Title: www'svo'aero
1SHEREMETYEVOinternational airport
2Joint Stock Company Sheremetyevo International
Airport results of 2004
- 153 k movements
- 12,9 mln passengers
- 141 k tons of cargo
- Revenue - RUR 4,5 billion
- Net profit - RUR 736 million
- with the exception of the affiliated and
dependent structures
3Revenue structure 2004
4Number of passengers serviced at the Moscow
airports SVO has significantly exceeded the
level of 1990
5Sheremetyevo is leading in SCHEDULED traffic
Year 2004 Source TKP
6SVOs leadership is vividly demonstrated in the
INTERNATIONAL scheduled traffic sector.
Year 2004 Source TKP
7SVO handles 34 of Moscow scheduled domestic
traffic
Year 2004 Source TKP
8Scheduled international traffic is Sheremetyevo
Airports priority
9EuroAsia is the main destination of SVO passenger
traffic
10Sheremetyevo International Airportadvantages
and disadvantages
- Advantages
- The largest volume of the scheduled international
traffic in Russia - Presence of two global alliances - Sky Team and
Star Alliance - Available space for the terminals and other
passenger infrastructure expansion - The shortest distance to Moscow downtown,
business centers and the administration
authorities of the State - III-rd category from 2 directions
- Both way international domestic transfer
services has been recently implemented - Highest level of security, experience in
servicing US bound flights
- Disadvantages
- Overcapacity of the out-of-date terminals
- Quality of services requires significant
improvement - Limited aerodrome and airspace handling capacity
- Reconstruction and development activities absence
for a long period of time - Low quality of ground transport service to/from
the airport, no rail way
11SVO strategic prospects and values
- To represent Russia with dignity, to be the main
air gateway to the country - To become a global leader in the airport
management sector - To maximize stock value
- To establish trustworthy and transparent
relationships with the partners - To be reliable and powerful partner to airlines
- To be attractive and socially responsible employer
12Strategy targets
- To increase terminals, runways and airspace
capacity - To reorganize the ground-handling scheme, to
bring quality in compliance with the
international standards, passengers and airlines
expectations. - To attract co-businesses to the airport, to
develop concession mechanism - To increase transfer passenger throughput up to
30 by 2010 - To organize speed ground transport links to
Moscow (step by step, by 2007) - Railway 30 minutes to downtown
- Express road 10 minutes to MKAD (Moscow Ring
Road) - Taxi service international quality and fixed
rates.
13Perspective projects at Sheremetyevo 2005 2007
Moscow St. Petersburg Express road
New terminal (next to Terminal 1 reserve for
wave reconstruction
New rapid exit taxi ways construction and
runways reconstruction
Railway link to Moscow
Reconstruction and enlargement of Terminal 2
Fuel-supply complex reconstruction and expansion
Terminal 3
14Terminal1 development concept.
- A new building and a parking area in Terminal-1
sector - Total area 31250 sq. meters
- Capacity 5 mln passengers annually
- Commercial area 30
- Parking for 800 cars
- Total cost USD 76,5 mln
- Operational by Dec. 2006
-
- The reserve for possible future wave overall
sector reconstruction
15Terminal 2 key element of Sheremetyevo airport
infrastructure
- Terminal 2 was opened for the Olympic Games on
May 6, 1980 and has been intensely operating for
25 years without any major repairs. - Terminal area constitutes 100 K sq. meters, it
was designed for up to 7 mln passengers per
year. In 2004 Terminal 2 handled about 8 mln
passengers.
16Terminal 2 expansion and its integration with
Terminal 3.
- Terminal 2 reconstruction and extension to
Terminal 3. - Total area 240000 sq. m.
- Terminal-2 capacity after reconstruction - 18 mln
passengers annually - Commercial area 30
- Parking area for 2500 cars
- Total cost USD 310,8 mln
- Operational by Dec. 2007
-
- In future, the symmetrical development in the
opposite direction is highly possible
T3
17 Terminal 3 project
- OAO Terminal, with 100 shares held by Aeroflot,
has started Terminal 3 construction - Total area 160 k sq. meters
- Capacity 9 mln passengers per year
- Total construction cost USD 500 mln
approximately - Commissioning term the end of 2007
- It is assumed that Aeroflot together with its
SkyTeam partners will be quartered in Terminal 3
18The improvement of the terminals commercial
efficiency
- Today, the duty free trade at Sheremetyevo is
mainly focused on alcohol, tobacco and cosmetics.
The offered snacks are not adequate in terms of
price-quality ratio. - To increase the profitability of the commercial
areas and to make the airport more attractive for
passengers it is necessary to improve quality and
to expand the range of the offered goods and
services. - At present, we are developing the concept of
commercial areas reorganization and management of
the tenants-concessionaires activities. The
worlds leading duty free operator Dufry is
involved and participates in the project.
19External traffic communicationdesign of the
motor and railway roads
20Sources of finance
- Own funds operation profitability and
insignificant debt enables to make considerable
investments for development purposes. - Loans Sheremetyevo Airports financial and
operational indices make the company an
attractive borrower. - The export credits the airport has a
possibility to acquire the imported equipment on
favorable conditions, with the support of the
export-import agencies of the producing
countries. - Project finance all the reconstruction plans
are drawn up in a form of the attractive
investment projects. - Concessionaires and partners funds.
- Federal budget for the development of the
airfield and other infrastructure which are not
subject to privatization.
21Sheremetyevo Airport the country insurance
policy leader.
- As a large international airport Sheremetyevo
Airport is in charge of risk management and
represents a reliable partner in particular, it
is evidenced by the airports liability insurance
program. - The airport civil liability insurance program,
implemented for the period August 15, 2005-
August 14, 2006, complies with all international
standards and requirements, qualifying the
insurance coverage for the international
airports. - The combined limit of the airports liability
constitutes record-breaking (for Russia) amount
of USD 500 mln, without any sub limits
restricting the insurance compensation payment to
passengers, airlines and third parties. The
insurance program as well includes the terrorism
acts risks with the liability limit of USD 50
mln. - The program of insurance and re-insurance was
developed jointly by the Russian and UK Aon
Corporation specialists. - Risks reinsurance shall be effected only in
international insurance companies with the
StandardPoors rating higher than BB.
22Insurance liability limits of world airports,
mln dollars
23Quick changes programredecoration and
terminal design improvement.
Replacement of ceilings and a new color solution
for Terminal 2 arrival zone Before After
24Quick changes program taxi service at
Terminal 2 - fixed rates and high quality
25Thanks for your attention!