Title: JCA LOGISTICS


1
JCA LOGISTICS
  • Cdr Richard Thompson

2
JCA LOGISTICS TEAM
ALE- AL Ops Lt Cdr Kevin Bugg
ALE - R M Flt Lt Mark Deakin
ALE - JTD Lt David Thomson
ALE - ALIS Flt Lt Andy Gow
From Oct 04
3
ALO Definition
Sqn Ldr Coughlan
ALL
ALL
Sqn Ldr Cottrell
Lt Cdr Flynn
Lt Cdr Stagg
Cdr Thompson
ALL
ALL
ALO Provides Global Support Solution
4
LOGISTICS AI SCHEDULE
CY
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
OED - Operational Employment Dates
JCAProgramme Events
Variant Selection
OED 1
OED 2
OEU Forms
Production Outline Support MOU
Full Support MOU
OED1 - 8 a/c land based capability
OED2 - 8 a/c sea based capability
OED3 - Full Block 4 capability
JSF Programme Events (Logs)
IBR
ASCDR 1
AS PDR
ASCDR 2
AS CDR 3
ITC No 1
Performance Based Contract Go-ahead
First Flight
ALS Stand Up
ALS Operational
AL PDR
Dec 03 - Support System CDR 1
Jan 04 - ALIS PDR
Feb 04 - Training System PDR
Mar 04 - Business Planning CDR/TIM
Apr 04 AL CDR 1
Major Auto Log Design Events Since Last Industry
5
SUPPORT SYSTEMS CDR OUTPUT BEING WORKED BY THE IPT
  • Frequency of Engine Removals.
  • Engine Removals at Sea.
  • Weight Trades with SWAT.
  • PHM Performance.
  • Requirement for Periodic Inspections.
  • LO Restoration.
  • Weapon Loading.
  • CE Markings.
  • Non-Compliance Logistic Footprint KPP.

6
ALIS PDR OUTPUT BEING WORKED BY THE IPT
  • TOP ISSUES
  • ALIS interface with MoD Inventory Management
    System
  • Supported by JPO
  • May require Contract Amendment
  • Security.
  • Safety Criticality of Software.
  • Development of ALIS ConOps for UK
  • Major opportunity for STC to shape the final
    product
  • UK is already 12 months behind other 3 Services!

7
TRAINING PDR OUTPUT BEING WORKED BY THE IPT
  • PPP/PFI - What is acceptable ?
  • LM
  • 2C
  • Joint Training Strategy being developed between
    IPT, 2C both AD(RP) STC.
  • Training Hump - International Training Working
    Group Presentation due 29 Jun 04.
  • Divergence from the ITC Concept.
  • Security.

8
BUSINESS PLANNING CDR/TIM OUTPUT BEING WORKED BY
THE IPT
I. The Government has total responsibility for
all aspects without contracting with the Prime
II. The Government retains program management
responsibilities and maintains a contract with
the Prime for directed tasks
III. The Government retains oversight and
approval authority but has delegated program
management authority to the Prime
IV. The Government maintains insight over most
activities but retains oversight and approval
authority for a limited number of clearly defined
tasks
V. The Government maintains insight over most
activities and exercises oversight on an
exception basis
9
BUSINESS PLANNING CDR/TIM OUTPUT BEING WORKED BY
THE IPT
02
CY2003
CY2004
CY2005
4
1
2
3
4
1
2
3
4
1
2
3
4
3/25
4/13
9/21
3/22
6/21
DAE IPR 1
JSF Milestones
AS CDR 2
AS CDR 3
AS PDR
AS CDR 1
LRIP RFP
Program Reviews
Strategic Integration
Attributes
IEM , trades, financial analysis, integrate
results and ELT Review
Spares Responsibility
Trades
Depot Maintenance
Agreements
Supply Chain Management
AutoLog Operations
Trades
ALIS
Trades
Business Case Maturity
Spiral 1
Spiral 2
Baseline
10
BUSINESS PLANNING CDR/TIM OUTPUT BEING WORKED BY
THE IPT
  • Management of the Spiral Review Process.
  • The Generation of an Organic Modelling Capability
    within the UK.
  • Alignment with the EP Process.
  • Alignment with the STC Basing Study.
  • The Generation of Business Cases for UK Strategic
    Capability
  • Maintenance Repair Upgrade LO Facility
  • ITC
  • National Support Centre
  • Aircraft Storage
  • Software Support

11
EOL PROVISION 6 - AFFORDABLE BEST VALUE
STRATEGIC INFRASTRUCTURE TO DELIVER SUSTAIN JCA
CAPABILITY THROUGHOUT THE LIFE OF THE AIR VEHICLE
  • FUNCTIONAL CAPABILITIES
  • Mission Sensor Support
  • Campaign Planning
  • Supply Chain Management
  • Security
  • Fleet Configuration Management
  • Requirements Management
  • Post Incident Management
  • Information Management/C4I

OPERATIONAL COMMAND
UK INDUSTRY
DLO
UK ENVIRONMENT -DEFENCE INDUSTRIAL POLICY
-LEGISLATION
-INFRASTRUCTURE
  • STRATEGIC REQUIREMENTS
  • MAINTENANCE REPAIR UPGRADE FACILITY
  • LO VERIFICATION FACILITY
  • UK INTEGRATED TRAINING CENTRE
  • NATIONAL SUPPORT CENTRE
  • INTEGRATED MISSION SUPPORT CENTRE
  • A/C STORAGE FACILITY
  • KEY ENABLERS TO SUPPLY CHAIN MANAGEMENT