Data Comm. Infrastructure
  • CDF
  • FCC1 Acquiring materials to connect 16 new 1U
    nodes for the CAF Farm arriving this month.
  • D0
  • Ran three 50' UTP trunk cables for 32 PCs to be
    put on the CDF switch temporarily.
  • MESON Cryo Project
  • Last week we completed the project to install
    tubecable and multimode ABF from the EATC
    building to various areas in Meson including the
    MDB, PK076, Meson Cryo and MS4.
  • Some labeling and documenting is yet to be done.
    Basically ready for installation of new remote
    hubs with DCN.

2
Data Comm. Infrastructure
  • VIDEO CONFERENCING
  • CDF/B0 Theater Conference Room Testing of codec,
    cameras and projector at B0 done Monday.
  • WH6NW Farnsworth Computing will install two new
    monitors and codec. DCI will install the cabling
    and connections.
  • Waiting to hear back from DOE on the WH6E and
    John Cooper on WH8x conference rooms.
  • WILSON HALL
  • WH8FC Planning for the installation of overhead
    fiber tray for Fibrmax 900um crossconnect
    patching.
  • WH3NE Conf. Room Setup temporary switch and
    connections for Lattice QCD Software workshop
    tomorrow.

3
Data Comm. Infrastructure
  • FEYNMAN CENTER
  • FCC-Mezz. Area
  • Project to install a permanent fiber
    infrastructure is on hold. Weve planned for a
    flexible ABF installation that would let us
    connect to both the FCC1 and 2 zoned cabling
    systems.
  • FCC1 2 Computer Rooms Zoned Cabling
  • Plan to increase CAT5e capacity by reusing the
    existing serial console trunks with new 1000BASET
    panels.
  • Also adding more fiber trunk capacity to zones
    where its most needed.
  • FRR2728 clean out
  • Have begun the phased removal of inter-building
    legacy fiber connections from these racks into
    the FCC Fibrmax crossconnect system on FCC2.

4
Data Comm. Infrastructure
  • FCC to Caseys Pond Fiber
  • Completed patching a fiber link for analog water
    flow control.
  • ADMIN
  • Finished a 1st draft of the DCI web page with
    links to copper and fiber cable assembly
    technotes, racking specifications and vendor
    contact information. CD webmeister is going to
    provide a suitable link to it.
  • OFFSITE SERVICES
  • Kautz Road Buildout
  • Technical specificaion for the RFQ is near
    completion. We have conduit locations details
    from FESS. Met with the BD to get the exact dark
    fiber assignments to MI-60.
  • 1550nm OTDR module requisition with CCF Dept.
    Head.

5