Title: Staves Still to Load


1
Staves Still to Load
  • G. Darbo - INFN / Genova
  • SQTF WEB Site
  • http//www.ge.infn.it/ATLAS/SQTF/

2
Loaded Staves
  • The loading rate (excluding the ramping up where
    Wuppertal was not in and the last few staves
    where dates are not updated yet) is 0.4
    staves/day or 2.8 staves/week. (Goal was 4
    staves/week).

3
List Of Loaded Staves with New Pipe
  • 53 Staves with new pipe already loaded
  • GE 21 Staves loaded since 9/1/2006
  • MA 22 Staves loaded since 13/1/2006
  • WU 10 Staves loaded since 1/3/2006
  • The goal is 86. Remain 33 staves to be loaded.
    Completion of the production requires 12 weeks if
    lack of bare staves are not blocking loading.

4
Modules Available for Loading
  • Grand Total 26.5 2.2 3.6 6.5 38.7 Staves

5
Bare Stave Availability
  • Already Available 9
  • IVW Batch no.4 11
  • Survey complete (22/6) ? Comelec ? CERN ? Genova
    for Joule test (29/9) ? Distribution to loading
    Sites (4/7)
  • Next Pipes - Repaired Staves 16
  • At CPPM from EB (22/6) for leak test, sand
    blasting and measuring ? Cleaning at CERN (3/7) ?
    Parylene at Comelec (5/7) ? To Genova/IVW (10/7)
  • Repair rate 5/6 staves/week ? End of July.
  • Next Pipes - IVW New Staves 11
  • Production completed ??
  • Total number of Staves 47