The LINK2000 Datalink Test Facility - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

The LINK2000 Datalink Test Facility

Description:

The LINK2000 Datalink Test Facility – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 14
Provided by: iher9
Category:

less

Transcript and Presenter's Notes

Title: The LINK2000 Datalink Test Facility


1
The LINK2000 Datalink Test Facility
  • LIT 15/PSG 22
  • Brussels - 25/03/2009

Isabelle HERAIL EUROCONTROL Experimental Center

2
Contents
Test Facility News
Support to LINK2000 Stakeholders
Short-Term Plans
3
ATN Routes Monitoring Tools
  • To Monitor the ATN/VDL-M2 infrastructure from a
    ground center perspective
  • To Visualize which connected aircraft /when
  • To Detect anomalies in IDRP routes
  • To help on Investigations of OPS Issues
  • To Provide Statistics Airlines/Aircraft
  • Two TOOLS in PC Linux Environment
  • ATN Routes On Line Monitoring (OM), Ready
  • ATN Routes Post Analysis Monitoring (PAT)
  • Captured IDRP Update PDUs traces integrated in a
    MySQL database
  • Web based User Interface

4
OM Routes to Aircraft Samples
History of Routes to aircraft
Current Routes to aircraft
5
Support To Airlines Certification (1)
  • Formalization of Certification Support process
  • Definition of documents to be provided to an
    applicant
  • Certification Support Description (CSD)
  • Contract document
  • Declaration of Design and Performance (DDP)
  • Test Scenario Specification and Test Result
  • Definition of documents/data organisation
    structure
  • Justification of the LINK2000 Test Facility
    Ground Tools as Validation Tools
  • Test Facility Description and Design Docs
  • Technical Requirements Specs
  • Acceptance Test Plans and Test Results
  • Safety Summary

6
Support To Airlines Certification (2)
7
Issue Mis-Use of the CM/CPDLC GAT
  • Tool available for Airlines Since Sept 2006
  • To exercise CPDLC Independently from a test bed
    or grounded equipped aircraft
  • CPDLC familiarization for aircrew
  • To check avionics installation
  • To verify CMU/ATSU non-regression or new software
    release
  • Hosted on the Datalink Test Facility on LFPYTEST
  • SUCCESS Story until September 2008 !
  • DLH, SAS, RJA, HLX, AZA, BER
  • UNTIL . Mis Use Logon in Flight observed ? !!!

8
Issue Mis-Use of the GAT
  • Even though the tool is auto-protected against
    mis-understanding
  • There is (was) nothing preventing it to be used
    in flight
  • The tool was observed to be used in flight, in
    Maastricht airspace or close to it
  • Inappropriate Logon to LFPYTEST when EDYY was
    already CDA
  • no OPS consequence as the CPDLC connection could
    not established from LFPYTEST (CPDLC-Start
    Rsp-DM107)
  • Aircraft with LFPYTEST as CDA when in just before
    entry in Maastricht airspace
  • CPDLC connection with EDYY could not be
    established.

9
Issue Mis-Use of the GAT
  • Technical implementation of a filter at Logon
    step
  • The Logon is accepted only when CallSign
    EEC9999 received
  • Better than previous situation, but not optimal
    as some airborne config may allow the initial
    CallSign to be changed in flight.
  • Procedural Ask the Airlines to sign a paper in
    which they accept the conditions for using the
    tool
  • A Safety analysis was conducted in Nov 2008 with
    three Airlines (those who had been observed using
    the tool in flight)
  • Outcome
  • The risk is minimum with dedicated CallSign
  • The paper is acceptable

10
Issue Mis-Use of the GAT
  • TECHNICAL
  • Implementation of A Call Sign filter EEC9999 at
    Logon step
  • Non sense values in the Uplink Clearances
  • PROCEDURAL
  • Pre-Requisites for Using the Test Facility
  • Document sent to Airlines on the in Dec 08 for
    information and VISA.

11
Contents
Test Facility News
Support to LINK2000 Stakeholders
Short-Term Plans
12
Airlines/Avionics/ANSPs/CSPs Support
  • Airbus ATSU FANS-B PM-CPDLC
  • Honeywell Investigations of TP4 Issues
  • Input to Air Implementation Guidance
  • SITA
  • ARINC
  • ENAV

  • Maastricht New FDPS SAT New AGDL
  • CM/CPDLC Generic Interop Test Plan
  • Input to Ground Implementation Guidance

13
Contents
Test Facility News
Support to LINK2000 Stakeholders
Short-Term Plans
14
Short Term Plans
On going support to the Avionics/Airlines/ANSPs/AC
SPs
Consolidate the Test Facility in support to
Certification process
ATN routes monitoring function Final setup

Specify AGTS equipment upgrade for support of
Multi-Frequency
15
Conclusion/Questions?
A small word on CESAR ?
Thank You !!!
Write a Comment
User Comments (0)
About PowerShow.com