Notified bodies - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Notified bodies

Description:

Producer is fully responsible for the attestation that products are in conformity. For ALL attestation of conformity systems, the manufacturer establishes and ... – PowerPoint PPT presentation

Number of Views:37
Avg rating:3.0/5.0
Slides: 22
Provided by: claudeb8
Category:

less

Transcript and Presenter's Notes

Title: Notified bodies


1
Notified bodies under the Construction Products
Directive
Eric Winnepenninckx Belgian Building Research
Institute (BBRI-CSTC-WTCB) Chairman of the
Advisory Group of the Group of Notified Bodies
2
Notified Bodies
NB-CPD
  • Notified bodies take responsibilities in areas of
    public interest
  • Legal entities established on the territory of an
    EEA Member State
  • Accreditation to the EN 45000 or EN ISO/IEC 17000
    series of standards is a support to the technical
    part of notification, but it is not a requirement

3
Responsibilities for Member States
NB-CPD
  • MSs should add to their Notification criteria
  • Participation in the GNB
  • GNB document knowledge and their use
  • MSs should periodically subject their NBs to
    surveillance
  • To instil confidence in the system and therefore
    in CE Marking, MSs should coordinate notification
    criteria

4
NB-CPD
444 Notified Bodies from 26 countries (2006-03-01)
5
NB-CPD
444 Notified Bodies from 26 countries
(2006-03-01)(Germany not shown)
6
Role of Notified Bodies
NB-CPD
  • Producer is fully responsible for the attestation
    that products are in conformity
  • For ALL attestation of conformity systems, the
    manufacturer establishes and signs a declaration
    of conformity (before CE Marking)
  • Depending on the AoC system, the manufacturer
    requires a NB attestation
  • Systems 1 and 1 Certificate of product
    conformity
  • System 2 Certificate of FPC conformity
  • System 2 Initial FPC inspection report
  • System 3 Evaluation report(s) (test and/or
    calculation)
  • The involvement of a third party does not relieve
    the producer from any of his/her obligations

7
NB-CPD
  • In the framework of the CPD, NBs are notified
    for
  • Harmonised standards or ETA-Guidelines (and
    CUAPs) and specific test (or calculation) methods
    (for testing laboratories only)
  • Specific tasks certification, inspection,
    testing (or calculation)
  • Manufacturers can use NBs from any EEA country.

8
AoC systems
NB-CPD
9
The Group of Notified BodiesStructure Sector
Groups
NB-CPD
10
NB involvement in GNB Sector GroupsGNB Structure
Advisory Group
NB-CPD
  • Full members representatives of the national
    mirror-groups of NB-CPD
  • Associate members
  • ECC EFTA
  • CEN EOTA
  • observers
  • candidate countries
  • producers (CEPMC)
  • users (FIEC - UEPC)

11
NB involvement in GNB Sector Groups GNB
Structure Sector Groups
NB-CPD
  • Full members All the Notified Bodies in charge
    of AoC in the frame of the scope of the Sector
    Group
  • Associate members
  • CEN/TC(s) EOTA/WG(s)
  • observers
  • candidate countries
  • producers (Eurofederations)
  • users (Eurofederations)

12
Organizing towards Europe
NB-CPD
CTPC
Advisory Group
Evaluation commission
Romanian
representative
feedback
designation
Organisation of Romanian NBs
22 Notified bodies
13
Organising towards Europe
NB-CPD
  • Romanian Notified bodies should organize
  • Distribution of information
  • National discussion forum
  • Present feedback to evaluation committee
  • Nominate 1 representative
  • Example www.bucp.be
  • The Romanian representative is invited to the GNB
    Advisory Group
  • All NBs are automatically member of Sector
    Group(s) and should cooperate through CIRCA and
    meetings.

14
Group of Notified BodiesThe tasks of the GNB are

NB-CPD
  • to promote mutual confidence and transparency
    between all NBs and the enforcement authorities
    within the EEA
  • to achieve a consistent application of the
    conformity requirements by all NBs
  • to ensure that all information is available to
    all interested parties, on the scope and
    competence of NBs and the services provided
  • to contribute to the development of standards and
    ETAGs within the scope of the SGs, as far as
    evaluation of conformity is concerned

15
NB-CPD
http//europa.eu.int/comm/enterprise/construction/
16
NB-CPD
http//europa.eu.int/comm/enterprise/construction/
17
NB-CPD
18
NB-CPD
http//europa.eu.int/comm/enterprise/nando-is/cpd
19
NB-CPD
20
Goal of GNB documents
NB-CPD
  • GNB documents are developed in a democratic
    forum, based on consensus between all involved
    NBs
  • NBs should behave accordingly
  • MSs have been requested (EC GP A SCC meetings)
    to add their use as a notification requirement
  • Sometimes contain information that is also
    relevant to manufacturers
  • (relevant clauses) Should be withdrawn when
    documents with a higher status (e.g. EN / ETAG /
    CUAP) incorporate their content

21
Status and goal of GNB documents
NB-CPD
  • GNB Position Papers
  • Are not legal interpretations of the Directive.
  • They are not judicially binding
  • They do not modify or amend the Directive, EC
    Decisions and harmonised specifications in any
    way.
  • Goals
  • Ensure equivalent NB behaviour when performing
    attestation activities under the CPD
  • Add detail where this is missing in EN / ETAG /
    CUAP
Write a Comment
User Comments (0)
About PowerShow.com