Title: Mission Trip Orientation
1Mission Trip Orientation
2Sunday
- Plan to leave CBC at 600 AM for the drive to El
Paso - The drive will take approximately 13 hours,
making your arrival time around 600 PM - You will see a lot of I-10 along the way
3(No Transcript)
4Sunday
When you get to El Paso, you will be closer to
San Diego than you are to Houston..
5by about 25 miles.
6Sunday
- You will stay at an El Paso church overnight
7(No Transcript)
8Monday
- And get up very early the next morning
9(No Transcript)
10Monday
- After an early breakfast, youll go to meet your
Casas por Cristo rep at their office
11(No Transcript)
12Meeting with Casas rep
13(No Transcript)
14Monday
- After a quick meeting, youll load up and follow
the Casas rep across the border into Juarez -
15Thats the F2F trailer
16(No Transcript)
17Monday
- Youll go to the Casas warehouse and load the
tool kit used to build the house
18Casas warehouse
19(No Transcript)
20Monday
- After dropping off your luggage-bins and supplies
at the church in Juarez, youll head to the
jobsite
21Monday
- And this is when the work begins
22Framing for the foundation
23(No Transcript)
24(No Transcript)
25Checking it for square
26Monday
- then digging the trench for the perimeter beam
of the foundation.
27The ground is usually sandy
28(No Transcript)
29(No Transcript)
30The results from all that digging
31Monday
- Work continues with measuring and cutting the
lumber for the wall sections and roof panels
32Measure twice
33cut once.
34(No Transcript)
35(No Transcript)
36(No Transcript)
37Monday
- When the concrete truck arrives, youll pour the
slab
38(No Transcript)
39Monday
- Directly into the form if the truck can get
close
40(No Transcript)
41Monday
- youll be lifting the wheelbarrow if it cant
42its not too heavy.
43(No Transcript)
44Monday
- Youll screed, float and smooth as youre pouring
the slab
45Thats a screed
46(No Transcript)
47(No Transcript)
48(No Transcript)
49and thats a float.
50Monday
While the slab cures, everyone keeps busy
51cutting chicken wire
52(No Transcript)
53(No Transcript)
54Monday
- and framing the walls and roof sections
55framing the walls
56(No Transcript)
57with openings for doors
58(No Transcript)
59(No Transcript)
60(No Transcript)
61(No Transcript)
62and windows.
63Monday
64(No Transcript)
65(No Transcript)
66Monday
67(No Transcript)
68(No Transcript)
69Monday
- Later in the day, after the slab has cured, it
will be floated smooth one more time
70Did you notice theyre wearing knee pads?
71We forgot to tell them about the knee padssorry
guys.
72Monday
PREPARE FOUNDATION
FRAME ROOF PANELS
POUR CONCRETE
CUT CHICKEN WIRE
CUT LUMBER
CUT INSULATION
FRAME WALL PANELS
SMOOTH FOUNDATION
73Tuesday
- Day two starts with assembling the wall sections
and lifting them on to the foundation
74This is two wall sections being joined together
with a piece of 2x4 called a top-plate.
75Another look at that top-plate
76Lifting the walls
77(No Transcript)
78(No Transcript)
79(No Transcript)
80(No Transcript)
81and nailing them in place.
82(No Transcript)
83Tuesday
Keep at work installing windows
84(No Transcript)
85Each house gets two windows.
86(No Transcript)
87Tuesday
- and installing blackboard
88The blackboard provides a moisture-resistant
backing for the stucco.
89(No Transcript)
90(No Transcript)
91(No Transcript)
92(No Transcript)
93Tuesday
- installing outlet boxes and running electrical
wiring
94(No Transcript)
95(No Transcript)
96(No Transcript)
97Tuesday
98(No Transcript)
99Did you notice the temporary bracing?
100Thats the trim for the windows and door. Youll
re-use it later.
101(No Transcript)
102Tuesday
- Sifting the sand for the stucco is like a day at
the beach
103(No Transcript)
104(No Transcript)
105sort of.
