Title: Assignment of NTS Entry Capacity


1
Assignment of NTS Entry Capacity
  • Transmission Workstream 06 November 2008

2
Assignment is.
  • The Transfer of Financial Liability in addition
    to the Capacity Entitlement

3
Background
  • Historically NTS entry Capacity has been viewed
    as one product that is tradable.
  • Recently we have seen a marked interest in the
    introduction of an assignment process for NTS
    Entry Capacity
  • Via Customer Account Management
  • Via Review Group 221 (Review of Entry Capacity
    the appropriate Allocation of Risk)
  • Proposed introduction of assignment of NTS Exit
    Capacity as part of the proposed Reform of the
    NTS Exit Capacity arrangements has lent some
    impetus to these requests.

4
Background - Proposed rules for Assignment of NTS
Exit Capacity
  • User facility to assign all of its NTS Exit
    (Flat) Capacity obtained via long/medium term
    releases at an Exit Point to another User at the
    same Exit point from a specified day
  • Assigning user must notify the assignee user
    must confirm
  • Identities
  • Exit Point
  • Assignment date
  • Assignment will result in
  • Assigning Users Exit capacity holdings at the
    exit point will be reduced to zero the User
    will no longer be liable for capacity charges for
    the assigned quantity from the assignment date
  • Assignee Users exit capacity holdings will be
    increased accordingly and the User will become
    liable for capacity charges from the assignment
    date

5
First Steps
  • National Grid NTS wishes to establish
  • the level of industry interest
  • whether assignment should be Full, Partial or
    Both
  • whether a Modification or Review Group Proposal
    should be brought forward if so by National
    Grid NTS or the Industry
  • whether such a change will fall under the User
    Pays process
  • National Grid NTS to Initiate discussions with
    xoserve through the ROM (Rough Order of
    Magnitude) process to establish the complexity of
    the concept

6
Issues
  • Differences to NTS Exit Capacity
  • Majority of ASEPs are multi party
  • Entry Capacity is sold via multiple mechanisms
    QSEC/AMSEC/RMTTSEC/DRSEC with overlapping
    capacity periods
  • Multiple Bids consisting of varying prices i.e.
    each Entry Capacity sub transaction period can
    have a number of prices associated to it.
  • Complex change potentially impacting on a number
    of areas
  • Invoicing - Entry Capacity Invoice driven by
    specific Bid Information i.e. quantity price
    associated to a specific Bid ID Method of Sale
  • Trading would need to link traded capacity to
    specific Bid IDs (currently based on
    entitlements)
  • Transfer and Trade (Surrender)
  • Credit
  • Partial Assignment would need to identify which
    bits of capacity were to be assigned price
    impact on Assignee
  • Implementation Date / System Requirements
  • Unlikely to be able to complete any required
    system changes prior to 2010 at the earliest
  • Limited scope to offer a manual solution
  • Impact of / relationship with NTS Exit Reform

7
Next Steps