The Millau Viaduct Deck Launch. Paul Eliasson. Brian Follweiler ... Temporary piers used to help launch and support the deck as the the pylons were constructed. ... – PowerPoint PPT presentation

Number of Views:426
Avg rating:3.0/5.0
Slides: 12
Provided by: sammysa
Learn more at: https://www.ce.jhu.edu
Category:

less

Transcript and Presenter's Notes

Title: Construction%20Innovation:%20The%20Millau%20Viaduct%20Deck%20Launch


1
(No Transcript)
2
Construction InnovationThe Millau Viaduct Deck
Launch
  • Paul Eliasson
  • Brian Follweiler

3
The Millau Viaduct
  • Recently completed Cable-Stayed bridge in
    Southern France.
  • Built to span the plateaus of the Tarn Valley.
  • Boasts the highest bridge pylons in the world.
    The deck rises 1,125 ft above the ground.

4
(No Transcript)
5
Construction Overview
  • Temporary piers used to help launch and support
    the deck as the the pylons were constructed.
  • The 2460m deck was launched in two pieces.
  • Pylons and cables were added on top of the piers.

6
Deck Launching
  • 7 temporary piers help support the weight of the
    deck.
  • 2 deck segments are launched from the each end of
    the bridge.

7
Hydraulic Launchers
  • Computerized launchers push the pre-fabricated
    deck segments onto the piers.
  • Each cycle moves the deck 600mm. Total of 5000
    cycles required.

8
Nose Recovery
  • Weight of steel box-girder deck sags as span is
    completed.
  • Nose recovery system attached to raise the deck
    to the level of the next pier.

9
Completion
  • Two deck segments joined in May of 2004.
  • Opened to traffic on December 16, 2004. This new
    route shaves 60km off the Paris-Barcelona route.

10
(No Transcript)
11
(No Transcript)