Los Banos Detention Dam - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Los Banos Detention Dam

Description:

Doug McElhinney, Project Manager. Kay Moore, Repayment Specialist ... Protects California Aqueduct / San Luis Canal and the Delta Mendota Canal. 9/17/2004 ... – PowerPoint PPT presentation

Number of Views:63
Avg rating:3.0/5.0
Slides: 13
Provided by: usbr
Category:
Tags: aqueduct | banos | dam | detention | los

less

Transcript and Presenter's Notes

Title: Los Banos Detention Dam


1
Los Banos Detention Dam
  • Safety of Dams Project

2
Introductions
  • Doug McElhinney, Project Manager
  • Kay Moore, Repayment Specialist
  • Craig Stroh, Financial Economist

3
Safety of Dams Process
  • SEED Funds (Non-Reimbursable Funding)
  • Comprehensive Facility Review
  • Issue Evaluation
  • SOD Funds (15 Reimbursable Funding)
  • Corrective Action Study
  • Modification

4
Los Banos Detention Dam
  • Zoned Earthfill Embankment Dam
  • Constructed in 1966
  • Reservoir Impounds 52,000 Acre-Feet
  • 167 Feet High, 1,370 Feet Long
  • Spillway 20 Feet Wide x 30 Feet High
  • Maintained by California DWR
  • Protects California Aqueduct / San Luis Canal and
    the Delta Mendota Canal

5
Issue Evaluation
  • Potential for Hydrologic Overtopping Investigated
  • Conservative Assumptions, No Site-Specific Data
  • Annual Probability About 1/1000
  • Loss of Life Estimated to be 11-24
  • Reclamation Guidelines Suggest Take Action
  • Subsequent CFR Advises Risks May be Lower

6
Risk Portrayal Diagram
7
Corrective Action Study
  • Decision Memorandum (November 2003)
  • Emergency Planning
  • Public Awareness
  • Hydrologic Studies
  • Water User Involvement/Repayment
  • Corrective Action Alternatives
  • Project Management Plan
  • Environmental Compliance
  • Preferred Alternative and Cost Estimates
  • Modification Report to OMB and Congress

8
Possible Alternatives
  • Raise the Dam
  • Increased Spillway Capacity
  • Smaller Dam Raise w/ Auxiliary Spillway
  • Build New Dam Upstream
  • Armor the Dam to Resist Erosion
  • Do Nothing

9
Cost and Schedule
  • BOR Estimated 17M to 29 M for Construction
    Costs in Jan 1987
  • DWR Estimated 11M to 61M for Construction Costs
    in Feb 2002
  • Scoping Meeting January 2005 ???
  • Typically Takes 5-10 Years from Start to Finish
    for SOD Modification Projects
  • 55 State/ 45 Federal Cost Share
  • CVP Repayment 15 of 45 (About 7)

10
Water User Communications
  • CVPWA Financial Affairs Committee
  • Progress Briefing Every Three Months
  • Letter to CVP Conveyance Contractors
  • Financial Reports Posted on the Internet

11
Standard Financial Report
12
Conclusion
  • Keep Water Users Informed
  • CVPWA FAC Proper Forum
  • Comments ?
  • Questions ?
Write a Comment
User Comments (0)
About PowerShow.com