HOST - PowerPoint PPT Presentation

1 / 41
About This Presentation
Title:

HOST

Description:

All operations will be automated and use as little paper as ... Try to get attendance numbers ahead of time and plan events/sites that are appropriately sized. ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 42
Provided by: ValuedGate545
Category:

less

Transcript and Presenter's Notes

Title: HOST


1

111111111111111111111111
SC4 Plenary Meeting
HOST GUIDELINES
ISO TC184/SC4 SECRETARIAT SC4 N1398
2
AGENDA
  • Policy
  • Meeting Approval Process
  • Host Role
  • Meeting Support
  • Facility Fees
  • Secretariat Operations
  • Meeting Room Setup Diagrams
  • Post Meeting Reports

3
POLICY for Hosting SC4 Meetings
  • SC4 Plenary Meeting locations are rotated among
    venues in Europe, Pacific Rim, and North America.
  • Any entity can volunteer to host a SC4 Plenary
    Meeting SC4 determines the suitability of the
    offer and makes the final determination to accept
    the offer.
  • TC184/SC4 Meetings are not marketing
    opportunities.

4
POLICY for Hosting SC4 Meetings
  • All operations will be automated and use as
    little paper as possible.
  • Every effort should be made to reduce meeting
    costs to the minimum.

5
POLICY for Hosting Meetings
  • Full and detailed financial disclosure of meeting
    income and expense is required to be submitted to
    the SC4 Secretatiat within 30 days of the meeting
    closure.
  • All Plenary Meeting attendees must be treated
    equally -- with no discrimination regarding
    facility fees.

6
POLICY for Hosting Meetings
  • Meeting participation is not conditional upon
    payment of any fees
  • If a meeting facilities fee is to be charged
    attendees, it must be based strictly on direct
    costs for hosting meeting (i.e., only covers
    actual expenses of hosting the meeting).
  • Hosts are not allowed to make a "profit" from the
    meeting fees assessed to Plenary delegates

7
POLICY for Hosting Meetings
  • Venue for a particular meeting must be located in
    a safe place. The meeting location cannot be one
    which places meeting attendees personal safety at
    risk.
  • Note SC4 Meeting Host Guidelines are published
    in document N1398 that is posted on the SC4 web
    site and distributed at Host Planning meetings.
    Extra copies available from SC4 Secretariat.

8
Meeting Approval Process
Planned Future Meetings
  • Potential meeting host makes informal offer to
    host a future meeting with a proposed location
    and date.
  • SC4 leadership determines that no known schedule
    or other conflicts exist.
  • Meeting place and date are informally placed as
    tentativelyplanned future meeting on the
    official SC4 web site and meeting calendar.

9
Formal Proposal Example






10
Meeting Approval Process (contd)
Scheduled Future Meetings
  • Once determined acceptable, Secretariat issues
    formal acceptance letter to the host approving
    meeting date and venue.
  • Meeting place and date are placed as scheduled
    on the official SC4 web site and meeting
    calendar.

11
Acceptance Letter Example
12
Role of The Host
  • Facilitate SC4 Standards Development Process
  • Support Operational Needs of Meeting
    Participants and the SC4 Secretariat
  • Maximize Participation and Meeting Effectiveness
  • Assume Financial and Organizational Risk for the
    Entire Meeting Operation
  • Solicit additional meeting sponsors if desired to
    help defray meeting costs

13
SC4 Meeting Promotion
  • Meeting hosts are encouraged to
  • Promote SC4 meetings and activities on web sites
    and in selected technical journals
  • Solicit sponsors for defraying a part of the
    meeting costs
  • Sponsor social events
  • Provide facilities
  • Contribute equipment, manpower and supplies

14
Meeting Support
  • General
  • Adhere to cut-off dates for registration
  • Provide a preliminary and final attendee list to
    Secretariat and to attendees
  • Hotel guest room reservations can be arranged and
    controlled via the host and may offer potential
    advantages to the host.
  • (e.g., Funchal meeting used a travel agency)

15
Meeting Support (Contd)
  • General
  • Secure address and location for shipping and
    secure holding of materials before the meeting.
  • Secure FTP site for transmitting and holding
    electronic documents

16
Meeting Support (Contd)
  • Computer Support
  • Must have sufficient dedicated desktop MS/DOS
    computers with CD drive, floppy drive, internet
    access (including wireless), M/S Office installed
    and dedicated printer with supplies for meeting
    delegates to use.
  • Note Last few meetings a separate room was
    available for delegates to use the host-provided
    computers. They averaged 4 computers plus 3
    hookups for laptops (now considered as a bare
    minimum recommend considering additional!) .

17
Meeting Support (Contd)
  • Computer Support
  • Strongly recommend using a Master or Server
    to hold SC4 meeting proceedings and
    presentations.
  • Meeting information and other conference
    information should be available under a folder
    named SC4 Share.

