Title: Hgsra Island Demonstration Project


1
Högsåra Island Demonstration Project
HISP
  • EWEC2007, Milano, 9th May 2007

Merja Paakkari, Hafmex Windforce Oy
2
Backgrounds
  • Project located on HögsÃ¥ra
    island in Archipelago of SW Finland
  • Active local islanders as pioneers
  • New business possibilities to keep Archipelago
    inhabited and active
  • Utilize local pollution free energy production
  • Finland and EU policy to increase share of
    renewables and domestic production
  • Utilize vast nature reserve of near offshore wind
    conditions with installation on land

3
Why EU project
  • Challenging environment of Archipelago of SW
    Finland
  • Rough terrain
  • Remote site with difficult access - behind two
    ferries
  • Logistics
  • Installation
  • 3. Weak grid
  • No ready solutions available, high risks
  • EU project applied for Spring 2003 HISP
  • Started Spring 2004
  • Project ends Summer 2007

4
Project partners
  • Hafmex Windforce Oy (coordinator), Finland
  • Harakosan Europe BV,
    The Netherlands
  • (3. ABB, Switzerland left the
    consortium Jan. 2006)
  • 4. Roheline Ring, Estonia
  • 5. VTT Technical Research
    Center of Finland

5
Innovation Foundation
  • Counterweight from bedrock by anchors
  • Smaller construction and less material
  • No excavation below ground level
  • Transportation critical as continuous casting
    required

6
Innovation grid connection
  • Connection to 20kV local distribution grid
  • Weak grid
  • power limitations required
  • compensation of reactive power
  • Special turbine/wind park control
  • Generator and Inverter from ABB Finland
  • Special filtering on transformer
  • Close cooperation with grid owner, Fortum

7
Measurements and follow-up
  • Meteorological measurements
  • wind (3 levels), temperature, icing risk
  • Power performance
  • Load measurements on the foundation
  • Wind farm control in weak grid

8
Other aspects
  • Challenging environment
  • Wind conditions studied
  • Nature reservation areas nearby
  • Visual aspects and noise
  • erection on forested island
  • Public acceptance
  • inhabitants and summer tourism
  • local manpower and domestic production
  • Logistics
  • ferry connection
  • sea transportation
  • narrow road through village

9
Conclusions
  • Three 2 MW gearless turbines on Archipelago
  • Partners gain valuable experience on
  • remote conditions
  • weak grid
  • challenging environment
  • new turbine technology
  • test site for further needs
  • EU project a good way to demonstrate high risk
    innovations
  • Next towards FP7 !

10
Lets go up!
www.windforce.fi