WG3 Presentation to SC4 Closing Plenary - PowerPoint PPT Presentation

1 / 39
About This Presentation
Title:

WG3 Presentation to SC4 Closing Plenary

Description:

ISO TC184/SC4/WG3 Myrtle Beach N006 2002-03-01 2. WG3 Schedule ... Amendment to 10303-42 accepted to add involute curve and swept disk solid. ISO. TC 184/SC4 ... – PowerPoint PPT presentation

Number of Views:44
Avg rating:3.0/5.0
Slides: 40
Provided by: gerald91
Category:

less

Transcript and Presenter's Notes

Title: WG3 Presentation to SC4 Closing Plenary


1
WG3 Presentationto SC4 Closing Plenary
  • Gerald Radack, Convenor
  • Myrtle Beach, SC, USA
  • 2002-03-01
  • 0800 - 1000

2
WG3 Schedule for Stockholm (1/2)
  • WG3 plenaries
  • Monday 1030 - 1130
  • Thursday 1530 - 1700
  • Publishing standards using HTML and XML (joint
    with QC)
  • Tuesday 0800 - 1000

3
WG3 Schedule for Stockholm (2/2)
4
Plenary SessionMonday 1030 1130
  • Introductions / Note taker / Agenda / Attendance
    list
  • Project briefings
  • Advance SC4 resolutions
  • Items from PPC Conveners meeting
  • Items from QC Conveners meeting
  • WG3 procedures
  • Updates on team plans for the week
  • Other business

5
Team Leaders MeetingMonday 1130 1200
  • Introductions / Note taker / Agenda / Attendance
    list
  • Administrative items
  • Updates to project schedules
  • Team missions and project assignments
  • Team scheduling and coordination issues
  • Joint meeting requirements
  • Round table
  • Other business

6
HTML and XMLTuesday 0800 1000
  • Requirements for XML guidelines
  • Plan of action for XML guidelines

7
Plenary SessionThursday 1300 1500
  • Introductions / Note taker / Agenda / Attendance
    list
  • Results of sessions
  • Publishing Standards Using HTML and XML
  • Test cases guidelines
  • Review last-day SC4 resolutions
  • Schedule for future meetings
  • Project status updates and announcements
  • Open Technical Forum topics
  • Team reports
  • Action items
  • Other business

8
Materials Databases (1/3)
  • WG3/T4 and WG3/T9 have noted with concern an
    outcome of the VAMAS TWA-10 meeting held in
    February 2001, as reported in the VAMAS Bulleting
    no 24 of November 2001. The report states that
    MatMl is recognised as the kernel of Generic
    Platform of materials database.

9
Materials Databases (2/3)
  • WG3 supports the views of T4 and T9 that the SC4
    should communicate this concern to the VAMAS
    Steering Committee. The de jure standards
    produced by ISO TC184/SC4 can also be used for
    the representation of materials data and their
    use for this purpose would provide continuity and
    integration with design and manufacturing
    systems.

10
Materials Databases (3/3)
  • WG3 recommends that SC4 requests that the VAMAS
    TWA-10 should discuss these matters with
    representatives of ISO TC184/SC4 as soon as
    possible.

11
WG3 Teams
  • T01 Shape Representation Ray Goult
  • T04 Materials Anna Moreno
  • T08 Product Life Cycle John Dunford
  • T09 Engineering Analysis Keith Hunten
  • T19 Mechanical Products OPEN
  • T20 Process Plant Mark Palmer
  • T21 Oil and Gas Nils Sandsmark
  • T22 Building and Construction W. Haas
  • T23 Ships Jim Mays, Tony Fry
  • T24 Manufacturing Martin Hardwick

12
T1 Shape Representation
  • Accomplishments in Myrtle Beach
  • Defined scope of new AIC for swept solids as
    required for piping and wiring
  • Discussed PWI proposal for addition of analytic
    geometry to STEP
  • Amendment to 10303-42 accepted to add involute
    curve and swept disk solid

13
T1 Shape Representation
  • Plans between now and Stockholm
  • Draft of new AIC to be produced
  • Draft amendment to 10303-42 to be written
  • 10303-204 FDIS ballot to be completed

14
T1 Shape Representation
  • Plans for Stockholm
  • Analytic geometry PWI discussions (with T12
    Parametrics)
  • Resolve ballot comments on 10303-521
  • Final review of new swept solid AIC
  • Review results of FDIS ballot on 10303-204
  • Review 10303-42 edition 2 DAM
  • IAI geometry harmonisation (with T22)