18
Meeting Support (Contd)
  • Computer Support
  • CD Read/Write drive on Master or Server
  • Dedicated black/white printer
  • Hookups for laptop connections to LAN

19
Meeting Support (Contd)
  • Facilities
  • Approximately 15 breakout rooms with power
    strips, projectors, screens, drinking water
  • Registration Area
  • Lockable Host Office
  • Lockable Secretariat Office
  • General Meeting Room to accommodate all attendees
    (sometimes up to 200 persons)

20
Meeting Support (Contd)
  • Facilities
  • Arrange local transportation for attendees to get
    to meeting activity locations and back.
  • Recommend all attendees stay in one place and
    conduct meetings in that same place.
  • SC4 Meeting Room requests are handled by the Host

21
Meeting Support (Contd)
  • Facilities
  • Provide attendees information about the meeting
    host country e.g. visa requirements, quarantine
    regulations, (on a host-provided website),
    specific challenges in getting to the meeting
    site)
  • Recommend wireless contact capability for host
    staff during meeting

22
Meeting Support (Contd)
  • Meeting Supplies
  • Copy machine supplies for about 10,000 copies
  • Supplies for two offices (paper, pens, tape,
    staplers staples)

23
Meeting Support (Contd)
  • Food and Beverage
  • REQUIRED morning and afternoon breaks
  • OPTIONAL (but traditional, and strongly
    recommended) Lunch and breakfast each day
  • Provision for special diets (vegetarian,
    kosher,...)

24
Meeting Support (Contd)
  • Ancillary Events
  • Receptions and Social Events are not required but
    are traditionally provided (these are excellent
    opportunities for the Host to promote their
    country).
  • Try to get attendance numbers ahead of time and
    plan events/sites that are appropriately sized.
  • Plan for shuttle transportation to and from
    social events.

25
Facility Fees
  • Attendees are expected (not required) to pay a
    reasonable fee to offset facility expenses.
  • The Secretariat and ISO Staff do not pay meeting
    or facility fees.
  • Social events they attend will be paid for
    separately.
  • Secretariat staff will pay per diem allowance
    for provided meals and break-time refreshments.

26
Facility Fees (contd)
  • Financial Aspects
  • ISO does not authorize charging a registration
    fee but many attendees are able to be reimbursed
    for an optional facilities fee
  • All attendees must be equally assessed the same
    facilities fee (no discounts nor other forms
    of discrimination allowed).

27
Facility Fees (contd)
  • Financial Aspects
  • Plan on how to handle funds (credit cards,
    checks, )
  • Advance collection recommended
  • Adhere to cut-off dates for meeting registration
  • Provide a Preliminary and Final attendance list
    to the SC4 Secretariat and to attendees

28
Attendance and Facilities FeeRecent Experience
29
SC4 Secretariat Operations
(Contd)
  • Provide a separate, secure and lockable room
    (Secretariat Office), dedicated to Secretariat
    operations.
  • Secretariat office must be convenient for
    delegates to access.
  • Provide workspace and power sources for three
    laptops and an additional open work table.

30
SC4 Secretariat Operations
(Contd)
  • At least one telephone line to allow attendees to
    reach the Secretariat and for Secretariat
    personnel to have internet access. The telephone
    should enable local calls and long distance toll
    calls (i.e., long distance to be paid by caller
    credit card).
  • Printer with supplies for at least 1500 pages.
  • The Secretariat may use the same copier as the
    host provides for meeting attendees.

31
SC4 Secretariat Operations(Contd)
  • A dedicated desktop MS/DOS computer with CD
    drive, floppy drive, and internet access, M/S
    Office installed (not located in Secretariat
    Office).
  • NOTE This workstation should be publicly
    available for meeting delegates to access SC4
    documents and presentations

32
SC4 Secretariat Operations (Contd)
  • One (1) projector (beamer) for each meeting that
    the Secretariat participates in, i.e. Sunday PPC
    and PPC/Convenors meetings, and
  • two (2) beamers for the Monday Opening General
    Meeting, Wednesday Liaisons General Meeting,
    Friday Closing General Meeting, and Friday SC4
    Plenary Meeting.

33
SC4 Secretariat Operations (Contd)
  • Adequate power and extension cords for all of the
    above.
  • Meeting room setup as described in the following
    diagrams

34
MEETING ROOM SETUP
2 Screens 2 Projectors
Power Strips/Sources for Projectors each
Delegate
All General Meetings
35
MEETING ROOM SETUP
1 Screens 1 Projectors
Power Strips/Sources for Projectors each
Delegate
All PPC PPC/Convenors Meetings
36
MEETING ROOM SETUP
2 Screens 2 Projectors
U- shape Seating arrangement for National Body
Delegates
National Body Delegate Seating sequence
determined by Host
Theater Style for Extra Attendees
SC4 Business Meeting
37
Post Meeting Report
38
FUTURE MEETINGS
  • SCHEDULED
  • Fall 2003 - Poitiers France 26-31 Oct
  • Spring 2004 - TBD
  • Summer 2004 TBD

39
FUTURE MEETINGS
  • PLANNED
  • Spring 2004 - North America
  • Summer 2004 - Bath, United Kingdom
  • SC4 20th Anniversary Meeting
  • Fall 2004 - Brazil?? Central America??
  • Spring 2005 - Brazil?? Central America??
  • Summer 2005 - France??
  • Fall 2005 - China
  • Spring 2006 - Australia / New Zealand

40
  • For Information
  • Meeting Information and Meeting Request Form
    Posted on
  • WWW.TC184-SC4.Org

41
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com