PIPETRAK Pipeline Construction Management Software - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

PIPETRAK Pipeline Construction Management Software

Description:

Centerline Weld Survey (pipeline is surveyed as it goes in the ditch) ... Drill-downs on each welder indicate root cause of welding issues ... – PowerPoint PPT presentation

Number of Views:410
Avg rating:5.0/5.0
Slides: 21
Provided by: petroita
Category:

less

Transcript and Presenter's Notes

Title: PIPETRAK Pipeline Construction Management Software


1
PIPETRAKPipeline Construction Management Software
February 2008
2
PipeTrak
  • Construction Management Software (CMS)
  • Pipe and Activity Tracking - tracks pipe from the
    mill to the site thru to commissioning
  • Progress Reporting daily progress reporting of
    all activities
  • Quality Assurance nightly turn-around of
    validation, deviation and issue reports
  • Document Management all activities, as-builts,
    processes and procedures are documented

3
PipeTrak
  • Reduces risks and costs of pipeline construction
    through
  • Accurate Tracking and Management of Materials
    from the Mill to the Site to Commissioning
    (supports on-site material management and
    efficient crew mobilization for multiple sites)
  • Nightly Validation Of Field Generated Data
    Against Design Rules and Deviation Criteria
    (supports timely resolution of construction
    issues)
  • Accurate Monitoring of Resources and Activity
    Progress (supports efficient billing and issues
    resolution)

4
PipeTrak
  • Reduces risks and costs of pipeline construction
    through
  • Site Available Electronic Document Management
    System (supports Q\A process and use of correct
    procedures, specifications, and qualifications
    for each activity)
  • Improved Coordination and Communication (web
    based system allows authorized users to review
    progress and issues from any internet available
    location)
  • Centerline Weld Survey (pipeline is surveyed as
    it goes in the ditch)
  • Near Real-Time Project Documentation
    (Deliverables are configured for your EDMS/GIS
    Post-Commission Documentation and Issues
    Resolution work is substantially reduced)

5
PipeTrak
Experience (sample of past projects)
6
(No Transcript)
7
PipeTrak
Deployment Architecture (System Provided by
PetroIT)
Daily Inspection Reports
Spread 2
Spread 1
8
PipeTrak
  • Typical Project
  • Mobilization Phase
  • Define Project Plan, Expectations and
    Requirements (team)
  • Define Roles and Communication Protocols (team)
  • Define Work-Flow and Data Requirements (templates
    are available)
  • Define Q\A and Deviation Criteria (templates are
    available)
  • Configure and Deploy Hardware and Software
    (PetroIT)
  • User Training (PetroIT)
  • Construction Phase
  • Daily Data Collection and Validation (PetroIT)
  • Progress and Issues Reporting and Resolution
    (Client)
  • Demobilization Phase
  • Final Documentation Hand-Over to Client (PetroIT)

9
PIPETRAKPipeline Construction Management
SoftwareOverview
10
PipeTrakPipe Tracking The Pipe
11
PipeTrakActivity Input\Reports - Welding
Daily construction activity is captured on
reports or by field computers and validated as
data is integrated into the database.
Drill-Downs from the on-screen grid of validated
and integrated data link to these reports and
documents
12
PipeTrakPipe Book All Activities
13
PipeTrakReporting - Progress
Progress is tracked and reported through tabular
and graphical reports
14
PipeTrakReporting Progress
15
PipeTrakReporting Issues
Clicking on any colored tile links to document
supporting issue
Monitor chart provides visual of issues
16
PipeTrakReporting Quality Assurance - Welding
Welder Performance report details the
accept\reject rates of each welder
17
PipeTrakQuality Assurance Deviation Reports
Daily compliance reports support Q\A and quick
resolution of issues
18
PipeTrakGIS View
A GIS view provides an interactive means for
viewing and analyzing daily activity
19
PipeTrakEDMS
Engineering and Planning documentation is
maintained as part of the EDMS module.
20
PIPETRAKPipeline Construction Management Software
Software Demonstration