Integration of Variable Generation Task Force IVGTF: Status - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Integration of Variable Generation Task Force IVGTF: Status

Description:

Integration of Variable Generation Task Force (IVGTF): Status. Warren Frost (Presented by John Kehler) Chair, IVGTF. NERC Operating & Planning Committee ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 9
Provided by: KarenS123
Category:

less

Transcript and Presenter's Notes

Title: Integration of Variable Generation Task Force IVGTF: Status


1
Integration of Variable Generation Task Force
(IVGTF) Status
  • Warren Frost (Presented by John Kehler)
  • Chair, IVGTF
  • NERC Operating Planning Committee
  • June 4-5, 2008
  • Toronto, Canada

2
IVGTF Scope
  • The Task Force will prepare
  • A concepts document that includes the
    philosophical and technical considerations for
    integrating variable resources
  • Specific recommendations for practices and
    requirements, including reliability standards,
    that cover the planning, operations planning, and
    real-time operating timeframes
  • The document will include
  • Planning timeframe issues, such as contribution
    to capacity margins modeling requirements to test
    system reliability and planning transmission
  • Operational Planning and Real-time operating
    timeframe issues, including forecasting, short
    term adequacy, operator awareness,
    interconnection frequency control, operating
    reserves, and wind power management
  • Review NERC Standards for any gaps
  • Review of future developments including storage
    and other technologies
  • Conclusions and recommendations.

3
IVGTF Status Report
  • With 50 participants, 5 Subgroups formed
  • Introduction
  • Characteristics of Variable Generation
  • Planning and Technical Impact
  • Operational Planning System Operations
  • Other and Future Considerations
  • Leadership Team Drove first Draft (250 pages)

4
IVGTF Status Report
  • First Face-to-Face meeting held
  • Identify consistent themes
  • Focus on the impacts and implications - what
    not the how to
  • Develop key conclusions/recommendations
  • Review comments on each section
  • Identify overlaps and gaps
  • Excellent participation and shared learnings
  • A key observation is technical barriers for large
    scale wind integration can be overcome. The
    challenges are policy and costs.

5
IVGTF Report Key Themes Identified
THEMES
Uncertainty
Transmission
Flexibility
Efficiency and Reliability
Equipment Performance
Introduction Characteristics Planning Operation
s Future
CHAPTERS
Common Thread
Common Thread
Common Thread
Common Thread
Common Thread
6
Examples of the Themes and Common Threads
  • Uncertainty
  • Variable resources lead to uncertainty in time
    frames of minutes from real time operation to
    years away from real-time operation
  • Transmission
  • Planning transmission with variable resources
    connecting to the grid
  • Consideration of planning transmission with the
    potential of large amounts of distribution
    connected generation connecting
  • Flexibility
  • Variable generation will require flexible
    resources
  • Examples of flexibility can be in future
    development of new conventional generators,
    quicker access to generation across the
    interconnection, increasing balancing area size,
    demand side options, storage, etc.
  • Efficiency and Reliability
  • Wind power forecasting for example is one area
    where reliability and efficiency will benefit
  • Equipment Performance
  • Wind power facility equipment standards will
    identify the requirements and performance for
    items such as LVRT and voltage regulation.
  • Decisions made today on equipment performance we
    will live with for the life of that facility

7
IVGTF Next Steps
  • Next Steps include
  • Develop 30-40 page report with key themes
    identifying recommendations
  • Remainder of research will be contained in
    appendix that will provide an excellent reference
    for industry
  • Complete 2nd Draft
  • Send to OC/PC for comment in Sept.

8
Questions?
Write a Comment