Title: DISCUSSION DOCUMENT


1
JLLIS Overview
DISCUSSION DOCUMENT
October, 2006
2
Contents
  • Background
  • JLLIS Development Timeline
  • Spiral 1 Scope Mockups
  • Roadmap of Future Capability

3
Contents
  • Background
  • JLLIS Development Timeline
  • Spiral 1 Scope Mockups
  • Roadmap of Future Capability

4
Background
  • Feb Apr 06
  • Conducted a technical, and high level
    capabilities evaluation, of both ALMS and LMS, to
    determine how well they meet the Joint Lessons
    Learned CDD Requirements
  • Created high-level mockups of future JLLIS
    capabilities
  • May Jun 06
  • Established subcontract with NSite to install and
    configure LMS for each COCOM
  • Jun Sept 06
  • Install and configure LMS for each COCOM on the
    SIPRNet and where appropriate NIPRNet
  • Sep Dec 06
  • JLLIS Spiral 1(v1.0) Development

5
JLLIS Development Principles
  • Users / action officers play a key role in
    defining the operational design of the system and
    validating the system was built according to
    specification
  • The system shall be user friendly, intuitive and
    require minimal training
  • The system shall be Net-Centric using the latest
    web and integration technologies
  • The system shall integrate with other
    systems-of-interest (DRRS, JDEIS, etc) to
    minimize rework and maximize information sharing
  • The development effort is collaborative -- all
    stakeholders will have input

JLLIS Net-Centric System Architecture Vision
6
Contents
  • Background
  • JLLIS Development Timeline
  • Spiral 1 Scope Mockups
  • Roadmap of Future Capability

7
JLLIS Development Timeline
PROPOSED
Today
JLLIS 1.0 Target Operational Date on SIPRNet
Jun 06
Sep 06
Feb 06
Dec 07
May 07
Sep 07
Spiral N

Architecture
V0.5 Dev (Initial Phase)
V1.0 Dev (Mid Phase)
V1.1 Dev
V1.2 Dev
Operations Maintenance
  • Milestones
  • Nov 17 JLLIS deployed to Unclass site for User
    Validation and Testing
  • Nov 17 Dec 15 Data Migration
  • Dec 15 - JLLIS Operational on SIPRNet V1.0

8
Contents
  • Background
  • JLLIS Development Timeline
  • Spiral 1 Scope Mockups
  • Roadmap of Future Capability

9
Spiral 1 JLLIS will deploy role based access into
a net-centric system
  • Spiral 1 JLLIS will be available at a single
    location for all users
  • One URL for all COCOMs
  • Access to data will be controlled by the logic
    internal to the JLLIS application
  • For example, a Lessons Manager from PACOM will
    have access to unpublished observations submitted
    by PACOM users, and will not have access to
    unpublished observations submitted by JFCOM users
  • Spiral 1 development will focus on a scalable
    extensible application

JLLIS
AllUsers
JLLISApplicationServer
JLLIS DatabaseServer
JCOAPublished Repository
10
JLLIS Spiral 1 Scope
Continued on next slide
11
JLLIS Spiral 1 Scope (continued)
12
JLLIS Spiral 1 Development Schedule
13
JLLIS Spiral 1 Login Page
Mockup will be added by Friday
14
JLLIS Spiral 1 Home Page
Mockup will be added by Friday
15
JLLIS Spiral 1 Add Observation Page
Mockup will be added by Friday
16
JLLIS Spiral 1 View Observation Page
Mockup will be added by Friday
17
Contents
  • Background
  • JLLIS Development Timeline
  • Spiral 1 Scope Mockups
  • Roadmap of Future Capability

18
JLLIS Proposed Operational Roadmap
19
Proposed set of Mockups for enhanced JLLIS
interface in future Spirals
Mockup will be added by Friday