15
T04 Materials
  • Accomplishments in Myrtle Beach (1/2)
  • ISO10303-235 Materials properties
  • Continued development of ARM
  • Joint meeting with T09
  • Agreed development required before Stockholm
  • MatML
  • Held discussions with Chairman of MatML steering
    committee
  • Identified possible cooperation and interaction
    with 10303-235

16
T04 Materials
  • Accomplishments in Myrtle Beach (2/2)
  • SC4 standards for CASCADE
  • Reviewed LCA software and information
    requirements
  • Reviewed project plan
  • Clarified the roles of the SC4 standards

17
T04 Materials
  • Plans between now and Stockholm (1/2)
  • 10303-235 Materials properties
  • Complete development of ARM
  • Start interpretation
  • Provide document for review for CD
  • MatML
  • Establish relationship with Steering Committee
  • Provide information on SC4 standards

18
T04 Materials
  • Plans between now and Stockholm (2/2)
  • VAMAS Liaison
  • Provide strong recommendation on the use of SC4
    standards for materials databases
  • Attend meeting of VAMAS in May
  • Liaison with ISO TC207
  • Provide strong recommendation through CASCADE
    partners for use of SC4 standards
  • Liaison with ISOTC29/WG34
  • Attend meeting and report on developments in SC4
  • Contribute to development of ISO 13399

19
T04 Materials
  • Plans for Stockholm
  • 10303-235 Materials properties
  • Continue development and resolve issues
  • Review and edit document
  • Joint meeting with T09
  • VAMAS Liaison
  • Report on outcomes of meeting
  • Develop actions to respond to outcomes
  • MatML
  • Report on results of contacts and determine
    policy for continuing activities.

20
T08 Product Life Cycle
  • Accomplishments in Myrtle Beach (1/2)
  • PLCS
  • Committed PLCS to be a modular AP
  • Worked with PDES, Inc. EACM, AP 221, AP 233, AP
    203 Ed 2 on common approach to resolution of PDM
    modules ballot comments
  • PDM modules must
  • Protect investment in harmonization of current
    APs
  • Provide foundation for new modular APs
  • Worked with WG12 and Change Management to
  • Clarify use of extensible selects from EXPRESS 2
  • Open options for use of reference data by STEP
    APs

21
T08 Product Life Cycle
  • Accomplishments in Myrtle Beach (2/2)
  • 10303-233
  • Reviewed and updated AP scope statement and AAM
  • Progressed AP 233 issue log and process.
  • Liased with PLCS, EFWIG
  • Presentation from Volvo on analysis link to
    System Engineering
  • Agreed to group modules for future ISO validating
    process
  • Data Representations
  • Risk Analysis
  • Scheduling
  • Cost
  • Text-Based Requirements
  • Property-Based Requirements
  • Structural Representation
  • Behavioural Models

22
T08 Product Life Cycle
  • Plans between now and Stockholm (1/2)
  • PLCS
  • Work with PDES, Inc. to complete PDM modules
  • Deliver initial PLCS modules for ballot
  • Work Management
  • Behaviour, States and properties
  • Support Integration and Environment

23
T08 Product Life Cycle
  • Plans between now and Stockholm (2/2)
  • 10303-233
  • Review Text-Based Requirements ARM with INCOSE
    team
  • Demonstrate Text-Based Requirements prototype
    implementations
  • Start work on Property-Based Requirements model
  • Deliver PAS 20542 for ballot
  • Develop AP 233 module tree
  • Close the deal with Sponsors

24
T20 Process Plant
  • Accomplishments in Myrtle Beach (1/2)
  • Modules of 10303-221 reviewed
  • Module hierarchy of structure and classification.
  • Dependency on foundation modules from the PDM set
    of modules.
  • Relation between modules for PLCS and AP221
    projects.
  • Intelligent schematics modules
  • Build on AICs
  • References to ISO15926

25
T20 Process Plant
  • Accomplishments in Myrtle Beach (2/2)
  • 10303-227 ed2
  • CD ballot approved, issues discussed during
    previous week including shipbuilding requirements
  • Explored advanced use by AP227 of object models
    in an External RDL
  • Data sheets standards
  • Update on USA data sheet workshop
  • Agreed to liaise with other worldwide data sheet
    developments.
  • Agreed to hold a workshop on data sheets in
    Stockholm

26
T21 Oil Gas
  • Accomplishments in Myrtle Beach
  • 15926-1 Overview and fundamental principles and
    ISO 15926-2 Data model
  • Initial review and discussion of DIS ballot
    comments
  • Developed a detailed plan for the finalization of
    the FDIS
  • ISO 15926 Reference data
  • Discussed with PLCS co-operation on joint
    development of reference data
  • ISO 15926 - Templates
  • Templates were discussed and the team decided to
    develop a combined NWI and CD proposal

