2MuCool Program
- Mission
- Design, prototype and test all cooling channel
components (SFOFO) - 201 MHz RF Cavities, absorbers, SC solenoids
- Support MICE (cooling demonstration experiment)
- Perform high beam-power engineering test of
cooling section components
- Currently consists of 9 institutions from the US
and Japan
RF Development ANL Fermilab IIT JLAB LBNL Mississi
ppi
Absorber RD Fermilab IIT KEK NIU Mississippi Osak
a
Solenoids LBNL Mississippi
3- RD Focus of MuCool
- Component testing Fermilab
- RF Cavities
- High RF-power Testing
- Absorbers
- Technology tests
- High power-load testing
- With beam
- Magnets
4MuCool Test Area
- Facility to test all components of cooling
channel (not a test of ionization cooling) - At high beam power
- Designed to accommodate full Linac Beam
- 1.6 X 1013 p/pulse _at_15 Hz
- 2.4 X 1014 p/s
- 600 W into 35 cm LH2 absorber _at_ 400 MeV
- RF power from Linac (201 and 805 MHz test stands)
- Waveguides pipe power to MTA
5MTA Hall
6MTA
- The MTA is the focus of our Activities
- RF testing (805 and 201 MHz)
- High pressure H2 gas-filled RF
- LH2 Absorber tests
- Two parts of infrastructure yet to be completed
- Cryo Plant
- Beam Line
7Phase I of RF Cavity Closed Cell Magnetic Field
Studies (805 MHz)
- Data seem to follow universal curve
- Max stable gradient degrades quickly with B field
- Sparking limits max gradient
- Copper surfaces the problem
Gradient in MV/m
Peak Magnetic Field in T at the Window
8Phase II of 805 MHz studies
- Study breakdown and dark current characteristics
as function of gradient and applied B field in
Pillbox cavity - Curved Be window Test
- TiN coated
- Cavity has been conditioned to 32MV/m without B
field - Measurements at 2.5T
- So Far stable gradient limited to about 14MV/m
- Button test
- Evaluate various materials and coatings
- Quick Change over
9RF RD 201 MHz Cavity Design
- The 201 MHz Cavity is now operating
- Recently reached 16MV/m at B0 (design gradient!)
10Absorber Design Issues
- 2D Transverse Cooling
- and
- Figure of merit MLRdEm/ds
- M2 (4D cooling) for different absorbers
H2 is clearly Best - Neglecting Engineering
Issues Windows, Safety
11Convective Absorber Activities
- First Round of studies of the KEK absorber
performed in the MTA - GHe used to input power
12Convective Absorber Activities II
13Convective Absorber Activities III
- Next Round of tests will use a modified absorber
- Test
- Electrical Heater
- New Temperature sensors
- LH liquid level sensor
Instrumentation will be used in MICE
Absorber Body being modified in Lab 6 at Fermilab
14MuCool and MICE
- Muon Ionization Cooling Experiment (MICE)
- Demonstration of Study II cooling channel
concept - Has Phase I UK funding (20M)
- MuCool Collaboration interface to MICE
- Design Optimization/develop of Study II cooling
channel - Simulations
- Detailed engineering
- Full component design
- Systems integration
- Safety
- RF cavity development, fabrication, and test
- Absorber development, fabrication, and test
- Development of beam line instrumentation
- MuCool will prototype and test cooling hardware
including MICE pieces for which the collaboration
is responsible - Fermilab is also contributing to the cryogenics
and readout electronics for the two fiber
trackers used in the spectrometers.
15MTA recent activities
- Due to Tritium problem from Numi
- Our cooling water feed for the MTA hall was
changed to Caseys pond - Introduced some problems that have now been
remedied - LHe delivery system for magnet has been upgraded
- Heat load now at spec
- 5T Solenoid has been re-trained
- Now operates at spec
- Instrumentation Installed
- Spark protection for 201 cavity
- Includes video camera and DVR
- Scintillation counters
- Now have complete coverage for 805 and 201
systems - Includes thin and thick Plastic counters and NaI
16Plans for the MTA
- 805 MHz RF studies (with and without B field)
- Long-term (1 week) conditioning at fixed gradient
and 2.5T - Be Window tests
- Materials tests
- Surface treatment
- 201 MHz RF test program
- B field tests
- Conditioning to highest possible gradient (up
16MV/m) at max field available from magnet - Curved Be Windows
- Note The 201 MHz power source from the Linac has
been offline since before the end of the shutdown - Hope to have it available for our program in the
next week or two - Second round of tests with KEK LH2 convective
absorber