Ground Support Unit - PowerPoint PPT Presentation

About This Presentation
Title:

Ground Support Unit

Description:

Performance ratings will be entered into EATIS ... Other personal equipment (R.V.'s, Campers, Etc.) are the discretion of the Incident ... – PowerPoint PPT presentation

Number of Views:16
Avg rating:3.0/5.0
Slides: 14
Provided by: FSDefau8
Category:
Tags: ground | ratings | sign | support | unit

less

Transcript and Presenter's Notes

Title: Ground Support Unit


1
Ground Support Unit
2
  • Serco Update
  • Serco contractors do not leave R-5
  • Serco work hours-
  • Minimum 14 Hrs
  • Maximum 16 Hrs
  • Parts ordering done by D.G.R.
  • Ordered through normal procedures
  • D.G.R. (Designated Government Rep.) Training in
    place
  • Contract with Serco is bid on current shop rate
  • Serco can work on all incident equipment, not
    just Region 5
  • They do not work on air brakes
  • If on a non FS Incident, there are 2 strike teams
  • Of F.S. Engines, Serco will be ordered

3
  • A list of non-compliance issues, a DGR list, and
    incident support portions of the Contract will be
    posted on the NLW.Website
  • Ordering for Serco is done by the Host Forest,
    the COR is notified, then he/she will order the
    DGR through the Dispatch System. Closest forces
    DGR will be used. O numbers are used for Serco
    and DGR
  • Questions on F.S.
  • Questions on EIRS Trailer availability will be
    followed upon

4
EATIS (Dick Reynolds)
5
  • Contracting Staff sets rates based on industry
    standards
  • EATIS provides a standard database,
  • USFS R-6 had pilot program, R-5, R-1 will
    participate this year (2006)
  • Specifications and best value criteria have been
    written for Engines, Tenders and Busses. Dozers
    are next along with excavators for 2007
  • GS unit will have oversight on performance
    ratings. Tactical equipment is Operations
    Responsibility
  • Performance ratings will be entered into EATIS

6
  • In 2006, all equipment will get performance
    ratings-toilets to tenders
  • R-6 has performance data available. Vendors are
    aware of requirement. Form I-224 rating will be
    used for now for ratings form until new forms are
    developed for 2007
  • Best value criteria is based on a point system
    set by the ICS type (For WTs), and GVW. Spray
    bar configuration is also criteria
  • EATIS vendor cirteria is based on equipment
    location by zip code. Best value will be tabled
    in ROSS in 2007. No more rotations for
    equipment.
  • There is a possibility that EERA vendors will be
    eliminated from the system

7
  • DAV set-asides will be included and have a BV
    table of their own, and will be first out
  • Dispatch centers will have tables for activation
  • GS Unit needs to be aware of what equipment is
    signed up on Incident. For Demob it is the IMTs
    choice on what equipment to release.
  • Question on using tribal equipment not in EATIS
    database. IMTs will be made the choice.
  • All equipment will have a pre-season inspection,
    as well as pre-use. Info is put into EATIS
    database. Buses will use current USDOT
    inspections.
  • All equipment in EATIS will be I.D. by Vin number

8
  • Solicitations this year in R-1 and R-5 will be on
    one-year increments. Next year will be on a
    3-year solicitation
  • Operators need to be qualified
  • Non-Federal cooperators do not need to be in
    EATIS.
  • Question on Dozer/Transport Best value issue.
    This is still being figured out.

9
  • AD driving policies
  • New FS Draft Policy
  • Put on NLW Website
  • Have local units establish policies and have in
    place for IMTs
  • Rental vehicle management
  • Think Ahead

10
New Items
11
  • R-4 Signing Policy
  • 8 sets of signs for GBK
  • Develop contents of sign kit
  • 20 empty sand bags
  • Fire Acitivity Ahead 4 ea/2 Sets
  • Incident Base 6 ea with changeable arrows
  • Helibase 4 ea
  • Fire Traffic Entering Highway 2 ea
  • Drop Point 10 ea with 2 sets of 1-10
  • Incident Sign Mgmt Book 6 ea
  • MUTCD handbook 1 ea
  • All signs to be placed on tripods
  • Extra Velcro
  • Sign sources Dickey Sign and Safety Co.

12
  • AD Personnel using personal vehicles
  • Paid for mileage only, not daily rate
  • Other personal equipment (R.V.s, Campers, Etc.)
    are the discretion of the Incident

13
BIN ITEMS
  • (1) Development of Contract Administration Skills
  • (a) Cost of Training
  • (b) Knowledge of Contracts
  • (c) How to keep up currency
  • (2) Keeping Ads current and available. Address
    authority of ADs to act as COR
  • (3) Develop a Contract for Administration for
    IMTs Session
Write a Comment
User Comments (0)
About PowerShow.com