Title: Investment and Industrial Climate in Uttar Pradesh
1Investment and Industrial Climate in Uttar Pradesh
2THE GROWTH PATTERN
3Comparison of GSDP growth rates UP v/s other
states
4Comparison of Industrial growth UP v/s other
states
5INVESTMENT
6Inter-state comparison of investment
7During 1990s
92 OF THE TOTAL INVESTMENT WAS IN HEAVY AND
MEDIUM INDUSTRY
- CONCENTRATED IN
- CHEMICAL CHEM PRODUCTS
- TRANSPORT
- METAL PRODUCTS
- FERTILISER
- TELECOMMUNICATION
8SSI SECTOR ATTRACTS ONLY 8.41 OF THE TOTAL
INVESTMENT
- CONCENTRATED IN
- FERTILISERS
- METAL PRODUCTS
- CHEMICAL AND CHEMICAL PRODUCTS
- MACHINE AND EQUIPMENTS
- RUBBER PLASTIC
955 OF THE SSI INVESTMENT CONCENTRATED IN 15
DISTRICTS
87 OF HEAVY AND MEDIUM INDUSTRY INVESTMENT WAS
CONCENTRATED IN 16 DISTRICTS
65 OF SSI UNITS HAVE LESS THAN Rs 1 LAC
INVESTMENT AND 93 HAVE LESS THAN Rs 5 LAC
INVESTMENT
10(No Transcript)
11(No Transcript)
12PROFIT AS OF PRODUCTION
13PROFIT AS OF INVESTMENT
14Key completed investments in UP (2002-2005) by
disrict
Large proportion of all Greenfield investment
all foreign investment
Brownfield expansions of existing investors
15BOTTLENECKS/ OBSTACLES
16Private sectors ranking of investment climate
bottlenecks (UP)
17Main Investment Climate Obstacles, Ranked by
Sector
18THE ENERGY CHALENGE
19(No Transcript)
20(No Transcript)
21(No Transcript)
22(No Transcript)
23ACCESS TO LAND
24Cost of Registering Property Across India
25Time in Registering Property Across India
26APPROVALS, INSPECTIONS AND TAXES
27- Types of Clearances Required to Set Up an
Industrial Unit in UP - First-phase approvals/No-objections/Sanctions/Lice
nses etc. required prior to setting up a unit - Provisional registration of SSI
- Land allotment
- NOC from Pollution Control Board
- Land-use permission
- NOC under Land Ceiling Act
- Building map approval
- Provisional registration of Trade tax
- Electric connection for construction
- NOC for license under Drug Cosmetic Act
- Power sanction
- NOC from Forest Department
- Assurance for allotment by Excise Department
- High Speed Diesel (HSD) storage permission/No
objection from District Magistrate
28- Second-Phase Approvals/No-objections/ Licenses
etc. required before starting operations - Permanent registration of SSI
- Consent from Pollution Control Board
- Permanent registration of Trade Tax
- Registration under Factories Act
- Registration under Shops and Commercial
Establishment Act - NOC from Electrical Safety Directorate
- Trade-tax exemption/deferment
- License from Food Department
- License under Drugs Cosmetics Act
- Excise License (UP)
- Note All of the above may not be necessary for
every unit.
29(No Transcript)
30Impact of Corruption, by Firm Size, 2006
31Tax Payment in India OECD, No. of Payments,
Time Needed, Rate
World Bank 2007a
32Time and cost of contract enforcement
33Time and cost of insolvency proceedings
34CONCLUDING REMARKS
- UP is a sleeping giant, Waking it up is an idea
whose time has come - Industrial And Investment Climate Is
Intrinsically Dependant On Improved Power
Scenario. - For Government it is a responsibility
extraordinary - For Private Sector it is an opportunity
extraordinary - Coincidence of interest makes them natural co
travelers - The challenges highlighted are certainly
surmountable. Reduction In The Number Of
Inspections in a Short span suggests Governments
intent. - An Improved Public Private Dialogue has the
potential for sorting out most of the issues and
Transforming UP into UTTAM PRADESH
35THANKSfor agreeing to be co travelers