Title: MEGATON MODULAR MULTIPURPOSE NEUTRINO DETECTOR


1
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Education / Experience
? Chamber Design
? Modular Configuration
? Chamber Time Line Estimate
? Chamber Cost Estimate
November 2007
Mark A. Laurenti
2
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark Laurenti
  • Education
  • BS Mine Engineering (SDSMT 1983)
  • MBA (University of SD 2001)
  • Homestake (1983 2001)
  • Shaftman
  • Contract Miner
  • Mine Engineer Underground
  • Mine Foreman Underground
  • Chief Engineer Underground
  • Chief Engineer Surface
  • Technical Services Superintendent
  • Vulcan Materials (2001 Present)
  • Underground Project Design Construction
    Manager
  • Underground Plant Manager
  • McCook Reservoir (TARP) Project Manager

Mark A. Laurenti
November 2007
3
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Design
Controlled Blasting in Chamber
Could use Instrumented Cables for Engineering /
Geotechnical Study
Mark A. Laurenti
November 2007
4
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Design
Note ! 3 Chambers Drilled in Costing
Mark A. Laurenti
November 2007
5
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Modular Configuration
Mark A. Laurenti
November 2007
6
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Modular Configuration
Mark A. Laurenti
March 2007
7
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Time Line Estimate
General Parameters
Mark A. Laurenti
November 2007
8
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
? Chamber Time Line Estimate
3 Chambers drilled
6 Chambers Accessed
1 Chambers Mined
Design (3) 7 Months Site Set up (6) 9
Months Excavate Chamber (1) 61 months
Mark A. Laurenti
November 2007
9
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark A. Laurenti
November 2007
10
MEGATON MODULAR MULTI-PURPOSE NEUTRINO DETECTOR
Mark A. Laurenti
November 2007