OPS SCC Workshop R - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

OPS SCC Workshop R

Description:

Carbonate/bicarbonate environments existed at locations of high-pH SCC ... Shot peening and grit blasting can significantly increase the resistance of a pipe to SCC ... – PowerPoint PPT presentation

Number of Views:53
Avg rating:3.0/5.0
Slides: 16
Provided by: gri
Category:
Tags: ops | scc | blasting | cracks | workshop

less

Transcript and Presenter's Notes

Title: OPS SCC Workshop R


1
OPS - SCC Workshop RD Past and Present
  • December 2, 2003

Jerry Rau - Panhandle Energy
2
Outline
  • Review of past RD accomplishments
  • Recent and current SCC RD efforts

3
The History
  • 1965
  • Identified SCC as a possible cause of pipeline
    failures
  • 1965 - 1970
  • SCC identified as an industry-wide concern, not
    an isolated incident

4
Early Research
  • 1966 - 1968
  • Carbonate/bicarbonate environments existed at
    locations of high-pH SCC
  • A carbonate/bicarbonate environment could cause
    SCC of a carbon steel
  • 1966 - 1970
  • Reproduced high-pH SCC in the laboratory

5
Research on the Stress Component
  • 1975 - 1983
  • Thorough cleaning of the pipe surface to remove
    mill scale prior to coating should significantly
    reduce the probability of high-pH SCC
  • 1980 - 1984
  • Developed a method to determine the threshold
    stress for SCC in a single test with a single
    (tapered) specimen
  • 1973 - 1983
  • Discovered that low-frequency, low-amplitude
    stress fluctuations could reduce the threshold
    stress considerably

6
Material Issues
  • 1970 - 1980
  • Showed that there is no direct correlation
    between the grade of pipe (for X46 through X80)
    and its susceptibility to high-pH SCC (1970-1980)
  • 1973 - 1981
  • Shot peening and grit blasting can significantly
    increase the resistance of a pipe to SCC

7
Temperature Issues
  • 1968 - 1975
  • Demonstrated that lower discharge temperatures
    can have a substantial beneficial effect on
    reducing the probability of a failure due to
    high-pH SCC.
  • Results in much lower crack growth rates
  • Results in narrower range of environmental
    conditions that will support SCC
  • Slower deterioration of coatings

8
Mitigation Issues
  • 1975 - 1995
  • Periodic hydrostatic retesting is an effective
    way to assure the integrity of a pipeline that
    may have stress-corrosion cracks
  • 1972 - 2002
  • Developed a life-prediction model for high-pH SCC
    that enables a pipeline operator to evaluate the
    significance of cracks that are discovered and
    adequately sized.

9
Environmental Issues
  • 1977
  • Discovered that relatively dilute groundwater
    containing CO2 could cause transgranular
    (near-neutral-pH) SCC
  • 1977 - 1987
  • Determined that near-neutral-pH SCC occurs only
    in areas where little, if any, cathodic-protection
    current reaches the steel
  • 1980-2000
  • Determined that stress fluctuations are critical
    with near-neutral-pH SCC as well as with high-pH
    SCC

10
Prioritizing Areas to Inspect for SCC
  • 1977 - 2002
  • Guidelines developed for improving the cost
    effectiveness of hydrostatic retesting, in-line
    inspections, and bellhole inspections.
  • Based upon proximity to other SCC locations,
    coating type, geology, soil type, temperature
    history, and pressure history

11
Managing SCC
  • 1965 - 2000
  • A practical way to manage the SCC problem (both
    high-pH and near neutral-pH) for future pipelines
  • The coating and
  • The condition of the pipe surface
  • Eg. The use of fusion-bonded epoxy coatings on
    mechanically cleaned surface preparation

12
RD Projects in PRCI Materials Committee
  • SCC Susceptibility
  • SCC Initiation Susceptibility Ranking/Screening
  • Review of Stress Corrosion Cracking of Pipelines
    in Contact with Near-Neutral (Low) pH Solutions
  • SCC Crack Growth / Re-inspection Intervals
  • Growth Model for Assessment after SCC Detection
  • SCC Crack Growth - Effects of Operating
    Practices
  • Effects of Pressure Fluctuations on Near-Neutral
    SCC Propagation
  • SCC Crack Extension and Coalescence Modeling
  • Hydrostatic Testing Frequencies for SCC Control
  • Field Studies to Support SCC Life Prediction
    Model

13
RD Projects in PRCI Materials Committee
  • SCC Direct Examination
  • Application of Phased Array UT Characterization
    in the Field
  • Reliable Diagnosis of SCC During Field
    Inspection
  • SCC Engineering Critical Assessment
  • SCC Acceptance Criteria
  • Model for Assessing Remaining Strength of Line
    Pipe with Co- existent Corrosion and SCC
  • SCC Mitigation Repair
  • Permanent Field Repair of SCC
  • Cyclic Stress/Strain Behavior of Steels for SCC
    Service

14
RD Projects in PRCI CI Committee
  • Transforming Shallow Cracks to Significant Cracks
  • SCC Sample management
  • Disbonded Tape - EMAT on MFL
  • Prediction of SCC from Field Measurements
  • Maps Technology for Stress Measurement
  • SCCDA Development Support
  • NLH/Barkhausen

15
Summary
  • Research Continuous From 1965
  • Much has Been Learned
  • More Still to be Learned