Week in Review: 10/28/02 - 11/03/02 - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Week in Review: 10/28/02 - 11/03/02

Description:

Stack and Store week. Second best delivered luminosity. Tev problems ... Time off by one hour in this plot. All Experimenters' Mtg - 4 Nov 02. R. Moore - FNAL ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 11
Provided by: ronm162
Category:
Tags: offbyone | review | week

less

Transcript and Presenter's Notes

Title: Week in Review: 10/28/02 - 11/03/02


1
Week in Review 10/28/02 - 11/03/02
Ron Moore FNAL
  • Stack and Store week
  • Second best delivered luminosity
  • Tev problems with protons at 150 GeV
  • Shake, rattle, and roll Earthquake kills store

2
Store Summary
Store Initial Lumi Duration (hr) Termination Comments
1918 32.0 18.5 intentional
1921 33.3 24.7 intentional gt 1 pb-1 delivered
1924 8.0 3.9 Abort on TQFA4 Proton loss during pbar injections SQA4 bad table
1929 15.6 13.9 intentional Proton loss during pbar injections Pbar BLT off
1933 21.7 18.2 intentional Dampers off
1935 27.3 19.5 intentional Dampers on
1937 24.8 3.7 Earthquake, quench _at_ F48 Dampers off, pbar BLT off
3
(No Transcript)
4
(No Transcript)
5
Alaska Earthquake Ends Tev Store 1937
6
MI-8 Line Motion from Earthquake
Time off by one hour in this plot
7
Earthquake!
8
Machine Studies/Maintenance
  • Tevatron separator scans at IPs (position)
  • Maximize luminosity very minor improvements
  • Tev damper study at 150 GeV
  • Dampers cause proton loss during pbar injections?
    No.
  • Investigate tune ramps during pbar injection
  • New A1 line lattice implementation
  • P1 line misbehaved after A1 line changes
  • Retreated to old A1 settings
  • Recycler energy correction with sextupoles
  • 24 MeV difference between MI and RR
  • Problem with correction last week now fixed

9
Separator Scan at D0
CDF Lumi
D0 Lumi
C4 separator voltage (kV)
10
Weekly Schedule
Write a Comment
User Comments (0)
About PowerShow.com