106(No Transcript)
107Tuesday
- Next up is installing the chicken wire
108or poultry netting if you prefer.
109(No Transcript)
110(No Transcript)
111You stretch it tight and nail it in place.
112(No Transcript)
113(No Transcript)
114(No Transcript)
115Tuesday
Moving the roof panels to the house is next and
its a BIG job
116(No Transcript)
117(No Transcript)
118(No Transcript)
119(No Transcript)
120Tuesday
And once you get them in place, you lift them
onto the house
121(No Transcript)
122(No Transcript)
123(No Transcript)
124(No Transcript)
125(No Transcript)
126Everybody lift on 3...
127(Theres two people inside to catch the roof
panels.)
128Tuesday
Now that the roof panels are in place, the
decking and roofing go up and on
129Decking goes down first
130(No Transcript)
131(No Transcript)
132Then the tar-paper and the roofing material.
133Tuesday
Next up is drywall for the ceiling and installing
the roof soffit
134(No Transcript)
135(No Transcript)
136(No Transcript)
137Tuesday
WOW! What a busy day! This morning there was
just a piece of concrete, and now there is a
house with walls and windows and a roof. You
have a lot of work tomorrow, but youll finish it
in no time.
ASSEMBLE WALLS
INSTALL INSULATION
LIFT WALLS ON SLAB
SIFT SAND FOR STUCCO
INSTALL WINDOWS
INSTALL CHICKEN WIRE
INSTALL BLACKBOARD
MOVE AND LIFT ROOF
INSTALL ROOFING
ELECTRICAL BOXES
DRYWALL CEILING
INSTALL WIRING
138Wednesday
Day three starts off with mixing the stucco.
139Stucco is a mix of sand, cement and lime.
140Loaded into a mixer
141by hand from buckets.
142Wednesday
Then you get it on the walls.
143Listen carefullyits important to do this right.
144The stucco goes from the mixer to the wheelbarrow
145to the wall.
146(No Transcript)
147(No Transcript)
148Wednesday
The stucco gets finished by texturing it with a
soft trowel.
149(No Transcript)
150and youre done.
151Wednesday
- While the stucco is going on the walls outside
- the drywall is going on the walls inside
152The ceiling was done yesterday, so just walls
today.
153(No Transcript)
154(No Transcript)
155(No Transcript)
156Wednesday
You finish up with a ceiling fan, light fixture
and wall plates inside, an exterior door and
lockset and a light fixture outside
157(No Transcript)
158(No Transcript)
159Wednesday
If its hot enough (August trip), the stucco will
dry enough in a few hours and you can paint the
house
160(No Transcript)
161(No Transcript)
162(No Transcript)
163Wednesday
if not (Winter and Spring trip), the stucco
probably wont be dry enough to paint
164so you can stand on the roof instead.
165Wednesday
Finally, after 3-days of hard work, you dedicate
the house and give this family their home
166(No Transcript)
167(No Transcript)
168Wednesday
The last part of the dedication is driving the
final two nails, and placing the Casas por Cristo
plaque on the roof, declaring this to be a house
from Christ
169(No Transcript)
170(No Transcript)
171(No Transcript)
172(No Transcript)
173(No Transcript)
174(No Transcript)
175(No Transcript)
176(No Transcript)
177(No Transcript)
178Wednesday
After the home is complete, you will have a
chance to sit down and hear about the history of
Casas por Cristo
179(No Transcript)
180(No Transcript)
181Wednesday
After cleaning the church, youll get lunch in
Juarez, and cross the border back to El Paso
182(No Transcript)
183(No Transcript)
184(No Transcript)
185Wednesday
and meet at the Casas office to buy t-shirts and
souvenirs
186(No Transcript)
187(No Transcript)
188Wednesday
a quick dinner and one more night in the El Paso
church
189(No Transcript)
190(No Transcript)
191Wednesday
and youre ready for 12 hours of I-10
192(No Transcript)
193(No Transcript)
194(No Transcript)
195(No Transcript)