Ongoing Activities related to WP4d control of networks - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Ongoing Activities related to WP4d control of networks

Description:

Cocktail Party Allegory. Control & Communication _at_ Link ping University. 3. Fredrik Gunnarsson ... A wireless network is feasible if there exists power levels ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 14
Provided by: eric430
Category:

less

Transcript and Presenter's Notes

Title: Ongoing Activities related to WP4d control of networks


1
Ongoing Activities related to WP4d(control of
networks)
  • Fredrik Gunnarsson, Erik Geijer Lundin
  • (PhD Stud David Törnqvist, Frida Eng)
  • (Prof. Ljung, Glad, Gustafsson, Hansson)

2
Cocktail Party Allegory
3
Activities in Brief
  • Characterizing Feasibility
  • Radio Interface Load Estimation
  • (Power Control)
  • Distributed (Radio) Resource Control
  • Stability Analysis

4
Characterizing Feasibility
  • Def. A wireless network is feasible if there
    exists power levels to meet QoS requirements for
    all connections.
  • General
  • Downlink
  • Uplink
  • Advanced receivers

5
Radio Interface Load Estimation
  • Uplink

Radio Network Controller (RNC)
  • Relation to feasibility
  • Consistency
  • Convergence
  • Relation to Link Budgets

SHO meas
6
Evolved 3G
  • Enable higher data rates
  • Shorten delays
  • Adaptability

Mobility
RNC
RRM
Base Station
Power Control
7
Evolved 3G, Downlink (HSDPA / HDR)
  • Fast Resource Re-alloc (scheduling)
  • Fast and Efficient Retransmission
  • Short Transport Blocks (2 ms)
  • Better Power Utilization

8
Evolved 3G, Downlink, Contd
  • Scheduling
  • Using the Best Effort channel with Prioritization
    (e.g. streaming)
  • Transport data flow control

9
EV. 3G, DL Flow Control
Transport Network
Scheduler
RNC
Buffers
Flow Control
Base Station
10
Evolved 3G, Uplink (WCDMA Enhanced Uplink)
  • Fast Resource Re-alloc (scheduling)
  • Fast and Efficient Retransmission
  • Short Transport Blocks (2 ms)
  • Better Noise Rise Utilization

11
Ev 3G, Uplink, Contd
Mobility
RNC
  • Distributed Uplink RRM
  • Fast local node (re-)allocation
  • Feasibility / Robustness
  • Central node coordination.
  • Limited feedback
  • Mobile / Network centric
  • Distributed Uplink RRM
  • Fast local node (re-)allocation
  • Feasibility / Robustness
  • Central node coordination.
  • Limited feedback
  • Mobile / Network centric
  • Distributed Uplink RRM
  • Fast local node (re-)allocation
  • Feasibility / Robustness
  • Central node coordination.
  • Limited feedback
  • Mobile / Network centric
  • Distributed Uplink RRM
  • Fast local node (re-)allocation
  • Feasibility / Robustness
  • Central node coordination.
  • Limited feedback
  • Mobile / Network centric

RR Coord
Base Stations
Network-centric
Network-centric Mobile-centric
12
Uplink Tranmission Timing
13
Planned Contrib, First 9 mo
  • Control Problems within Wireless Communications
  • Uplink Distributed RRM
  • Decentralized control with central node
    coordination
  • Feasibility and robustness analysis
  • Base station-centric vs. Mobile-centric
    algorithms
  • Downlink transport data flow control
Write a Comment
User Comments (0)
About PowerShow.com