Title: Twinning Projekt


1
Twinning Projekt
  • Air Quality, chemicals, waste
  • Component 1 Air Quality
  • TR 03-EN-01

Financed by the European Community Contracting
Authority Central Finance and Contracts Unit
(CFCU) in Turkey
2
Institutions in the Project
  • Ministry of Environment and Forestry in Turkey
    (MoEF)
  • Ministry of Health in Turkey (MoH)
  • Refik Saydam Hygienic Center (RSHC)
  • Gölbasi Laboratory (MoEF)

3
Institutions in the project
  • Federal Ministry for Environment, Nature
    Conservation and Nuclear Safety of Germany (BMU)
  • Hamburg Ministry of Science and Health (BWG),
    Institute of Hygiene and Environment (HU)
  • GTZ German Technical Assistance Agency, Eschborn

4
Monitoring Institutions
  • Delegation of the European Commission to Turkey
    (ECD)
  • Central Finance and Contract Unit (CFCU)

5
Aims of the Project
  • Transposition of the Air Quality Framework
    Directive 96/62/EC and the Large Combustion
    Plants Directive 2001/80/EC into Turkish (Draft)
    legislation
  • Draft Agreed Framework Law on Air Quality which
    defines the Roles and the Responsibilities of the
    involved ministries (considering both directives)

6
Aims of the Project
  • Strengthening of the qualification of the
    administration and of the technical structures in
    the administration (Know How Transfer)
    Strengthening of the Quality management and
    preparation of the accreditation of the two
    laboratories - Refik Saydam Hygienic Center
    (RSHC) and Gölbasi
  • Agreed strategic Action Plans on further
    implementation steps of the two directives

7
Methods of cooperation
  • Workshops
  • Seminars
  • Trainings
  • Discussions in smaller working groups
  • Distribution of information material concerning
    the workshops, seminars etc. to the participants

8
Time schedule
  • Start of the project
  • October 2004
  • Duration of the project 24 months
  • End of the project
  • September 2006
  • Closing of the budget November 2006

9
Time schedule
  • Kickoff Meeting 10th and 11th of November 2004
  • Activity 1.1 Air Quality Framework Directive
    6th to 10th of December 2004 including a
    workshop
  • Activity 1.2 Analysis of the corresponding laws
  • Activity 2.1 Large Combustion Plants Directive
    13th to 17th of December 2004 including a
    workshop
  • Activity 2.2 Analysis of the corresponding laws

10
Time Schedule
  • Assistance in drafting an Air Quality Framework
    Law January to September2005 (additional
    assistance till the end of 2005)
  • Strengthening of the capacities in the
    administration January 2004 to July 2006
  • Development of strategic action plans on further
    implementation steps concerning the two
    directives September 2005 to September 2006

11
Some Statistics
  • Over 40 experts who will work in the fields of
    emission, emission inventory, emission
    monitoring, air quality, quality management,
    technical equipment, environmental law will
    assist in this project
  • These experts will spend over 1100 days
  • in Turkey
  • 6 Workpackages with 21 acivities where most of
    the activities are concerned with more than one
    issue