Supplier Verification of Purchased Product SVPP - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Supplier Verification of Purchased Product SVPP

Description:

To prevent poor quality components being integrated into the plant. ... Samples that do not meet the requirements will have to be resubmitted. Page 9. IRCR SQA ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 13
Provided by: Empl228
Category:

less

Transcript and Presenter's Notes

Title: Supplier Verification of Purchased Product SVPP


1
Supplier Verification of Purchased Product (SVPP)
2
Why component Approval?
  • To prevent poor quality components being
    integrated into the plant.
  • To ensure that expected quality levels are known
    and understood by the supplier.
  • To guarantee that processes are set-up
    effectively and to gain confidence in the
    controls which are put in place.
  • This is a preventative process which ensures
    that components are fit for the applications we
    are using them for and that the supplier is
    capable of producing the required level of
    quality.

3
The SVPP process
  • This is a new process which will be used by IR
    Unicov and all Thermo King plants to approve
    supplier components for use in Production.
  • This process is applicable to any supplier of
    components to IR Unicov production facility
    regardless if they are custom fabricated parts or
    off-the-shelf items.
  • Supplier ownership of the conformity and quality
    to IR standards is vital to our efforts in
    building top quality Industrial and climate
    control equipment.

4
When will this process be used?
  • When a new component is being integrated into the
    plant.(Each facility will have to approve the new
    component).
  • When an existing component is going to be
    manufactured by a new supplier.
  • When the existing supplier has changed any
    process significantly (e.g. part to be
    manufactured in a new facility, on a new machine,
    a new sub-supplier etc.).
  • A new tool or mould is used.
  • When a component has had a revision change.

5
Sub-Suppliers
  • The Supplier is responsible for the quality of
    parts manufactured/assembled specifically for
    IRCR, Thermo King AND for those
    components/sub-components provided by
    sub-suppliers in any finished assembly.
  • It is IRCR expectation that Suppliers shall
    assume all responsibility and accountability of
    managing their sub-suppliers for quality,
    delivery and performance in meeting IRCRs
    specified requirements.
  • The Supplier shall obtain any necessary
    documentation from their sub-supplier that is
    required to complete the SVPP Report.
  • SVPP reports are to be sent by the Supplier only,
    not by the sub-supplier.

6
Main Requirements
  • All new components will require the following.
  • IRCR Part submission warrant.
  • A Master Sample for the plants using the
    component.
  • Dimensional Report
  • Any material performance and durability tests as
    required by the IR spec.
  • Control Plan.(For basic items such as spacers,
    foam blocks and other other non precision items
    overall control plan will suffice)
  • In addition to the above critical components we
    may require the following for precision items
  • Process Capability Study
  • Appearance Report.
  • FMEA
  • Process Flow Diagram.
  • Supplier Design Records.

7
Part submission Warrant
This document must be supplied by all suppliers
irrespective of their own approval systems.
8
Dimensional Report
Characteristic specifications and tolerances from
drawing or specifications.
1 samples must be submitted for Industrial
Solution
5 samples must be submitted for TK project
Note Samples that do not meet the requirements
will have to be resubmitted.
9
Other documentation
  • AIAG documentation is to be used as a guideline
    for control plans, FMEAs etc..
  • These can be easily sourced on www.aiag.org.
  • In the event that supplier may have existing
    formats of documentation which cover this then
    they may use this if they convey sufficiently the
    requirements for approval of the part.

10
Process consideration
  • Supplier must possess measurement equipment to
    support the measurement of key component
    characteristics.
  • Some suppliers have been informed of this new
    process by letter.
  • Any non-conformances to the specifications must
    be corrected prior to shipment unless prior
    approval to ship (Material Deviation
    Authorization (Concession)) has been received
    from the plant Buyer/Planner, ECN Controller or
    Plant Quality.
  • Requests to change a drawing must be made in
    advance of a submittal in writing.

11
Where to get this supplier information?
  • All information and reports are on www.IRCR.cz
  • This also includes a detailed work instruction
    for suppliers which describes how to prepare
    documentation and parts for approval.
  • Letters of introduction have already been sent
    out to some suppliers. This letter can also be
    seen on the IRCR Internet pages.

12
Controls and measures on the process
  • New part numbers supplied which are not
    approved. Comparing receipts against part
    numbers on the lotus notes database (SVPP data
    base of documentation).
  • Parts supplied from unapproved sources.
  • Parts awaiting full approval.