Bangladesh is experiencing the largest mass poisoning in ... Decentralised energy. Decentralised systems for the supply of electricity are the most appropriate ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 22
Provided by: Ers8
Category:

less

Transcript and Presenter's Notes

Title: Ershad Ullah Khan, MSc


1
  • Ershad Ullah Khan, MSc
  • Process Engineer
  • TPS Termiska Processer AB

2
Arsenic poisoning
  • Bangladesh is experiencing the largest mass
    poisoning in human history, because of arsenic in
    the ground water. Around 80 million Bangladeshis
    may be affected (WHO)

3
Lack of electricity and safe water
  • 80 of the population live in rural areas.
  • Around 70 of them are not connected to the
    national grid electricity.

4
Decentralised energy
  • Decentralised systems for the supply of
    electricity are the most appropriate solutions
    for rural dwellers.

5
The project
  • This project is a pilot investment in Bangladesh
  • Livestock and vegetable waste biogas CHP plant
    integrated with membrane distillation.
  • The purpose is to make both electricity and clean
    water from the same bio energy.

6
Biogas driven engine and membrane distillation
process
  • Distributed power
  • Safe drinking water and
  • Fertilizer
  • all from one input which is manure or vegetable
    waste.

7
Pilot project description
8
Biogas engine from JDEC
  • Small scale electricity production
  • Well proven technology for small scale CHP
  • Biogas can be used directly in the gas engine
  • Heat of exhaust gas is used for ground water
    heating
  • Commercially available
  • Technically and economically feasible

9
Membrane distillation technology (MD)
  • Conventional
  • Membrane distillation
  • Conventional small-scale technologies could not
    remove the arsenic sufficiently
  • Conventional large plants are not feasible for
    small and rural areas

10
Absolutely pure water
  • Bacteria and virus
  • Fertilizers and pesticides
  • Industrial chemicals
  • Arsenic

11
Representative test results
12
Membrane module system
13
Proposed pilot project
  • 26 kWe biogas engine
  • 3 membrane distillation modules
  • Electric efficiency 31
  • Thermal efficiency 40
  • Annual electricity generation 197 MWh (540 kWh/d)
  • Annual water production 456,000 litres (1250 l/d)
  • Equipment life 10-20 yrs

14
Costs per capita electricity and water
  • Specific cost for kWh electricity 0.04 (28
    öre)
  • Specific cost for per liter water 0.015 (11
    öre)

15
Organizational chart
16
Costs of proposed pilot project
  • Installation costs 80700
  • Operation and maintenance 04 years project 8070

17

Economic viability

18
Total budget
  • Equipment and installation costs (demo plant),
    84,000
  • Demo plant operation and maintenance costs,
    8,070/year for 4 years
  • Salary (Project leader Advisor) 162,000/year
    for 4 years
  • Travel per year 4,000 for 4 years
  • Total budget, 780,200

19
Sensitivity analysis
20
Sensitivity analysis
21