Title: Alastair Keir, Director of Operations
1Alastair Keir, Director of Operations 22nd June
2007
Our mission is to work with the public sector to
reduce carbon emissions through investment in
energy efficiency and renewable technologies.
2What can Salix do for you?
- Salix can help your university cut energy bills
and reduce carbon emissions. - We provide funding and focus for capital projects
on a match funded basis
3Salix Finance what do we do?
- We stimulate investment by establishing
ring-fenced, interest-free funds matched by the
public sector - Our funds recycle savings back to the
organisation - Funding between 100k and 500k
- We insist on cost-effective projects with a high
persistence and CO2 impact
4What value do we add to our clients?
- We focus attention
- Provides focus around which action can be driven
- Makes energy management mainstream
- Accumulates and protects small projects
5What value do we add to our clients?
- We provide capital
- Capital budgets are under pressure
- Protects marginal energy efficiency spend
- Frees up resources for front-line services
6What value do we add to our clients?
- We provide advice and support
- Sharing experience and benchmarking
- Help with implementation e.g. tendering
7What value do we add to our clients?
- We protect reputation
- Tangible demonstration of action rather than
words - Anticipate policy constraints e.g. EPC
8Case study - Retrolux car park lightingBristol
City Council
Salix
- Investment of 41,000 on Retrolux energy
efficient lighting at Trenchard Street
multi-story car park. -
- Minimum expected annual saving of 19,000 and
95 tonnes of CO2. - Lower maintenance costs and increased public
safety.
925 Southampton Buildings, London WC2A 1AL t 020
3043 8800 f 020 3043 8799 info_at_salixfinance.co
.uk www.salixfinance.co.uk
10Case Studies Sports Hall Lighting LC 1
Caerphilly
BEFORE 18x400w SON 7.7kW. 300lux output. 2900
pa running costs.
11Case Studies Sports Hall Lighting LC 1
Caerphilly
- AFTER
- Load reduced by 35
- to just 5.0kW.
- 25 increase in lux to
- 411lx.
- Colour rendition 1B.
- PIR Control.
- 1800 saving p/a
- Payback 5.0yrs
- 22 Units 410/unit install
- 12.9TCO2 saved/yr
- .
12Case Studies Sports Hall Lighting LC2 Heolddu
BEFORE 18x400W Metal Halide 7.74kW. 120 lux
output. 2350 running costs
13Case Studies Sports Hall Lighting LC2 Heolddu
- AFTER
- Load reduced by 48 to just 4.05kW.
- 285 increase in lux to 360lx.
- Colour rendition 1B.
- PIR Control.
- 1600 saving p/a
- Payback 4.4yrs
- 11.46TCO2 saved/yr
14Case Studies Sports Hall Lighting LC3 Risca
- BEFORE
- 120x75W
- Fluorescents 8.4kW
- 166lux output.
- 2800 pa running
- costs.
15Case Studies Sports Hall Lighting LC3 Risca
- AFTER
- Load reduced by
- 39 to just 5.1kW.
- 111 increase in
- lux to 350lx.
- Colour rendition 1B
- PIR Control.
- 1800 saving p/a
- Payback 4.7yrs
- 12.9TCO2 saved/yr
16We fund cost effective energy efficiency projects
with good persistence
- Building fabric insulation
- Pipe insulation
- Boiler replacement
- Swimming pool covers
- Variable speed drives
- Energy management systems
- Lighting controls
- Heating controls
- Years
- 24.8
- 8.8
- 8.8
- 8.8
- 8.8
- 3.5
- 3.5
- 1.7
17We are seeing strong demand across the public
sector
- Our target is to be working with 80-100
organisations by April 2008 and to deliver carbon
savings of 0.1 million tonnes of carbon by 2010 - In our Local Authority Energy Financing pilot
scheme, around 560 projects are running with a
total value of 4.3m - Last year, we more than doubled our Local
Authority programme from 19 to 45 - We have started a pilot with 8 Universities and 4
NHS Foundation Trusts - We are talking to several Government departments,
including Defra, the Cabinet Office, CLG and the
National Archive
18Salix Finance our role
- Our role is to help public sector bodies reduce
energy costs and carbon emissions and show
leadership in tackling climate change by
providing funding - We are an independent not-for-profit company set
up by the Carbon Trust in 2004 - We have Government funding of 20m over two
years - We are an integral part of the UK Climate Change
Programme1 - 1 UK Climate Change Programme 2006
-