State%20Funding%20Constraints - PowerPoint PPT Presentation

About This Presentation
Title:

State%20Funding%20Constraints

Description:

State Funding Constraints – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 33
Provided by: axt3
Learn more at: https://www.kcda.org
Category:

less

Transcript and Presenter's Notes

Title: State%20Funding%20Constraints


1
Why Build Portable?
  • State Funding Constraints
  • Cost
  • Time
  • Quality

2
Why Build Portable?
State Funding Portable construction not counted
on inventory
Definition Portable facility Portable
facility means any factory-built structure,
transportable in one or more sections, which
requires a chassis to be transported, and is
designed to be used as an educational space with
or without a permanent foundation when connected
to the required utilities. The structure shall
be trailer-able and capable of being demounted
and relocated to other locations as needs arise.
3
Why Build Portable?
Costs
5-25 or more savings depending on designs and
materials
4
Why Build Portable?
Time
Buildings can be built while the site work is in
progress
5
Why Build Portable?
Control
  • Units built in controlled environment
  • Assembly line process with quality control

6
Why Build Portable?
  • KCDA purchase options

7
Green Enhancements
  • High end low energy windows
  • High efficient HVAC units
  • Carpet with recycled materials and low VOC
  • Paint with low VOC
  • Insulation above minimum standards
  • DDC control system for efficient energy use

8
Green Enhancements
  • Sunshades, light shelves
  • Day lighting sensors in the classrooms
  • Operable windows for ventilation
  • Use of rain gardens
  • Portable manufacturing reduces
  • construction waste

9
Building The Portable
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
At The Site
21
(No Transcript)
22
(No Transcript)
23
(No Transcript)
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
What We Learned
What worked well?
  • Avoided Property Tax Increase
  • Utilized Mitigation Fees Highly Visible
  • Reduced Construction Costs
  • From Design to Occupancy In Months vs. Years
  • Designed to District Standards
Write a Comment
User Comments (0)
About PowerShow.com