Transcript and Presenter's Notes

Title: Sin ttulo de diapositiva


1
IAEA 21st  METTING OF THE TWG-NPPCI         
VIENNA (22-25  MAY 2007)
SPAIN NATIONAL REPORT ON IC
MODERNIZATION ACTIVITIES IN NUCLEAR POWER PLANTS
Juan Atanasio Carrasco (Almaraz-Trillo)
Rafael Cid (CSN)
2
Contents
  • Spanish Nuclear Sector summary
  • Modernization Strategies and their status
  • Modernization examples
  • BWR GE detail
  • PWR W detail
  • PWR KWU detail
  • Example of the Modernization Strategy of
    Cofrentes (simplification of EPRI one)
  • IC licensing in Spain
  • Ideas for the work of the IC IAEA group

3
Spanish Operating Nuclear Facilities
4
Spanish Operating Nuclear Power Plants
5
Spanish NPPs shareholders
() Nuclenor is owned by Iberdrola 50 and Endesa
50
6
Generation of Energy in Spain in 2006
Source UNESA
7
Spanish Nuclear Industry Capacities (1)
  • Engineering companies
  • Empresarios Agrupados
  • Iberinco
  • Soluziona
  • Tecnatom (owns all the full-scope simulators)
  • ITER Project European Legal Entity in
    Barcelona
  • start-up at the end of 2006
  • great opportunity for the Spanish industry

8
Spanish Nuclear Industry Capacities (2)
  • Main heavy components company
  • ENSA - Reactor Vessels (PBMR Southafrica)
  • - Steam Generators (United States)
  • - Pressurizer
  • - Spent fuel racks (China)
  • - Spent fuel casks
  • Fuel company
  • ENUSA - PWR - Germany
  • - BWR - Belgium
  • - Gadolinium cladding - Finland
  • - France
  • - Sweden
  • - United States

9
Spanish Nuclear Industry Capacities (3)
  • Public company in charge of the management of
    the radioactive wastes
  • ENRESA - Storage of low and interm. level at El
    Cabril
  • - ISFSI at Trillo NPP (storage of spent fuel)
  • - ISFSI at José Cabrera NPP (storage of spent
    fuel and high level), under construction
    (2008)
  • - Centralised ISFSI without site decision
    (20011?)
  • Energy, Environment and Materials Institute
  • CIEMAT - Mantains shares of ENRESA and ENUSA
  • Spanish Regulatory Body
  • CSN, Consejo de Seguridad Nuclear

10
Economic figures of the Spanish Nuclear Sector
Inversion 202,4 M
Turnover 2.385,4 M
Direct Effect in Spanish Economy
Generated Employment 15.713 jobs
Gross Value Added GVA 1.998,4 M
Indirect Effect (Commercial Relationships with
Production Centres)
Gross Value Added GVA 301,8 M
Generated Employment 6.226 jobs
Induced Effect (Increase in family expenses)
Gross Value Added GVA 373,6 M
Generated Employment 8.241 jobs
Total Effect in Spanish
Economy
Gross Value Added GVA 2.673,8 M
Generated Employment 30.180 jobs
Source Foro Nuclear 2004
11
Modernization Strategies and their status
  • All the Spanish NPPS are in a modernization
    process
  • The control rooms will have a Hybrid Human
    Machine Interface
  • Without complete modernizations in one outage
  • Without strategic alliances with one supplier
    (although main suppliers are preferred)
  • The changes start in Non safety (although key
    safety systems are also modernized)
  • The simulator is used previously
  • Bigger modernization changes
  • Vandellós II (Plant computer, Turbine control,
    PLCs, )
  • Ascó I y II (Turbine control, Reactor control,
    PLCs, )
  • Almaraz I y II (Turbine control, Reactor and BOP
    control in process, )
  • Trillo (Teleperm XP installation in YG30, MAE and
    Telecontrol, )
  • Garoña (Condensate control, Rod Control, Plant
    computer, Recirculation control, Power Range
    Neutron Monitoring System, )
  • Cofrentes (BOP control, Turbine control in
    process, )

