Capital Cost (including planned commissioning cost capitilised) ... Construction time 30 months from authorisation to 1st briquette ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 9
Provided by: UP
Category:
Tags: briquette

less

Transcript and Presenter's Notes

Title: By Ei


1
Bad example
  • By Ei

2
Diagrams
  • Not legible

3
Animations and text
  • Project Parameters
  • Planned
  • Construction time
  • Commissioning time
  • Capital Cost (including planned commissioning
    cost capitilised)
  • Construction approach (turnkey or other)
  • Company engineering staff involvement
  • Project Outcome
  • Construction time
  • Commissioning time
  • Capital Cost (including planned commissioning
    cost capitilised)

4
Too long paragraphs and text transitions
  • The closest approximation of behavioral
    thresholds with the ASSR technique was at 1000 Hz
    whilst the poorest approximation was at 500 Hz.
    In an analysis of the difference between ASSR
    approximations of behavioral thresholds in the
    left ears (n6) compared to the right ears (n6)
    a slight increase in difference scores were
    noticed at all frequencies in the right ear. This
    may in part be attributed to higher modulation
    frequencies for the test frequencies in the right
    ear (91-99 Hz) compared to the modulation
    frequencies in the left ear (82-89 Hz). The
    sample, however, is too small to substantiate
    this inference.  

5
Graphs ( Heading contrast Incorrct)
  • Graphs too small and use of animation inicator
    unnessesary

6
Too much text and picture behind does not work
  • Construction time 30 months from authorisation
    to 1st briquette
  • Commissioning time not clearly defined, but
    similar to Western Australia HBI duration of 6
    months
  • Capital cost (including planned commissioning
    cost capitalized) US797 million
  • Construction time 35 months from authorisation
    to 1st briquette
  • Commissioning time not fully commissioned (see
    notes below)
  • Capital cost (Including actual commissioning cost
    capitalized) US910 millionConstruction
    approach (turnkey or other) process design by
    VAI, self managed by Orinoco Iron (JV partner)
    using a number of construction contractors.
  • Company engineering staff involvement minimal