Title: Mike Peckham


1
Pickering A Units 2 3 Safe Storage Project
Mike Peckham CAC January 16, 2007
2
The Decision
OPG Management recommended that the restart of
Units 2 and 3 not proceed, based on return on
investment analysis. Decision endorsed by Board
of Directors and Provincial Government. This
decision is final.
  • Environmental Assessment
  • Site Acceptance
  • Construction
  • Commissioning
  • Operation
  • Safe Storage
  • Dismantling
  • Site Restoration

3
Safe Storage Stage
  • Overall principles have been identified
  • Both reactors will be defuelled.
  • Heavy water will be removed from the moderator
    and heat transport systems.
  • Systems will be de-activated (where possible).
  • Common systems supporting Units 1 and 4 will be
    moved to a live unit (where possible).

4
Strategy
  • System end states have been developed for each of
    the 53 groups of systems identified for system
    performance monitoring.
  • End states are being documented and approved in a
    Safe Storage Package, which will include
  • Flowsheets
  • Controlled document lists
  • Master equipment lists
  • Power supply lists
  • Air supply lists
  • Active TCR
  • Applicable predefined

5
(No Transcript)
6
Engineering Packages
7
Schedule - Milestones
8
Progress to Date
  • Maintenance of safe, laid-up state
  • Rehabilitation of Unit 2 fueling machines
  • 104 End State Determination Reports
  • Development of project governance
  • Budget quality cost estimate
  • Project Execution Plan
  • Initial contracts for design engineering
  • CNSC staff in Ottawa briefed no significant
    concerns raised
  • Commenced defueling Unit 2 August 23
  • Design changes 69 of 612

9
Licensing Issues
  • The CNSC has approved reactor defuelling and
    removal of heavy water under the existing
    operating license.
  • At sometime in the future after the fuel and
    heavy water have been removed, the license may
    again be modified to reflect the safe storage
    conditions.