12
Modernization Strategie Example Cofrentes (GE)
  • Platforms for digital IC
  • Non Safety Honeywell TPS GE Mark VI
  • Safety Numac Other (non decided yet)
  • Plan for bigger modernizations
  • 2009
  • Turbine and Bypass Control
  • Neutron Monitoring System (PRM)
  • Plant Process Computer
  • 2011
  • Plant Process Computer
  • Feedwater Control
  • Rod Control Information System
  • 2013
  • Recirculation Control
  • ECCS Controls

13
Modernization Strategie Example Almaraz I II
(W)
  • Platforms for digital IC
  • Non Safety Ovation
  • Safety Other (non decided yet)
  • Plan for bigger modernizations
  • 2007
  • Reactor Control
  • BOP Control (MSRs)
  • 2008
  • Process Computer
  • Auxiliary Feedwater Turbopump Control (Safety)
  • BOP Control (MSRs)
  • 2009
  • Process Computer
  • Auxiliary Feedwater Turbopump Control (Safety)
  • BOP Control (Heaters)
  • Generator sequencers

14
Almaraz IC Plan
15
Modernization Strategie Example Trillo (KWU)
  • Platforms for digital IC
  • Non Safety Teleperm XP (SPPA T2000)
  • Safety TXS is the normal evolution
  • Plan for bigger modernizations
  • 2007
  • Neutron Measurement Calibration (Aeroball system)
  • Plant Process Computer
  • 2008
  • Plant Process Computer
  • Refueling Machine
  • Turbine Control
  • 2009
  • Plant Process Computer
  • Refueling Machine
  • Turbine Control

16
Trillo IC Plan
17
Cofrentes IC Plan Objective
18
Cofrentes IC Plan Objective
19
Cofrentes IC Plan Methodology
20
Cofrentes IC Plan Methodology
21
Cofrentes IC Plan Methodology
22
Cofrentes IC Plan Methodology
23
Cofrentes IC Plan Methodology
24
Cofrentes IC Plan Preliminary Classification
25
Cofrentes IC Plan Platform Structure
26
Cofrentes IC Plan Platform Structure
27
Cofrentes IC Plan Platform Structure
28
IC Licensing in Spain
  • Safety Guide 1.11 of the Regulatory body -gt
    Similar to 10CFR 50.59
  • Referencia a la USNRC Reg. Guide 1.187, EPRI
    TR-12348 Rev1 NEI 01-01 y al NEI 96-07 rev.1
  • A comom guide for IC licensing has been
    developed in the sector
  • Regulation of the original country of each NPP
  • In the case of an American Plant the main
    regulation is
  • 10CFR50 Domestic Licensing of Production and
    Utilization Facilities
  • 10CFR50.59 Changes, Tests and Experiments
    Cambiada en año 1999.
  • 10CFR50 Appendix A. General Design Criteria for
    NPPS
  • 10CFR50 Appendix B. Quality Assurance Criteria
    for NPPS and...
  • What about European Guides/Other Guides? Their
    use depends of their consideration in the
    original country of each NPP and the position of
    goups like this

29
UNESA-6 Guide Agreement in Spanish Sector
Based on EPRI TR-12348 Rev1 NEI 01-01
30
Details of IC Dev. Process
  • Tipical engineering Process
  • The specification is the Key Phase
  • The technical Evaluation is simplified when a
    cualified equipment is used
  • In Safety Systems it is needed an independent VV
  • The Regulatory Body appears from the begining
  • The licensing process is completely defined

31
Ideas for the work of the IC IAEA group
  • Practical details on normative (classification
    examples in Europe and USA 10CFR50, RSK, IEC
    61226, IEC61508, )
  • Practical examples of configuration control in
    real control systems
  • Definition of dedication tests
  • Summary of Modernizations (finished and in
    process)
  • Of bigger systems
  • Of smaller systems (mainly 1E)
  • Training courses in modernized simulators
  • Modernization seminars (like the Nuclear Seminar
    on Nuclear Automation de 2004 organized by NSSK)
  • Contacts with other sectors (trains, planes,
    refineries, ...)