Title: Emergency Geo Alert System EGAS


1
Emergency Geo Alert System (EGAS)
Statement of Work (SOW) September 26, 2007
Joseph Cremaldi Robel Embaye Abdurahman
Hussein Daniel Pirkl
2
Background
  • As-Is System Mason Alert
  • Effective but flawed
  • People who are not registered will not receive a
    warning message.
  • To-Be System Emergency Geo Alert System (EGAS)
  • An improved local area cellular detection and
    alert system
  • Doesnt require users registration
  • Geo-targets warning messages to a specific area

3
Emergency Geo Alert System
Carrier B
Carrier A
Carrier C
George Mason University
Wireless Detection
Alert System
Email
Email
EGAS
4
SOW Objective
  • To provide guidelines in determination of a
    system that will geo-target alert messages to
    wireless devices on campus. The system will
    replace or improve the current GMU alert system
    by providing additional functionality.

5
Scope
  • The contractor shall
  • Develop specifications for
  • Program Management
  • System Management
  • Design, Implementation, and Test
  • Maintenance and Security
  • Adhere to standards
  • Provide timely documentation and information

6
Tasks
  • The contractor shall perform the following tasks
  • Program Management
  • System Management
  • Design
  • Implementation
  • Testing
  • Maintenance and Training
  • Security and Compliance
  • Documentation

7
Program Management
  • Contractor shall anoint a program manager who
  • Provides communication between functions
  • Is the single point of contact for GMU
  • Provides clear and quick responses about project
    questions and requests
  • Develops the following requirements
  • Program control requirements
  • Staff requirements
  • Cost requirements
  • Schedule requirements
  • Risk requirements
  • Other as-needed requirements

8
System Management
  • The System Management shall
  • Develop the system requirements for EGAS
  • Deliver a robust, secure, testable, maintainable,
    legal, and technically achievable
    telecommunication alert system
  • Work across functions to provide communication
    and system guidance.

9
Design, Implementation, and Testing
  • Design
  • Shall satisfy the specifications as defined by
    the system requirements
  • Implementation
  • The system shall be implemented upon design
    completion
  • EGAS shall interface with the existing Mason
    Alert System
  • Testing
  • Unit Testing
  • Component Testing
  • System Testing

10
Maintenance and Training
  • Maintenance Plan shall ensure system
    functionality and readiness.
  • System training shall provide site training to
    GMU system personal.

11
Security and Compliance
  • Security shall be of highest priority throughout
    the design to ensure the integrity of the system.
  • Security shall not be compensated for when making
    trade-off decisions without the sought after
    permission from GMU
  • All communications shall abide by FCC standards

12
Documentation
  • The contractor shall provide thorough system
    documentation

13
Period of Performance
  • The work shall be conducted in the period of 12
    months after the award date. All tasks shall be
    performed and completed by the dates described
    under the required deliverables.

14
Deliverables