US-VISIT Facilities - PowerPoint PPT Presentation

1 / 31
About This Presentation
Title:

US-VISIT Facilities

Description:

The United States Visitor and Immigrant Status Indicator Technology ... Derby Line. 45. 4. AZ. Lukeville. 44. Lanes Inbound. State. Port Name. Ranking. 18 ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 32
Provided by: joseph479
Category:

less

Transcript and Presenter's Notes

Title: US-VISIT Facilities


1
US-VISIT Facilities Engineering
United States Visitor and Immigrant Status
Indicator Technology
Transportation Border Working GroupDelta Bow
Valley Calgary, AlbertaOctober 20 and 21st
2
Overview - Facilities and Engineering Update
  • Milestones/Accomplishments Achieved
  • Current Status and Progress
  • Program Increment Details
  • Environmental Strategy
  • Coordination and Communications
  • Current Challenges and Issues
  • Questions/Discussion

3
Achievements and Milestones
  • Program Consolidated
  • Multiple Increments Defined, Staffed and Underway
  • Increment 1 (Airports/Seaports) Implemented
  • Increment 2A (Biometric Documentation) To Be
    Implemented by the end of October
  • Prime Integrator Selected and Underway

4
Other Accomplishments
  • Over 250 known criminals have been prevented from
    entering the country
  • Over 1,000 individuals (including convicted
    rapists, drug traffickers, and other felons) have
    been intercepted using biometrics.
  • Over 6 million foreign visitors have been
    enrolled in the program with no significant wait
    times attributed to US VISIT

5
At Present
  • Developing End Vision and Strategic Plan for US
    VISIT
  • Completing Concept of Operations and Business
    Requirements for Land Port Implementation
  • VWP (Visa Waiver) travelers now included in
    US-VISIT
  • Implementation of Entry capability at top 50 LPOE
  • Radio Frequency (RF) identification technology
    currently being evaluated (passive, remote
    transponders)

6
Increments Defined
  • Increment 1 Air and Seaport Entry, Pilot Exit
  • Increment 2A Biometric Enabled Documentation
  • Increment 2B Biometric Collection on Entry at
    50 Largest Ports
  • Increment 3 Biometric Collection on Entry at
    All Remaining Land Ports (continuation of
    Increment 2B)
  • Increment 2C Radio Frequency (RF) Enabled
    Technology at Selected Ports on Entry and Exit

7
Implementation Requirements
  • Increment 1 01/05/2004

Increment 2A 10/26/04 (US Docs)
Increment 2B 12/31/04
Increment 2C TBD
Increment 3 12/31/05
End Vision TBD
8
What Has Changed?
  • Increment 2C Entry/Exit RF operations to be
    piloted at a selected number of ports by Jun 05
  • Depending on results of the pilot test,
    additional ports will be considered for RF
    entry/exit implementation
  • DHS Screening Initiative
  • DHS Center of Excellence for Biometrics

9
Key Dates
  • May 28, 2004
  • Prime Integrator contract awarded
  • June 4, 2004
  • US-VISIT Office completes majority of
    consolidation to permanent location
  • September 30, 2004
  • US-VISIT procedures were expanded to include
    visitors traveling to the U.S. under the Visa
    Waiver Program (VWP) arriving at air and sea
    ports of entry
  • October 26, 2005
  • Increment 2A implementation deadline
  • December 31, 2004
  • US-VISIT entry capability installed at 50 highest
    volume Land Ports of Entry
  • June 1, 2005
  • Implement pilot test of RF Technology at selected
    ports of entry
  • December 31, 2005
  • Extend Increment 2B functionality to all
    remaining land ports of entry

10
Increment 2B Entry Capability at the 50 Highest
Volume Land Ports of Entry
11
Increment 2B - Detail
  • 50 Highest Volume Land Ports of Entry
  • To Be Completed by 12/31/04
  • Same Functionality as Airports and Seaports
    (Increment 1)
  • Only Affects Secondary Processing Areas
  • No expected increase in referrals to secondary

