1Pilot study on the adoption of the Pollution
Reduction Programme the industrial case studies
- Aims
- Selection criteria
- Participants
Dr. Bruno Pennelli Dr. Marina Foschia
2TRIBOMETAL 1.Environmental concern
- Substance lead (Pb)
- River flow rate 6.88 m3s-1
- Discharge flow rate 0.0556 m3s-1
- Pb concentration allowed in the outlet 0.5 mgl-1
- Pb in the outlet found up to 10 fold higher
- July 2004 monitoring revealed Pb concentration in
Orava to increase from 0.0024 mg l-1 to 0.021 mg
l-1
3TRIBOMETAL 2. Technological processes
responsible for release of Pb
- Electroplating (electrolytes and reagents)
- Teflon-lead powder mixture
- Possible formation of Pb-compounds that reduce
the Neutralisation efficiency
4TRIBOMETAL 3. Feasible technical improvements
- Since all existing technologies are compliant
with IPPC, improvements could address - A more accurate internal chemical monitoring of
process waters and wastewaters - The set up of an ion-exchange column
- Change of reagents, internal procedures
- Acidification of waste waters
5SLOVNAFT 1.Environmental concern
- Maly Dunaj - 2 emission points of cooling waters
- River flow rate 8.25 m3s-1
- Discharge flow rate 2.3148 m3s-1
- Dunaj - 1 emission point of process waters
- River flow rate 838 m3s-1
- Discharge flow rate 0.4756 m3s-1
6SLOVNAFT 1.Environmental concern
- Substances
- AOX (indicators of specific dangerous substances
as Cl-derivates) - NEL (indicators of Aromatic-like specific
dangerous substances)
7SLOVNAFT 2. Technological processes responsible
for emissions
- AOX
- By-products of the
- Reforming process catalysation (Al Cl3)
- Ethylbenzene plant
- Chlorination of cooling waters
8SLOVNAFT 2. Technological processes responsible
for emissions
- NEL in cooling waters
- Spillages into the cooling pipeline system
- Hydrocarbon background in water table
- Insufficient removal of dissolved hydrocarbons
- NEL in process waters
- no specific point release assessed
9SLOVNAFT 3. Feasible technical improvements
- Monitoring of groundwater dynamics
- Monitoring of waste water chlorination treatment
for AOX compounds - Monitoring of the external wastewaters by means
of an inspection protocol for dangerous
substances (namely formaldehyde)
10TESLA 1.Environmental concern
- Substance nickel
- Environmental Quality Standard 0.6 µg l-1
- River flow rate at the discharge 0.216 m3 s-1
- Discharge flow rate 0.0022 m3 s-1
- Ni concentration at discharge likely to be
reduced 10 fold following the application of PRP
11TESLA 2. Technological processes responsible for
release of dangerous substance
12TESLA 3. Feasible technical improvements
- Renewal of the neutralisation plant
- Set up of an ion exchange column in the case of
excess of Ni discharge
13TESLA Comments
- Primary needs of Tesla according to the Twinning
group - Set up of health and safety devices
- Renewal of electroplating line, trichloroethylene
rinsing device and neutralization station