Banyan Compression Services Ltd' - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Banyan Compression Services Ltd'

Description:

Banyan Compression Services Ltd. Who are we? Engineering Support ... BANYAN ERS 7400 150h.p. Compressor. Results: - Pre-Compressor: 42 m3/day oil. 9 e3m3/day gas ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 12
Provided by: ijban
Category:

less

Transcript and Presenter's Notes

Title: Banyan Compression Services Ltd'


1
Banyan Compression Services Ltd.
Who are we? Engineering Support Partnered with
Jiro Manufacturing What can we do for
you? Identify / Evaluate Reservoir / Facilities
/ Pipelines Design / Approvals Procurement /
Construction Start-Up / Monitoring Final
Evaluation, Reporting, and Recommendations Why
use us? Actual Field Successes We can do it
all We have a vested interest in your success
2
Applications for Screw Compressors
A INCREASED REVENUE OPERATIONS Wellsite
Pressure Boosting Gas Gathering Systems First
Stage Compression Oil Production Wells with
Artificial Lift In-Line Well Testing of Marginal
Wells Cyclic Production of Marginal Wells B
ENVIRONMENTAL CONSIDERATIONS Solution Gas
Recovery at Oil Wells Well Testing to Temporary
Pipeline C UTILITY Pipeline Testing
3
Oil Well with Artificial LiftOil Solution Gas
Flow Enhancement
Monthly Pay Out 2.25 days Total Increased
Revenue 1.0 MM/yr Based on 7400 Series rental
(6900/month), 53 CDN / e3m3 gas and 180 CDN /
m3 oil
4
Well Performance Chart
Flowrate (oil m3/d, gas e3m3/d)
Pressure (kPag)
5
1 Month Incremental Cash Flow Prediction
6
Artificial Lift Oil Well - Case Study
  • BANYAN ERS 7400 150h.p. Compressor
  • Results
  • - Pre-Compressor 42 m3/day oil
  • 9 e3m3/day gas
  • - Post-Compressor 58 m3/day oil
  • 12 e3m3/day gas
  • - Payout 2.25 Days
  • Benefit Increased Well Profitability

7
Inflow Performance Relationship (IPR Curve)
Flowing Pressure
Flowrate
8
Incremental Increases in Gas Flow
Flowing Pressure
Flowrate
9
Liquid Loading of a Gas Well
Flowing Bottom Pressure
Flowrate
10
AEUB / REGULATORY
AEUB Mandate to Reduce Flaring / Venting (G - 56
/ 60) Applications Testing for 21 days without
EUB application process Notifications -
landowner and occupants Noise Impact Assessment
- 220 h.p. is 40 dBA at 365 m Emissions - low
NOx emission technology is normally not required
11
Banyan Compression Services Ltd.
Step 1 Find Opportunity
Step 2 Check Product Status
Step 3 Check Reservoir Potential
Step 4 Design
Step 5 Construct / Install
Step 6 Monitor / Optimize
Write a Comment
User Comments (0)
About PowerShow.com