Repair Centers, from a Bonders point of view
  • Reported by
  • Salvatore Costa
  • Università di Catania and INFN Sezione di
    Catania

2
General remarks
At the Bonding WG Meeting of 08 June 2004 we
discussed the criteria to send a Module to the
new official Repair Centers, from a Bonders
point of view.
  • General remarks
  • We perceive these centers more as debug places
    where teams of dedicated people study in deeper
    detail Modules with non-trivial problems, so that
    normal production can continue at the usual rate.
  • Strictly speaking, trivial mechanical Module
    bonding failures should not be matter for these
    Centers a) there is nothing to study b) bonding
    centers (operators) are either able to repair
    them right away or, if they cant, then most
    likely the debug centers cant either.
  • To repair damage to APV-PA bonds (typically
    caused by handling accidents), we would like the
    official procedure to be sending Module back to
    the Hyb bonding place.
  • For all other cases, which means a variety of
    electrical misbehaviors that may or may not be
    related to bonding problems, report the problem
    and let the experts at the Center decide if
    they think they want to study that Module
    following the report procedure that will be
    decided here.
  • Criteria in detail
  • Based on type of failure, see next slide ?

3
Criteria in detail
  • Trivial bond failure detected during bonding or
    at post-bonding inspection
  • Wire wont stick
  • Bond pops up (lift off)
  • Foot is misplaced and causes a short somewhere
  • We repair these right away as usual if we can
    and/or list as unbonded the strips that are such
    as a result of the failure or of the repair
    action.
  • Trivial (bond) failure detected during
    post-bonding ARCS or LT tests
  • Pinhole (caused by bonding/handling accident or
    pre-existing and either undetected in Sensor test
    or on untested Sensor)
  • Short (caused by bonding/handling accident or by
    misplaced foot)
  • Open (bond popped up)
  • Same action.
  • Non-trivial electric failure detected with ARCS
    at any (?) stage (pre-bonding, post-bias-pre-reado
    ut-bonding, post-bonding or LT tests which dos
    not exhibit a clear link to bonding
  • Increased LV current
  • Anomalous IV
  • We post the problem for the debug Center to
    consider they ask for the module at their
    discretion.
  • Non-trivial electric failure detected during
    post-bonding ARCS or LT tests, which might be
    traced back to a bonding failure
  • Example pseudo-pinhole At post-bonding ARCS
    test, a PHL- (likely pinhole) is found. We pull
    the readout bond as prescribed for pinholes but
    the test keeps saying PHL-, so the Hyb ch is
    damaged. Since it was OK at ARCS test on arrival
    perhaps we killed it with bonding (seen in some
    TIB centers).
Write a Comment