12
(No Transcript)
13
Increment 2B Top 50 LPOEs
Ranking Port Name State Lanes Inbound
1 San Ysidro CA 24
2 Lincoln-Juarez Bridge TX 12
3 Calexico West CA 10
4 Hidalgo TX 12
5 Paso Del Norte TX 9
6 Otay Mesa CA 20
7 Gateway to the Americas, TX 4
8.1 Queenston- Lewiston Bridge NY 10
8.2 Whirlpool Bridge NY 4
8.3 Rainbow Bridge NY 19
9 San Luis AZ 8
10 Nogales East AZ 8
14
Increment 2B Top 50 LPOEs
Ranking Port Name State Lanes Inbound
11 Bridge of the Americas TX 16
12 Ysleta TX 18
13 Douglas AZ 8
14 Brownsville-Gateway TX 5
15 Calexico East CA 11
16 Detroit Ambassador Bridge MI 21
17 Peace Bridge NY 15
18 Detroit Tunnel MI 11
19 Pharr TX 8
20 Del Rio International Bridge TX 6
21 Brownsville and Matamoros TX 4
15
Increment 2B Top 50 LPOEs
Ranking Port Name State Lanes Inbound
22 Eagle Pass II TX 8
23 Port Huron Blue Water Bridge MI 15
24 Veterans International Bridge TX 8
25 Progreso TX 6
26 Eagle Pass I TX 5
27 Sault Ste. Marie MI 5
28 Nogales West (Mariposa) AZ 7
29 Andrade CA 3
30 Roma TX 5
31 Pacific Highway WA 9
32 Peace Arch WA 7
33 Champlain NY 10
16
Increment 2B Top 50 LPOEs
Ranking Port Name State Lanes Inbound
34 Los Indios Free Trade Bridge TX 8
35 Tecate CA 3
36 Rio Grande City TX 5
37 Massena NY 5
38 Ferry Point ME 3
39 Thousand Islands NY 8
40 International Falls MN 4
41 Presidio TX 6
42 Sumas WA 5
43 Colombia-Solidarity Bridge TX 12


17
Increment 2B Top 50 LPOEs
Ranking Port Name State Lanes Inbound
44 Lukeville AZ 4
45 Derby Line VT 5
46 Point Roberts WA 4
47 Fabens TX 2
48 Lynden WA 7
49 World Trade Bridge TX 8
50 SantaTeresa NM 3
18
(No Transcript)
19
(No Transcript)
20
(No Transcript)
21
Increment 3 Entry Capability at Remaining Ports
of Entry
22
Increment 3 Land Deployment
23
Increment 2C Entry and Exit RF Technology
Capability at Selected Land Ports of Entry
24
Increment 2C RF Technology
  • The first time a traveler is processed in US
    VISIT, they will be issued a unique automatic ID
    (a-ID), which is an RF tag.
  • This tag would be attached to a travel document
    at that time
  • Upon exit from the country at an RF enabled port,
    the a-ID would be passively and remotely read to
    register the exit of that tag.
  • Upon re-entry to the country at an RF enable
    port, the a-ID will be read prior to entering the
    primary inspection booth area, so that traveler
    information can be made available to the
    inspector as the traveler approaches

25
Increment 2C RF Technology
26
Increment 2C RF Technology
27
Environmental
  • US VISIT has been, and will be, in full
    compliance with the National Environmental Policy
    Act (NEPA).
  • Documentation completed successfully for the
    Airport and Seaport implementation
  • Department of Homeland Security Environmental
    regulations are in the process of being finalized
  • A number of strategies are available to US VISIT
    to ensure compliance

28
Ongoing Land Planning Activities
  • Coordination with State DOTs
  • Coordination with Historic Preservation Officers
  • Historical Archaeological Field Surveys
  • Legal Boundary Surveys
  • Space Utilization Surveys
  • Feasibility Studies

29
What will occur in 2005
  • Entry capability to 50 busiest land POEs to be
    completed by beginning of 2005
  • Pilot Exit implementation at selected ports by
    June 1, 2005
  • Biometric enrollments reduced at POEs as the
    biometric capture/process is increased at
    overseas Consular Offices
  • DHS continues to perform biometric identity
    verification for travelers with biometric visas
    (one-to-one)
  • DHS continues checking inkless finger scans
    against a database of criminal and terrorist
    watch lists (one-to-few)

30
Current Challenges and Issues
  • Public perception
  • Privacy issues
  • Number of stakeholders
  • Preventing impact to wait times
  • Aggressive deadlines

31
Homeland Security
Write a Comment
User Comments (0)
About PowerShow.com