subscribed
  • Need Architecture Replenishment Plan

Finding
Team Lead
Action
Recommendation
15
Finding 5 - Architectural Conducting TCA
Enterprise Trades
  • Between Communities of Interest
  • Competing Access
  • Bandwidth Sharing
  • IA Impacts
  • Standards Selection

Finding
Team Lead
Action
Recommendation
16
Finding 6 - Management TCA Network Management
  • Joint IC, DoD NASA
  • Interface Definitions
  • Certification and Accreditation
  • Service Level Agreements

Finding
Co-Leads
Action
Recommendation
17
Finding 7 - Management TCA Net-centricity
Interoperability Requires Cross-Community
UNCLASSIFIED/FOR OFFICIAL USE ONLY
Team Leads
Finding
Recommendation
UNCLASSIFIED/FOR OFFICIAL USE ONLY
17
18
The Future
  • TCA V3.0

19
UNCLASSIFIED/FOR OFFICIAL USE ONLY
  • Goal
  • Conduct biennial update of TCA 3.0 in support of
    the 2010 POM Cycle
  • Meeting Objectives
  • Approve Priorities for TCA v3.0
  • Commit to Resource Strategy TCA v3.0 Teams
  • Focus Areas
  • Leadership
  • Composition
  • Tasks
  • Schedule
  • Way Ahead for JAN 2007 SLT

UNCLASSIFIED/FOR OFFICIAL USE ONLY
20
Transformational Communications
Architecture(TCA)
  • Products
  • TCA Document
  • Effectivities
  • Master Schedule
  • DoDAF Views
  • Team Outputs
  • TCA Objectives
  • Articulate the TC vision
  • Document the TCA roadmap
  • Derive acquisition priorities
  • Enable TCA compliance assessments

21
Priorities for TCA v3.0
  • Revalidate Tenets and Attributes
  • Update, Analyze, and improve TCA
  • Shortfalls, Gaps and Overlaps
  • Include Results from
  • Airborne Intelligence Surveillance and
    Reconnaissance (AISR) Analysis of Alternatives
    (AoA)
  • Wideband AoA
  • Space Radar Study
  • NASA COMM Architecture
  • Revisit Architecture End State
  • Incorporate relevant TCA v2.0 Findings
    Recommendations, Lessons Learned and JROC KMDS
    Comments
  • Knowledge Management/Decision Support

22
TCA v3.0 Team Leadership
23
TCA Communication Thread Team Leadership
24
TCA v3.0 Team Compositions
Legend ? Commited Individual ? Commitment with
no name Committed Team Lead Team Lead with
no name
25
Communication Thread Team Compositions
Legend ? Commited Individual ? Commitment with
no name Team Lead with Committed Individual
Team Lead with no name
26
TCA Improvements
  • Key Enablers
  • Information Assurance
  • Network Management
  • Technology Insertion
  • Airborne Concentrator
  • Satellite IP Command and Control
  • Memory in Space
  • DoDAF Views

27
UNCLASSIFIED/FOR OFFICIAL USE ONLY
TCA V2 Status V3 Strategy
LNO Comment Integration
Security Review
TC Community Staffing Comment Adjudication
Comment Integration Final Security Review
Published
  • JROCM
  • OSD CIO Memo?
  • DNI CIO Memo?
  • NASA CIO Memo?

JCB
NC FCB
NC FCB WG
NC FCB WG
TCA CONOPS
Published
Sig Coord
IPR
AO Staffing
Final Draft
IPR
Team Activity
V2 Lessons Learned
TCA V3 NotificationMessage
V3 Priorities LNO/AO Coord
SLT 24
SLT 25
Approve V3 Priorities Resources
Approve V3 Strategy
Synthesis
Team Activity
Community Staffing Comment Adjudication
Security Review
Comment Integration Final Security Review
Published
Approval Boards Closeout Actions Per SLT 26
SLT 27
SLT 26
SLT 28
SLT 30
SLT 29
Approve V3 TOR Provide Closeout Guidance
Approve V3 Findings/Recos
V3 Vector Check
Status V3 FR Implementation
Approve V3 FR Adjudication Plans
Completed
UNCLASSIFIED//FOR OFFICIAL USE ONLY
Planned
Requires SLT Approval
28
Phased Approach
29
Team Schedule
2006
2007
Phase 2
Phase 1
Phase 3
Phase 2
Phase 2 - 3
Phase 3
30
Future Tasks Outside Scope
  • TCA v3.0 Joint Capabilities Document (JCD)
  • More comprehensive set of DoDAF views
  • NCOE Mission Thread Analysis
  • TCA v3.0 Detailed Performance Metrics

TCA v3.0 will include constellation loading
information capacity, access and terminal
availability
31
Conclusion
  • Approval to Proceed
  • Commitment of Resources
  • Objectives for JAN SLT
  • TCA v3.0
  • Tenets Attributes
  • Terms of Reference
  • Detailed Team Schedules

32
Transformational Communications Architecture
  • TCA is a space transport-level architecture that
  • Works in concert with the Global Information Grid
    (GIG) to help synchronize multiple acquisitions
  • Promotes standards and interoperability
  • Delivers time-phased capability in an
    evolutionary approach
  • Supports information architecture concepts that
    enable critical Information Sharing needs of the
    U.S. DoD, Intelligence Community and Civil Space
Write a Comment
User Comments (0)
About PowerShow.com