27
T21 Oil Gas
  • Plans between now and Stockholm (1/2)
  • ISO 15926-1 Overview and fundamental principles
    and ISO 15926-2 Data model
  • Prepare draft FDIS documents for final review at
    the Stockholm meeting
  • ISO 15926-7 Templates
  • Develop draft NWI and CD proposals

28
T21 Oil Gas
  • Plans between now and Stockholm (2/2)
  • ISO 15926 Reference data
  • Submit for ballot the NWI documents for an ISO
    Register for process plant reference data
  • NWI proposal
  • ISO 15926-4 Initial reference data - CD proposal
  • ISO 15926-5 Procedures for registration and
    maintenance of reference data - CD proposal
  • ISO 15926-6 Scope and representation of
    additional reference data - CD proposal

29
T21 Oil Gas
  • Plans for Stockholm
  • ISO 15926-1 Overview and fundamental principles
    and ISO 15926-2 Data model
  • Final review of the FDIS documents
  • ISO 15926 Reference data
  • Present and discuss the proposal for an ISO
    Register for process plant reference data
  • ISO 15926-7 Templates
  • Present and discuss the draft NWI proposal

30
T22 Building Construction
  • Accomplishments in Myrtle Beach (1/2)
  • 10303-236 Furniture
  • Start development of CD
  • SCDAEC, KOSDIC and STEP-CDS initiatives
  • Updates on status of implementations
  • Decision concerning 5 issues
  • Cooperation with TC211
  • First meeting to inform each other
  • Outline of joint work item

31
T22 Building Construction
  • Accomplishments in Myrtle Beach (2/2)
  • Joint meeting with IAI
  • Clarification of PAS assessment process
  • Outline and tentative schedule of future
    harmonization

32
T22 Building Construction
  • Plans between now and Stockholm
  • 10303-236 Furniture
  • Continue CD development
  • Cooperation with TC211
  • Read each others relevant documents
  • Cooperation with IAI
  • Contribute to assess PAS proposal

33
T22 Building Construction
  • Plans for Stockholm
  • 10303-236 Furniture
  • Review first draft of CD
  • SCDAEC, KOSDIC and STEP-CDS initiative
  • Updates on status of implementations
  • Cooperation with TC211
  • First draft of joint work item
  • Cooperation with IAI
  • Contribute to prepare PAS balloting

34
T23 Ships
  • Accomplishments at Myrtle Beach
  • 10303-216 undergoing DIS ballot and in good shape
    from advance comments.
  • 10303-226 undergoing CD ballot and in need of
    serious redesign to meet T23 interoperability
    goals
  • 10303-227 CD report shows T23 needs addressed

35
T23 Ships
  • Plans for Stockholm
  • 10303-216 DIS ballot workshop to prepare IS
    documents
  • 10303-234 WD review
  • 10303-226 CD ballot workshop tentatively planned
    to prepare DIS documents (dependent on
    identification of new project leader and new
    editor)

36
T24 Manufacturing
  • Accomplishments in Myrtle Beach (1/3)
  • NWI/PWI (AP2XX or AP-213 TBD) for Process
    Planning to be developed by USA and Japan.
    Description of material removal operations with
    sufficient detail for execution by an NC
    Controller will be documented as OUT of scope in
    AP2XX/AP213

37
T24 Manufacturing
  • Accomplishments in Myrtle Beach (2/3)
  • 14649-12 (Turning) CD Ballot to be submitted to
    SC1 Secretariat
  • 14649-13 (Wire EDM) CD Ballot to be submitted to
    SC1 Secretariat
  • 10303-238 (Integrated CNC Schema) NWI/CD ballot
    to be submitted to SC4 Secretariat
  • NWI/PWI (AP2XX or AP-213 TBD) for Process
    Planning to be developed by USA and Japan.
    Description of material removal operations with
    sufficient detail for execution by an NC
    Controller will be documented as OUT of scope in
    AP2XX/AP213

38
T24 Manufacturing
  • Accomplishments in Myrtle Beach (3/3)
  • SC1/WG7 will start working on operations for
    measuring machines
  • SC1/WG7 will start working on operations for
    machining centers
  • SC1/WG7 work is in progress on operations for
    rapid prototyping
  • SC1/WG7 is waiting for more input on grinding,
    bending and cutting

39
Vacancies
  • Deputy convener of WG3
  • Leader of T19
  • Deputy leaders of T1, T19, T20, T21, T22