The Effect of TMDL on Wastewater Management - PowerPoint PPT Presentation

1 / 24
About This Presentation
Title:

The Effect of TMDL on Wastewater Management

Description:

The Effect of TMDL on Wastewater Management – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 25
Provided by: e35158
Category:

less

Transcript and Presenter's Notes

Title: The Effect of TMDL on Wastewater Management


1
The Effect of TMDL on Wastewater Management
  • Issa Hamud, P.E
  • City of Logan

2
Presentation Outline
  • Introduction
  • Description of Facilities
  • Historical Performance
  • Future Facility Requirements
  • TMDL Goals for Cutler Reservoir
  • Mechanical Plant for Phosphorus Removal

3
Description of Facilities
  • Description of Facilities
  • Lagoons
  • Head works
  • 7 lagoon cells
  • Aeration system
  • chlorination
  • Conveyance ditch
  • Wetlands
  • Inlet pond
  • Screw pumps
  • 6 wetland cells
  • 2 storage cells
  • Discharge point

4
Logan Wastewater Service Area Population
Projection
128,000
Thousands
Year
5
Logan Wastewater Service Area Flow Projection
28 MGD
MGD
Year
6
Logan Used Facultative Lagoons Until the Mid
1980s
7
City of Logan Lagoons
Headworks
A2
A1
B2
B1
C
Chlorine Contact Basin
D
E
8
Logan Treatment Wetlands and Storage Ponds July
2004
N
Storage Ponds
150 MG
250 MG
002
5
1
4
3
2
Inlet Pond
Screw Pumps
From Lagoons
9
Currently, Aerated Lagoons are Used to Treat the
Citys Wastewater
10
Discharge was Moved to Cutler Reservoir Because
of Increased Water Quality Standards on the
Little Bear River
11
Wetlands Added to Remove Ammonia
12
Cutler Reservoir Beneficial Use Assessment
  • 2B Secondary Contact Recreation Fully
    Supported
  • 3B Warm Water Game Fishery Partially Supported
  • 3D Water Fowl Habitat - Fully Supported
  • 4 Agricultural Use - Fully Supported

13
Historical Performance
  • Historical Performance
  • Lagoons
  • BOD
  • TSS
  • Ammonia
  • Total Phosphorous
  • Wetlands
  • BOD
  • TSS
  • Ammonia
  • Total Phosphorous

14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
Cutler Reservoir
19
Proposed Phosphorus Limits
  • A target of 0.070 mg/L TP would be set for each
    segment (13) of the Northern Reservoir, and a
    target of 0.18 mg/L TP would be set for each
    segment (4 and 5) of the Southern Reservoir.

20
Required Reduction Level
  • a 20 reduction of loads from tributaries and
    point sources that are not currently covered
    under another TMDL and have total phosphorus
    concentrations in excess of 0.05 mg/L. These
    include non-point sources along Swift Slough,
    Blue Springs Ditch, the Logan WWTP, the Utah
    portion of the Bear River, and Clay Slough. A 20
    reduction of internal load would also be required
    to meet the endpoints in the Southern Reservoir.
  • Logan WWTP would be required to meet the Southern
    Reservoir endpoint.

21
Next Step
  • Sequential Batch Reactor SBR Plant
  • Annual AVE Daily Flow 28 mgd
  • Peak Month AVE Daily Flow 48 mgd
  • Capital Cost 188 million
  • Annual OM Cost 3 million
  • Seek New Technologies
  • Enhanced Biological Phosphorus Removal (EBPR)
  • Algae System

22
(No Transcript)
23
Enhanced Biological Phosphorus Removal (EBPR)
24
Algae System
Write a Comment
User Comments (0)
About PowerShow.com